Home / Browse projects / Palghar, Maharashtra / NINESTAR CROWN BLDG NO 5 EMERALD

Registered No litigation declared Residential / Group Housing project

NINESTAR CROWN BLDG NO 5 EMERALD

By NINE HOMEMAKERS

RG-MH-87278 · RERA P99000049308 · Last updated on MahaRERA portal: 30 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 11 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 80%
31 of 90Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

NINESTAR CROWN BLDG NO 5 EMERALD is a Residential / Group Housing project by NINE HOMEMAKERS in Palghar, Maharashtra, registered with MahaRERA as P99000049308 on 7 Feb 2023. Possession is promised by 31 Dec 2026. 59 of the 90 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameNINESTAR CROWN BLDG NO 5 EMERALD
  • TypeResidential / Group Housing
  • Location
    • MANDE MAKANE ROAD
    • Makane
    • Palghar
    • 401102
  • Pincode401102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000049308
  • ReraGenie IDRG-MH-87278

Builder

  • NameNINE HOMEMAKERS
  • Entity typePartnership
  • GSTIN27AAOFN0314J1Z9
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersHatim Kesuri, Amit Solanki, Murtaza Neemuchwala, Pramod Paurana, Rakesh Jain, Vinit Chorghe, Sanjay Rathod
  • Other registrations11 more →
  • Completed7 of 12
  • Declared earlier projects3 →

Key dates

this monthRegisteredFeb 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Feb 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed63 files

Current status

66%59 of 90 units booked
55.6%Work done, per cost certificate

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLDG NO 5 EMERALD WING ANA8845045
BLDG NO 5 EMERALD WING BNA8845045

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 80%.

BLDG NO 5 EMERALD WING A37%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLDG NO 5 EMERALD WING B37%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,913 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
MR KETAN KANTILAL SHAHSaphalePalghar
MR BHARAT MANILAL SHAHSaphalePalghar

Approvals and building plan

Sanctioning authorityThane Muncipal Corporation
Permissible FSI3913.46
Proposed, not sanctioned3,913 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO.1,2,3,4 AND 5SHREE RAM SANKUL, ACHOLE ROADNALASOPARA EAST
Estimated costRs 14.01 cr
Cost incurredRs 7.78 cr
Work done55.56%
BuildingWingEstimatedIncurred
BLDG NO 5 EMERALD WING ANARs 8.95 crRs 6.27 cr
BLDG NO 5 EMERALD WING BNARs 2.53 crRs 75.83 lakh
-NARs 2.53 crRs 75.83 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRoshan Patil
EngineerAsrar Ahmed Jatoo
Chartered AccountantRD Lukad
PartnerRole in project
NINE HOMEMAKERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5 BLDG 5 2024-25.pdf30 Jun 2026
Withdrawal Update Form 1File: FORM 1.pdf29 Jun 2026
Withdrawal Update Form 2File: FORM 2.pdf29 Jun 2026
Withdrawal Update Form 3File: FORM-03-EMERALD-BLDG NO 5.pdf29 Jun 2026
Form 2A (FY 2025-2026)File: FORM 2A 02 NHM EMERALD BDG 5 (1).pdf29 Jun 2026
Withdrawal Update Form 1File: FORM 1.pdf30 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf30 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf30 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf30 Apr 2026
Withdrawal Update Form 3File: FORM-03-EMERALD-BLDG NO 5.pdf30 Apr 2026
Withdrawal Update Form 3File: FORM-03-EMERALD-BLDG NO 5.pdf30 Apr 2026
Form 5 (FY 2022-2023)File: CA (Form 5) (FY 2022-23).pdf14 Mar 2026
Form 5 (FY 2023-2024)File: CA (Form 5) (FY 2023-24).pdf14 Mar 2026
Withdrawal Update Form 1File: FORM -01-EMERALD-BLDG NO 5.pdf9 Feb 2026
Withdrawal Update Form 2File: FORM -02-EMERALD-BLDG NO 5.pdf9 Feb 2026
Withdrawal Update Form 3File: FORM-03-EMERALD-BLDG NO 5.pdf9 Feb 2026
Withdrawal Update Form 1File: 3 FORM 1 EMERALD.pdf30 Dec 2025
Withdrawal Update Form 2File: EMERALD FORM 2.pdf30 Dec 2025
Withdrawal Update Form 3File: fce05877-eb6d-4632-8cd9-18145b8acf2f_page-0001.pdf30 Dec 2025
Withdrawal Update Form 1File: 3 FORM 1 EMERALD.pdf8 Sep 2025
Withdrawal Update Form 2File: EMERALD FORM 2.pdf8 Sep 2025
Withdrawal Update Form 3File: fce05877-eb6d-4632-8cd9-18145b8acf2f_page-0001.pdf8 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NH-FORM-3-JAN-25 TO MAR-25-NINE STAR CROWN-EMERALD BLDG NO 05_compressed.pdf10 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NH FORM 3 APR 24 TO JUN 24 NINE STAR CROWN EMERALD BLDG NO 5.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NH FORM 3 JUL 24 TO SEPT 24 NINE STAR CROWN EMERALD BLDG NO 5.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NH FORM 3 OCT 24 TO DEC 24 NINE STAR CROWN EMERALD BLDG NO 5.pdf6 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: NH FORM 5 FY 23 24 NINE STAR CROWN-EMERALD BLDG NO 5.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NH-FORM-3-JUL-23 TO SEPT-23-NINE STAR CROWN-EMERALD BLDG NO-05.pdf6 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NH-FORM-3-OCT-23 TO DEC-23-NINE STAR CROWN -EMERALD BLDG NO-05.pdf6 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NH-FORM-3-JAN-24 TO MAR-24-NINE STAR CROWN-EMERALD BLDG NO-5_compressed.pdf6 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: NH-FORM-5-FY-22-23-NINE STAR CROWN -EMERALD BLDG NO 05.pdf6 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EMERALD FORM 2.pdf25 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 FORM 1 EMERALD.pdf21 Oct 2023
Disclosure of sold/ booked inventoryFile: SOLD CROWN EMERALD.pdf21 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Crown Bdg 501.pdf18 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 RUBY.pdf26 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 EMERALD.pdf26 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NH-FORM-1-APR-23 TO JUN-23-NINE STAR CROWN-EMERALD BLDG NO-05.pdf23 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NH-FORM-3-APR-23 TO JUN-23-NINE STAR CROWN-EMERALD BLDG NO-05_compressed.pdf23 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 with UDIN.pdf2 Feb 2023
Proforma of Agreement for saleFile: AFS 1.pdf2 Feb 2023
Details of encumbrancesFile: Legal Litigation Encumbrance.pdf30 Jan 2023
Details of encumbrancesFile: Financial Non-Encumbrances.pdf30 Jan 2023
CERSAI detailsFile: cersai.pdf30 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest declaration_compressed (1).pdf30 Jan 2023
Proforma of Allotment letterFile: alloment letter.pdf30 Jan 2023
Other - FinanceFile: Bank declaration.pdf30 Jan 2023
Details of encumbrances concerned to LegalFile: Legal Litigation Encumbrance.pdf10 Oct 2022
Declaration in FORM BFile: PROMOTER Form B.pdf10 Oct 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Account.pdf10 Oct 2022
Deviation Report with respect to Allotment letterFile: No Deviation to Allotment Letter.pdf10 Oct 2022
Deviation Report with respect to model copy of AgreementFile: No Deviation to Agreement for Sale.pdf10 Oct 2022
Layout approvalFile: CROWN LAYOUT PLAN.pdf10 Jun 2022
Building plan approvalFile: BLDG NO 5.pdf10 Jun 2022
Copy of the legal title reportFile: TITLE REPORT CROWN.pdf10 Jun 2022
Copy of Layout Approval (in case of layout)File: CROWN LAYOUT PLAN.pdf10 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: BLDG NO 5.pdf10 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: CROWN NA ORDER.pdf10 Jun 2022
PAN CardFile: PAN CARD NHM.pdf9 Apr 2022
Details of encumbrancesFile: Encumbrances.pdf9 Apr 2022
Declaration about Commencement CertificateFile: declaration of cc RUBY.pdf9 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Emerald Form 1_compressed.pdf9 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Ninestar Crown Emerald.pdf9 Apr 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
NINESTAR HEAVEN BLDG NO 3P99000045841MAKANE, Palghar100Jun 2022OngoingDec 2026Not due yet
NINESTAR CROWN BLDG NO2 RUBYP99000046388Mande-Makane Road, Palghar62Jun 2022OngoingDec 2026Not due yet

How this compares with Palghar

66%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NINESTAR CROWN BLDG NO 5 EMERALD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MANDE MAKANE ROAD3,200+ in Palghar

2 kmNINESTAR CROWN BLDG NO 5Completed 5Lapsed / revoked 3Other 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 29 registered projects within 2 km.

Builder: NINE HOMEMAKERS

NINE HOMEMAKERS has 12 registrations on MahaRERA, including Nine Star Landmark Phase III Bldg-5 TULIP and Nine Star Landmark Ph III Bldg 6 LOTUS. Its filings disclose 3 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if NINESTAR CROWN BLDG NO 5 EMERALD is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NINESTAR CROWN BLDG NO 5 EMERALD?

The registered promoter entity is NINE HOMEMAKERS, a partnership as per the filing. Its GSTIN 27AAOFN0314J1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NINESTAR CROWN BLDG NO 5 EMERALD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NINESTAR CROWN BLDG NO 5 EMERALD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NINESTAR CROWN BLDG NO 5 EMERALD?

The professionals named in the filing: Architect: Roshan Patil; Engineer: Asrar Ahmed Jatoo; Chartered Accountant: RD Lukad. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NINESTAR CROWN BLDG NO 5 EMERALD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NINESTAR CROWN BLDG NO 5 EMERALD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NINESTAR CROWN BLDG NO 5 EMERALD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.