Nidhivan

By Renaissance Enterprises Pvt Ltd

RG-MH-03719 · RERA P50500047326 · Last updated on MahaRERA portal: 7 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
250 of 351Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 122 documents Report an error

Nidhivan is a Plotted project by Renaissance Enterprises Pvt Ltd in Nagpur, Maharashtra, registered with MahaRERA as P50500047326 on 19 Oct 2022. Possession is promised by 31 Dec 2030. 101 of the 351 units on this registration are recorded sold or booked.

At a glance

Project

  • NameNidhivan
  • TypePlotted
  • Location
    • Main Road
    • Near Panjiri Lodhi Village
    • Panjri Lodhi
    • Nagpur (Rural)
    • Nagpur
    • 441122
  • Pincode441122
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500047326
  • ReraGenie IDRG-MH-03719

Builder

  • NameRenaissance Enterprises Pvt Ltd
  • Entity typeOthers
  • Managing DirectorKrishnakumar Gupta
  • Named personKrishnakumar Mannilal Gupta

Key dates

this monthRegisteredOct 2022PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Oct 2022
  • Promised completion31 Dec 2030
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed122 files

Current status

29%101 of 351 units booked

Figures as on 7 May 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes94%
Water SupplyYes79%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes96%
Storm Water DrainsYes89%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes59%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes69%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes85%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area82,692 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Oct 2025
LandownerVillageDistrict
Krishnakumar GuptaNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNAGPUR METROPOLITAN REGION DEVELOPMENT AUTHORITY (NMRDA)
Permissible FSI82692.0
Proposed, not sanctioned82,692 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSME BRANCH, RAVI NAGAR SQUARE, AMRAVATI ROAD, NAGPUR-440033

Certifying professionals and partners12

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUmesh Lamge
ArchitectAtharva Gupta
ArchitectAR ATHARVA GUPTA
EngineerRamdas Wagh
EngineerSACHIN MANOJ JAISWAL
Chartered AccountantRachana Agrawal
Chartered AccountantAdhish Agarwal & Co
Chartered AccountantVijay Agrawal & company
Chartered AccountantG A D & ASSOCIATES
Chartered AccountantUTSAV SUMIT & ASSOCIATES
Chartered AccountantA S MUNDADA & CO.
Chartered AccountantSUMIT SANTOSH AGRAWAL & ASSOCIATES
PartnerRole in project
Renaissance Enterprises Pvt Ltd-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed122

