Home / Browse projects / Pune, Maharashtra / NIRMAN HILLSIDE

Registered No litigation declared Residential / Group Housing project

NIRMAN HILLSIDE

By MR GURURAJ NARSINHA JOSHI

RG-MH-69667 · RERA P52100051666 · Last updated on MahaRERA portal: 13 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 17 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 17 months from the original
6 of 11Construction stages donefurthest along: Internal walls, 90%
12 of 22Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

NIRMAN HILLSIDE is a Residential / Group Housing project by MR GURURAJ NARSINHA JOSHI in Pune, Maharashtra, registered with MahaRERA as P52100051666 on 27 Jun 2023. Possession is promised by 30 Jun 2027. The completion date has moved by 17 months from the original filing. 10 of the 22 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameNIRMAN HILLSIDE
  • TypeResidential / Group Housing
  • Location
    • DHANKAWADI-EXT
    • Dhankawadi
    • Haveli
    • Pune
    • 411043
  • Pincode411043
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100051666
  • ReraGenie IDRG-MH-69667

Builder

  • NameMR GURURAJ NARSINHA JOSHI
  • Entity typeOthers
  • GSTIN27ABDPJ4357M1ZC
  • Named personGURURAJ NARSINHA JOSHI
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2023First promiseJan 2026Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jun 2023
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 1 Jan 2026)
  • Buildings1 building record
  • Documents filed82 files

Current status

45%10 of 22 units booked

Figures as on 13 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NIRMAN HILLSIDENA6622022

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

NIRMAN HILLSIDE: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed75

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots75
Closed/Covered19
Open Space56

Land and ownership6

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area835 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Jan 2026
LandownerVillageDistrict
SANJAY NARAYAN PATOLEPune (M Corp.)Pune
SNEHA SANJAY PATOLEPune (M Corp.)Pune
MANINI YOGESH GURJARPune (M Corp.)Pune
MRUGAJA YOGESH GURJARPune (M Corp.)Pune
RENU ABHAYKUMANR MULAYKothrudPune
ABHAYKUMAR MULAY HUFKothrudPune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI3302.0
Proposed, not sanctioned2,302 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDAHANUKAR REGENCY GROUND FLOOR DAHANUKAR CIRCLE NEAR CUMMINS LTD DAHANUKAR COLONY PUNE MAHARASHTRA

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANIRUDDHA SHINDE
ArchitectShinde Joshi & Associates
EngineerARUN FOKHALE
EngineerDesiNova Engineers & RCC Consultant
EngineerMakrand M Kulkarni
EngineerChandrashekhar Angadi
Chartered AccountantPRAKASH S WALGUDE
Chartered AccountantPrakash Walgude & Associates
Chartered AccountantKumar Mulay & Associates
PartnerRole in project
MR GURURAJ NARSINHA JOSHI-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA20032620309Jan 2026 → Jun 2027

Reason as filed by the promoterThe request for a RERA extension for the "NIRMAN HILLSIDE" project is primarily driven by ongoing procedural and regulatory delays concerning the widening of its access road. While the initial building plan sanctioned in 2022 reflected a 9.0-meter wide road, approximately 10-20% of the stretch from Motewar Ganpati Chowk currently measures only 6.5 to 7.5 meters. This road is a vital local artery serving residential areas, schools, and the Taljai Mata Mandir. Under Clause 210(1)(b) of the Development Control and Promotion Regulations, a uniform width of 9.0 meters at the PMC record drawing is m

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Mar 2025

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form 5 (Aug 2026).pdf13 Aug 2026
Form 5 (FY 2024-2025)File: Form 5 signed and accepted.pdf17 Jul 2026
Form 2A (FY 2025-2026)File: Form-2A MMK 22 May.pdf11 Jul 2026
Form 2A (FY 2024-2025)File: Form-2A.pdf17 Mar 2026
Form 1File: Form-1 (1 July 2024).pdf24 Feb 2026
Form 2File: Form-2 30 June 2024.pdf24 Feb 2026
Form 3File: Form-3 (30 06 2024).pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 30 06 2024.pdf24 Feb 2026
Form 1File: Form-1 (1 Oct 2024).pdf24 Feb 2026
Form 2File: Form-2 30 Sep 2024.pdf24 Feb 2026
Form 3File: Form 3 (30 09 2024).pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 30 09 2024.pdf24 Feb 2026
Form 1File: Form-1 (1 Jan 2025).pdf24 Feb 2026
Form 2File: Form-2 31 Dec 2024.pdf24 Feb 2026
Form 3File: Form 3 (31 12 2024).pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 31 12 2024.pdf24 Feb 2026
Form 1File: Form-1 (1 Apr 2025).pdf24 Feb 2026
Form 2File: Form-2 31 Mar 2025.pdf24 Feb 2026
Form 3File: Form 3 (31 03 2025).pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 31 03 2025.pdf24 Feb 2026
Form 1File: Form-1 (1 July 2025).pdf24 Feb 2026
Form 2File: Form-2 30 June 2025.pdf24 Feb 2026
Form 3File: Form 3 (30 06 2025).pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 30 06 2025.pdf24 Feb 2026
Form 1File: Form-1 (1 Oct 2025).pdf24 Feb 2026
Form 2File: Form-2 30 Sep 2025.pdf24 Feb 2026
Form 3File: Form 3 (30 09 2025).pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 30 09 2025.pdf24 Feb 2026
Form 1File: Form-1 (1 Jan 2026).pdf24 Feb 2026
Form 2File: Form-2 31 Dec 2025.pdf24 Feb 2026
Form 3File: Form 3 Q3 2025-26.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 31 12 2025.pdf24 Feb 2026
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Form 4 hillside.pdf5 Mar 2025
Other - TechnicalFile: Undertaking 31 Jan 2025.pdf5 Mar 2025
Building plan approvalFile: Revision Sanction Sheet 1.pdf24 Jan 2025
Building plan approvalFile: Revision Sanction Sheet 2.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf24 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Hillside.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 p1.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 p2.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf24 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Revision Sanction Sheet 1.pdf24 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Revision Sanction Sheet 2.pdf24 Jan 2025
Other - LegalFile: SuppDev AGREE 1.pdf24 Jan 2025
Other - LegalFile: SuppDev AGREE 2.pdf24 Jan 2025
Other - LegalFile: SuppDev AGREE 3.pdf24 Jan 2025
Other - LegalFile: SuppDev AGREE 4.pdf24 Jan 2025
Other - LegalFile: SuppDev AGREE 5.pdf24 Jan 2025
Other - LegalFile: SuppDev AGREE 6.pdf24 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART OC.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sept2023 2.pdf2 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 sept 2023 2.pdf2 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf2 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf2 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 .pdf2 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 .pdf2 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 5 hillside.pdf14 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 hillside.pdf14 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A 13 October 23.pdf14 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Undertaking.pdf14 Oct 2023
Layout approvalFile: 1 Copy of Layout Approval (in case of layout) (6).pdf7 Jun 2023
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development (1).pdf7 Jun 2023
PAN CardFile: 1 PAN Card (2).pdf7 Jun 2023
Copy of the legal title reportFile: 1 Copy of the legal title report (2).pdf7 Jun 2023
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf7 Jun 2023
Details of encumbrances concerned to FinanceFile: 2 a Details of encumbrances concerned to Finance.pdf7 Jun 2023
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance.pdf7 Jun 2023
Details of encumbrances concerned to LegalFile: 2 a Details of encumbrances concerned to Finance.pdf7 Jun 2023
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout) (6).pdf7 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development (1).pdf7 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development (3).pdf7 Jun 2023
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate (1).pdf7 Jun 2023
Declaration in FORM BFile: 1 Declaration in FORM B (1).pdf7 Jun 2023
CERSAI detailsFile: 1 CERSAI details.pdf7 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate on Project Cost.pdf7 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations.pdf7 Jun 2023
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf7 Jun 2023
Proforma of Allotment letterFile: 1 Proforma of Allotment letter.pdf7 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow7 Jun 2023
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter.pdf7 Jun 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
NIRMAN RIVERSIDESURVEY NO. 11-3 CTS NO. 548 AND 549 MAHARSHI KARVENAGAR PUNE25CompletedDec 2020Late, Mar 2021

How this compares with Pune

45%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 17 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NIRMAN HILLSIDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHANKAWADI-EXT13,700+ in Pune

2 kmNIRMAN HILLSIDECompleted 53Lapsed / revoked 19Other 54Dot size: filed unitsN

Filed coordinates, straight-line distance. 126 registered projects within 2 km.

Builder: MR GURURAJ NARSINHA JOSHI

MR GURURAJ NARSINHA JOSHI has 1 registration on MahaRERA, including NIRMAN HILLSIDE. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NIRMAN HILLSIDE is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NIRMAN HILLSIDE?

The registered promoter entity is MR GURURAJ NARSINHA JOSHI, an others as per the filing. Its GSTIN 27ABDPJ4357M1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NIRMAN HILLSIDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NIRMAN HILLSIDE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NIRMAN HILLSIDE?

The professionals named in the filing: Architect: ANIRUDDHA SHINDE; Architect: Shinde Joshi & Associates; Engineer: ARUN FOKHALE; Engineer: DesiNova Engineers & RCC Consultant; Engineer: Makrand M Kulkarni; Engineer: Chandrashekhar Angadi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NIRMAN HILLSIDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NIRMAN HILLSIDE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NIRMAN HILLSIDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.