Home / Browse projects / Sindhudurg, Maharashtra / NIRMITEE SIDDHI

Completed No litigation declared Residential / Group Housing project

NIRMITEE SIDDHI

By NIRMITEE BUILDERS & DEVELOPERS

RG-MH-79188 · RERA P52900017028 · Last updated on MahaRERA portal: 12 Oct 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 4 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
12 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 55 documents Report an error

NIRMITEE SIDDHI is a Residential / Group Housing project by NIRMITEE BUILDERS & DEVELOPERS in Sindhudurg, Maharashtra, registered with MahaRERA as P52900017028 on 4 Jul 2018. The registration is recorded completed; possession was promised by 22 Dec 2024.

At a glance

Project

  • NameNIRMITEE SIDDHI
  • TypeResidential / Group Housing
  • Location
    • KUDAL RAILWAY STATION
    • NEAR KUDAL RAILWAY STATION
    • Kavilkate
    • Kudal
    • Sindhudurg
    • 416520
  • Pincode416520
  • RERA no.P52900017028
  • ReraGenie IDRG-MH-79188

Builder

  • NameNIRMITEE BUILDERS & DEVELOPERS
  • Entity typePartnership
  • PartnersAMOL ARVIND SHIRSAT, NEETA VIJAY PRABHU
  • Other registrations4 more →
  • Completed3 of 5
  • Declared earlier projects5 →

Key dates

this monthRegisteredJul 2018PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Jul 2018
  • Promised completion22 Dec 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed55 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA40000
B WINGNA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 12 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.

A WING55%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B WING55%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed162

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots162
Open Space162
BuildingOpen SpaceTotal
A WING9797
B WING6565

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,100 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI7039.95
Proposed, not sanctioned7,040 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHOGHATE BUILDING PAN BAZAR TALUKA KUDAL, DIST SINDHUDURG

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAMEER BHALCHANDRA JOSHI
PartnerRole in project
NIRMITEE BUILDERS & DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jun 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Aug 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Sep 2022

Documents filed55

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf12 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: NBD SIDDHI-FORM 5-22-23.pdf5 Oct 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf23 Jan 2023
Declaration about Commencement CertificateFile: Declaration about commencement certificate 18.pdf21 Jan 2023
Declaration about Commencement CertificateFile: Declaration about commencement certificate 20.pdf21 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 9.pdf21 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 10.pdf21 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 11.pdf21 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - 12.pdf21 Jan 2023
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf19 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate (Form 1).pdf19 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate.pdf19 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf19 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: NBD-21-22-SIDDHI-FORM 5.pdf19 Jan 2023
Proforma of Agreement for saleFile: Proforma of Agreement for sale.pdf19 Jan 2023
Certificates of CA (Form 3)File: Form 3.pdf18 Jan 2023
Details of encumbrances concerned to LegalFile: Details of encumbrances.pdf17 Oct 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account Details.pdf17 Oct 2022
Deviation Report with respect to Allotment letterFile: Allotment Letter.pdf14 Oct 2022
Deviation Report with respect to model copy of AgreementFile: Agreement.pdf14 Oct 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf17 Sep 2022
CERSAI detailsFile: CERSAI Details.pdf10 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate FORM 2A.pdf31 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate FORM 2A.pdf31 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate FORM 2A.pdf31 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate FORM 2A.pdf31 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate FORM 2A.pdf31 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate FORM 2A.pdf31 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate FORM 2A.pdf31 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate FORM 2A.pdf30 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: NBD SIDDHI RERA 20-21.pdf17 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: NBD SIDDHI RERA 19-20.pdf16 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: 1291-2021.pdf28 Jul 2021
Building plan approvalFile: Plan.pdf24 Jul 2021
Building Plan Approval (IOD)File: Plan.pdf24 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf24 Jul 2021
Declaration about Commencement CertificateFile: Commencement Certificate.pdf24 Jul 2021
PAN CardFile: PAN Card.pdf19 Oct 2020
Layout approvalFile: Approved Plan.pdf6 Aug 2020
Copy of Layout Approval (in case of layout)File: Approved Plan.pdf6 Aug 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf6 Aug 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf19 May 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf15 May 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Siddhi.pdf14 Jan 2020
OtherFile: Permission.pdf30 Aug 2019
Layout approvalFile: Approval Plan.pdf23 Jun 2018
Copy of the legal title reportFile: Search Report.pdf23 Jun 2018
Copy of Layout Approval (in case of layout)File: Approval Plan.pdf23 Jun 2018
Declaration in FORM BFile: FORM B.pdf23 Jun 2018
Proforma of Allotment letterFile: Allotment Letter.pdf23 Jun 2018
Certificates of CA (Form 3)File: Certificate of CA.pdf22 Jun 2018
Building plan approvalFile: Approval Plan.pdf13 Jun 2018
Details of encumbrancesFile: Encumbrances.pdf13 Jun 2018
Building Plan Approval (IOD)File: Approval Plan.pdf13 Jun 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates.pdf13 Jun 2018

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Nirmitee AvighnaP52900049381Near Topiwala Vachanalay, Sindhudurg153Feb 2023OngoingDec 2028Not due yet
NIRMITEE VEDANTAbhinavnagar No 2 Kudal Dist Sindhudurg29-CompletedApr 2017Apr 2017
NIRMITEE ESHANNear Kudal Railway Station Kudal Dist Sindhudurg62-CompletedApr 2017Apr 2017
NIRMITEE SHUBHAMNear Kudal Railway Station Kudal Dist Sindhudurg79-CompletedAug 2015Aug 2015
NIRMITEE OMKARNear Pinguli Titha Taluka Kudal Dist Sindhudurg47-CompletedJun 2015Jun 2015

How this compares with Sindhudurg

21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is completed

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep NIRMITEE SIDDHI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR KUDAL RAILWAY STATION530+ in Sindhudurg

Builder: NIRMITEE BUILDERS & DEVELOPERS

NIRMITEE BUILDERS & DEVELOPERS has 5 registrations on MahaRERA, including NIRMITEE LAXMINARAYAN and NIRMITEE NANDAN. Its filings disclose 5 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if NIRMITEE SIDDHI is delayed beyond 22 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NIRMITEE SIDDHI?

The registered promoter entity is NIRMITEE BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NIRMITEE SIDDHI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NIRMITEE SIDDHI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NIRMITEE SIDDHI?

The professionals named in the filing: Architect: SAMEER BHALCHANDRA JOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NIRMITEE SIDDHI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NIRMITEE SIDDHI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NIRMITEE SIDDHI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.