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM 2A NIDHIVAN MARCH 2026.pdf7 May 2026
Withdrawal Update Form 1File: NIDHIVAN_FORM-1_MAR-26.pdf19 Apr 2026
Withdrawal Update Form 2File: NIDHIVAN_FORM-2_MAR-26_COMM.pdf19 Apr 2026
Withdrawal Update Form 3File: NIDHIVAN_FORM-3_MAR-26_COMM.pdf19 Apr 2026
Withdrawal Update Form 1File: FORM 1_NIDHIVAN_DEC 2025.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM 2_NIDHIVAN_DEC 2025.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3_NIDHIVAN_DEC 2025_.pdf20 Jan 2026
Withdrawal Update Form 1File: FORM-1 SEPT-25 NIDHIVAN.pdf18 Oct 2025
Withdrawal Update Form 2File: FORM 2 SEPT-25 NIDHIVAN.pdf18 Oct 2025
Withdrawal Update Form 3File: FORM-3 SEPT-25 _compressed.pdf18 Oct 2025
Withdrawal Update Form 1File: FORM-1 JUN-25.pdf17 Oct 2025
Withdrawal Update Form 2File: FORM-2 JUN-25.pdf17 Oct 2025
Withdrawal Update Form 3File: FORM 3 NIDHIVAN JUNE 25_page-0001.pdf17 Oct 2025
Form 2A (FY 2024-2025)File: FORM-2A MAR-25 SCANNED.pdf16 Oct 2025
Form 1File: form 1 dec 2022.pdf13 Oct 2025
Form 2File: form 2 dec 2022.pdf13 Oct 2025
Form 3File: form 3 dec 2022.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: sold unsold dec 2022.pdf13 Oct 2025
Form 1File: form 1 march 2023.pdf13 Oct 2025
Form 2File: form 2 march 2023.pdf13 Oct 2025
Form 3File: form 3 march 2023.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: sold unsold march 2023.pdf13 Oct 2025
Form 1File: form 1 june 2023.pdf13 Oct 2025
Form 2File: form 2 june 2023.pdf13 Oct 2025
Form 3File: form 3 june 2023.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: sold unsold june 2023.pdf13 Oct 2025
Form 1File: form 1 sep 2023.pdf13 Oct 2025
Form 2File: form 2 sep 2023.pdf13 Oct 2025
Form 3File: form 3 sep 2023.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: sold unsold sep 2023.pdf13 Oct 2025
Form 1File: form 1 dec 2023.pdf13 Oct 2025
Form 2File: form 2 dec 2023.pdf13 Oct 2025
Form 3File: form 3 dec 2023.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: sold unsold dec 23.pdf13 Oct 2025
Form 1File: form 1 march 2024.pdf13 Oct 2025
Form 2File: form 2 march 2024.pdf13 Oct 2025
Form 3File: form 3 march 2024.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: sold unsold march 2024.pdf13 Oct 2025
Form 1File: form 1 sep 2024.pdf13 Oct 2025
Form 2File: form 2 sep 2024.pdf13 Oct 2025
Form 3File: form 3 sep 2024.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: sold unsold swewp 2024.pdf13 Oct 2025
Form 1File: form 1 dec 2024.pdf13 Oct 2025
Form 2File: form 2 dec 2024.pdf13 Oct 2025
Form 3File: form 3 dec 2024.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: sold unsold dec 2024.pdf13 Oct 2025
Form 1File: form 1 march 2025.pdf13 Oct 2025
Form 2File: form 2 march 2025.pdf13 Oct 2025
Form 3File: form 3 march 2025.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: sold unsold march 2025.pdf13 Oct 2025
Form 5 (FY 2023-2024)File: FORM 5 Nidhivan_2023-24.pdf13 Oct 2025
Form 5 (FY 2022-2023)File: FORM 5 Nidhivan_2022-23.pdf13 Oct 2025
Form 5 (FY 2024-2025)File: FORM-5_2024-2025 MARCH-2025 FINAL.pdf13 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: nidhivan form -1-2025.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: nidhivan form -3-2025_compressed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: nishivan form -2-2025 Sachin Jaiswal Engineer certificate.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: sold unsold inventory_compressed (1).pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf8 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf8 Jan 2025
Disclosure of sold/ booked inventoryFile: sold unsold.pdf8 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 Nidhivan_2023-24.pdf20 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (2).pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (1).pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A (1).pdf17 Jul 2024
Disclosure of sold/ booked inventoryFile: unsold Inventory (1)_compressed.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form-3 (3).pdf17 Jul 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT-A.pdf15 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Disclosure.pdf15 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect .pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer .pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: sold unsold_compressed.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate _compressed.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: sold unsold_compressed.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG NEW.pdf19 Jan 2024

How this compares with Nagpur

29%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Nidhivan on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Panjiri Lodhi Village2,800+ in Nagpur

Builder: Renaissance Enterprises Pvt Ltd

Renaissance Enterprises Pvt Ltd has 1 registration on MahaRERA, including Nidhivan. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Nidhivan is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Nidhivan?

The registered promoter entity is Renaissance Enterprises Pvt Ltd, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Nidhivan?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Nidhivan?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Nidhivan?

The professionals named in the filing: Architect: Umesh Lamge; Architect: Atharva Gupta; Architect: AR ATHARVA GUPTA; Engineer: Ramdas Wagh; Engineer: SACHIN MANOJ JAISWAL; Chartered Accountant: Rachana Agrawal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nidhivan?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nidhivan. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nidhivan to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.