Home / Browse projects / Palghar, Maharashtra / NINE STAR RESIDENCY ROHINI BUILDING
NINE STAR RESIDENCY ROHINI BUILDING
By TRINITY CONCRETE STRUCTURES PRIVATE LIMITED
RG-MH-43827 · RERA P99000005167 · Last updated on MahaRERA portal: 15 Feb 2021
Source: official MahaRERA filing
Red flags
- Completion date moved by 48 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NINE STAR RESIDENCY ROHINI BUILDING is a Residential / Group Housing project by TRINITY CONCRETE STRUCTURES PRIVATE LIMITED in Palghar, Maharashtra, registered with MahaRERA as P99000005167 on 10 Aug 2017. The registration is recorded completed; possession was promised by 31 Jul 2022. The completion date has moved by 48 months from the original filing.
At a glance
Project
- NameNINE STAR RESIDENCY ROHINI BUILDING
- TypeResidential / Group Housing
- Location
- Makane
- Palghar
- 401102
- Pincode401102
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000005167
- ReraGenie IDRG-MH-43827
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on10 Aug 2017
- Promised completion31 Jul 2022
- Revised completionRevised to 31 Jul 2022 (originally 31 Jul 2018)
- Buildings1 building record
- Documents filed23 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ROHINI BUILDING | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 Feb 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
ROHINI BUILDING: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 15 Feb 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 40% |
| Water Supply | Yes | 70% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 20% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ATULKUMAR PRAJAPATI |
| Partner | Role in project |
|---|---|
| TRINITY CONCRETE STRUCTURES PRIVATE LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterOccupation Certificate Not Received
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jul 2017 - Commencement CertificateNot on the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
- Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 15 Feb 2021
Documents filed23
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Copy.pdf | 15 Feb 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 001.pdf | 2 Mar 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 (2017-18).pdf | 28 Feb 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 (2018-19).pdf | 28 Feb 2020 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4_reduce_compressed.pdf | 19 Feb 2020 |
| Architect’s Certificate on Completion of Project (Form 4)File: Maha rera.pdf | 19 Feb 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Page 1 (1)_compressed.pdf | 12 Feb 2020 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4_reduce_compressed (1).pdf | 12 Feb 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 2 Feb 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf | 2 Feb 2018 |
| Certificates of CA (Form 3)File: RERA CA Certificate.pdf | 2 Feb 2018 |
| Proforma of Allotment letterFile: Trinity Agreement Rera.pdf | 2 Feb 2018 |
| Layout approvalFile: LAYOUT PLAN-ilovepdf-compressed.pdf | 31 Jul 2017 |
| Building plan approvalFile: Building Plan-IOD.pdf | 31 Jul 2017 |
| Details of encumbrancesFile: declaration of encumbrances.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN-ilovepdf-compressed.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: Building Plan-IOD.pdf | 31 Jul 2017 |
| Declaration in FORM BFile: FORM B.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Architect certificate-ilovepdf-compressed.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: Declaration.pdf | 31 Jul 2017 |
| Copy of the legal title reportFile: Title Search report.pdf | 30 Jul 2017 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| TRINITY PRIDE | EVERSHINE CITY VASAI EAST DISTRICT PALGHAR | 34 | Completed | Dec 2014 | Late, Apr 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 23 filed documents as one ZIP, foldered, with a manifest
Keep NINE STAR RESIDENCY ROHINI BUILDING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Makane3,200+ in Palghar
Filed coordinates, straight-line distance. 55 registered projects within 2 km.
BLOSSOM AVENUE
DILIPKUMAR AMBALAL JAIN
RAJLAXXMI PARK
SAPHALE LAND DEVELOPERS LLP
STAR VIRATHAN CITY
STAR BUILDERS & DEVELOPERS
VIDHATA EMPIRE
K.M.WORLD
MITHILA COMPLEX
NAVAL RAMBAHADUR SINGH
PARIVAR COMPLEX BUILDING NO 1 AND 3
PARIVAR HOMES
See every Palghar project, with the district possession charts
Builder: TRINITY CONCRETE STRUCTURES PRIVATE LIMITED
TRINITY CONCRETE STRUCTURES PRIVATE LIMITED has 2 registrations on MahaRERA, including NINE STAR RESIDENCY ROHINI BUILDING and TRINITY VISTA BUILDING NO 3. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if NINE STAR RESIDENCY ROHINI BUILDING is delayed beyond 31 Jul 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NINE STAR RESIDENCY ROHINI BUILDING?
The registered promoter entity is TRINITY CONCRETE STRUCTURES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NINE STAR RESIDENCY ROHINI BUILDING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NINE STAR RESIDENCY ROHINI BUILDING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NINE STAR RESIDENCY ROHINI BUILDING?
The professionals named in the filing: Architect: ATULKUMAR PRAJAPATI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NINE STAR RESIDENCY ROHINI BUILDING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback