Home / Browse projects / Sindhudurg, Maharashtra / NIRMITEE SIDDHI
NIRMITEE SIDDHI
By NIRMITEE BUILDERS & DEVELOPERS
RG-MH-79188 · RERA P52900017028 · Last updated on MahaRERA portal: 12 Oct 2023
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 4 completed earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.
See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NIRMITEE SIDDHI is a Residential / Group Housing project by NIRMITEE BUILDERS & DEVELOPERS in Sindhudurg, Maharashtra, registered with MahaRERA as P52900017028 on 4 Jul 2018. The registration is recorded completed; possession was promised by 22 Dec 2024.
At a glance
Project
- NameNIRMITEE SIDDHI
- TypeResidential / Group Housing
- Location
- KUDAL RAILWAY STATION
- NEAR KUDAL RAILWAY STATION
- Kavilkate
- Kudal
- Sindhudurg
- 416520
- Pincode416520
- RERA no.P52900017028
- ReraGenie IDRG-MH-79188
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on4 Jul 2018
- Promised completion22 Dec 2024
- Revised completionNone
- Buildings2 building records
- Documents filed55 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 4 | 0 | 0 | 0 | 0 |
| B WING | NA | 0 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 12 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.
A WING55%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B WING55%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 12 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed162
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| A WING | 97 | 97 |
| B WING | 65 | 65 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SAMEER BHALCHANDRA JOSHI |
| Partner | Role in project |
|---|---|
| NIRMITEE BUILDERS & DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Jun 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Aug 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jul 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 17 Sep 2022
Documents filed55
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 12 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: NBD SIDDHI-FORM 5-22-23.pdf | 5 Oct 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 23 Jan 2023 |
| Declaration about Commencement CertificateFile: Declaration about commencement certificate 18.pdf | 21 Jan 2023 |
| Declaration about Commencement CertificateFile: Declaration about commencement certificate 20.pdf | 21 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 9.pdf | 21 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 10.pdf | 21 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 11.pdf | 21 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - 12.pdf | 21 Jan 2023 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf | 19 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate (Form 1).pdf | 19 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate.pdf | 19 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf | 19 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: NBD-21-22-SIDDHI-FORM 5.pdf | 19 Jan 2023 |
| Proforma of Agreement for saleFile: Proforma of Agreement for sale.pdf | 19 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3.pdf | 18 Jan 2023 |
| Details of encumbrances concerned to LegalFile: Details of encumbrances.pdf | 17 Oct 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account Details.pdf | 17 Oct 2022 |
| Deviation Report with respect to Allotment letterFile: Allotment Letter.pdf | 14 Oct 2022 |
| Deviation Report with respect to model copy of AgreementFile: Agreement.pdf | 14 Oct 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf | 17 Sep 2022 |
| CERSAI detailsFile: CERSAI Details.pdf | 10 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate FORM 2A.pdf | 31 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate FORM 2A.pdf | 31 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate FORM 2A.pdf | 31 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate FORM 2A.pdf | 31 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate FORM 2A.pdf | 31 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate FORM 2A.pdf | 31 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate FORM 2A.pdf | 31 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate FORM 2A.pdf | 30 Dec 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: NBD SIDDHI RERA 20-21.pdf | 17 Nov 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: NBD SIDDHI RERA 19-20.pdf | 16 Nov 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: 1291-2021.pdf | 28 Jul 2021 |
| Building plan approvalFile: Plan.pdf | 24 Jul 2021 |
| Building Plan Approval (IOD)File: Plan.pdf | 24 Jul 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 24 Jul 2021 |
| Declaration about Commencement CertificateFile: Commencement Certificate.pdf | 24 Jul 2021 |
| PAN CardFile: PAN Card.pdf | 19 Oct 2020 |
| Layout approvalFile: Approved Plan.pdf | 6 Aug 2020 |
| Copy of Layout Approval (in case of layout)File: Approved Plan.pdf | 6 Aug 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 6 Aug 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf | 19 May 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf | 15 May 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Siddhi.pdf | 14 Jan 2020 |
| OtherFile: Permission.pdf | 30 Aug 2019 |
| Layout approvalFile: Approval Plan.pdf | 23 Jun 2018 |
| Copy of the legal title reportFile: Search Report.pdf | 23 Jun 2018 |
| Copy of Layout Approval (in case of layout)File: Approval Plan.pdf | 23 Jun 2018 |
| Declaration in FORM BFile: FORM B.pdf | 23 Jun 2018 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 23 Jun 2018 |
| Certificates of CA (Form 3)File: Certificate of CA.pdf | 22 Jun 2018 |
| Building plan approvalFile: Approval Plan.pdf | 13 Jun 2018 |
| Details of encumbrancesFile: Encumbrances.pdf | 13 Jun 2018 |
| Building Plan Approval (IOD)File: Approval Plan.pdf | 13 Jun 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates.pdf | 13 Jun 2018 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Nirmitee AvighnaP52900049381 | Near Topiwala Vachanalay, Sindhudurg | 153 | Feb 2023 | Ongoing | Dec 2028 | Not due yet |
| NIRMITEE VEDANT | Abhinavnagar No 2 Kudal Dist Sindhudurg | 29 | - | Completed | Apr 2017 | Apr 2017 |
| NIRMITEE ESHAN | Near Kudal Railway Station Kudal Dist Sindhudurg | 62 | - | Completed | Apr 2017 | Apr 2017 |
| NIRMITEE SHUBHAM | Near Kudal Railway Station Kudal Dist Sindhudurg | 79 | - | Completed | Aug 2015 | Aug 2015 |
| NIRMITEE OMKAR | Near Pinguli Titha Taluka Kudal Dist Sindhudurg | 47 | - | Completed | Jun 2015 | Jun 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sindhudurg
Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 4 other registrations, which the RERA portal never shows together
- All 55 filed documents as one ZIP, foldered, with a manifest
Keep NIRMITEE SIDDHI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR KUDAL RAILWAY STATION530+ in Sindhudurg
ORIGIN KUDAL
AXON ORIGIN KUDAL LLP
Nirmitee Avighna
NIRMITEE BUILDERS & DEVELOPERS
Crestview Court
STALLUM BUILDCON PRIVATE LIMITED
Nirmitee S S Royal Plaza
NIRMITEE BUILDERS & DEVELOPERS
Kshitij Market City Phase II
Kshitij Developers
AARADHANA
BALAJI BUILDERS AND DEVELOPERS
See every Sindhudurg project, with the district possession charts
Builder: NIRMITEE BUILDERS & DEVELOPERS
NIRMITEE BUILDERS & DEVELOPERS has 5 registrations on MahaRERA, including NIRMITEE LAXMINARAYAN and NIRMITEE NANDAN. Its filings disclose 5 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Sindhudurg district page.
Frequently asked questions
What are my rights if NIRMITEE SIDDHI is delayed beyond 22 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NIRMITEE SIDDHI?
The registered promoter entity is NIRMITEE BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NIRMITEE SIDDHI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NIRMITEE SIDDHI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NIRMITEE SIDDHI?
The professionals named in the filing: Architect: SAMEER BHALCHANDRA JOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NIRMITEE SIDDHI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback