Completed No litigation declared Residential / Group Housing project

NIDHI TOWERS

By RAJAN KUMAR MANCHANDA

RG-MH-26307 · RERA P51800008893 · Last updated on MahaRERA portal: 9 Aug 2024

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA
  • Completion date moved by 24 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jul 2024Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
3Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

NIDHI TOWERS is a Residential / Group Housing project by RAJAN KUMAR MANCHANDA in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008893 on 19 Aug 2017. The registration is recorded completed; possession was promised by 31 Jul 2024. The completion date has moved by 24 months from the original filing. 3 complaints are on record with the regulator.

At a glance

Project

  • NameNIDHI TOWERS
  • TypeResidential / Group Housing
  • Location
    • NEW LINK ROAD
    • ANDHERI
    • Mumbai Suburban
    • 400049
  • Pincode400049
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800008893
  • ReraGenie IDRG-MH-26307

Builder

  • NameRAJAN KUMAR MANCHANDA
  • Entity typeIndividual

Key dates

this monthRegisteredAug 2017First promiseJul 2022Revised toJul 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on19 Aug 2017
  • Promised completion31 Jul 2024
  • Revised completionRevised to 31 Jul 2024 (originally 31 Jul 2022)
  • Buildings1 building record
  • Documents filed104 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NIDHI TOWERSNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Aug 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

NIDHI TOWERS: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Aug 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed42

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots42
Closed/Covered42

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area836 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
RAJANKUMARAndheriMumbai Suburban

Approvals and building plan

Permissible FSI2257.6
Proposed, not sanctioned2,258 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSONBAR BUILDING PLOT NO 13 10TH ROAD JUHU

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectASHIM KHATRI
EngineerAjay Mahale
Chartered AccountantA K O R D & CO
PartnerRole in project
RAJAN KUMAR MANCHANDA-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800012449Jul 2022 → Jul 2023

Reason as filed by the promoter• The High Court of Bombay had put a stay on construction of new buildings for residential or commercial use, including malls, hotels and restaurants until the civic authorities comply with Municipal Solid Waste (Management and Handling) Rules, 2000. The Supreme Court by its order dated March 15, 2018 lifted the ban on construction of new buildings in Mumbai. MCGM only in Mid June 2018 allocated location where debris could be dumped. • During the Arbitration proceedings frivolous complaints were filed against us by M/s. Niraj Kakad Construction Pvt. Ltd. in MCGM due to which stop work notices

EXT51800017322Jul 2022 → Jan 2024

Reason as filed by the promoter• The promoter is the land owner of the project who has undergone hardships due to erstwhile promoter and also the disputes raised by only allottees of the projects. • The building is on the verge of completion however we had appointed M/s. Mitsubishi Elevator India Private Limited Wherein Installation was supposed to be initiated in the month of April 2023. They have not been able to deploy a contractor for installation of the lifts for past 3 months as they are facing acute shortage of labour. We have sent a legal notice through our Advocates (Copy Enclosed). • The amount of ₹ 7.65 Crores wa

EXT51800018911Jul 2022 → Jul 2024

Reason as filed by the promoter1)The consents as may be obtained from the allottees in Format-B 2) Reasons why the required percentage of consents from allottees could not be obtained and efforts taken for the same; 3) Reasons why the application for extension should be considered without the required min; 51% allottees consent; 4) Submit an explanatory note setting out the grounds and reasons for delay in completion of project and need for grant of extension along with supporting documents, planning to complete the work; 5) Upload Declaration- a)That the grant of extension of the project validity shall not affect/jeopardiz

Litigation declared1

CaseCourtStatus
187/2016HIGH COURT OF JUDICATURE AT BOMBAY ORDINARY ORIGINAL CIVIL JURISDICTIONORDER PASSED

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000012377NIRAJ KAKADRAJAN KUMAR MANCHANDA12/12/2017
CC006000000396820Kamal KhandelwalRajan kumar Manchanda25/07/2023
CC006000000429481Varun & Sarita KhandelwalRajan Kumar Manchanda29/02/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 May 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 May 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 9 Aug 2024

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf9 Aug 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf9 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Q3.pdf21 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf21 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: Annexure B-Disclosure of Sold or Unsold Inventory 30th June 2023.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Unsold.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: Annexure A-Disclosure of Sold or Unsold Inventory 31-12-2023.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: Annexure A-Disclosure of Sold or Unsold Inventory.pdf21 May 2024
Certificates of CA (Form 3)File: Form 3_Q3_FY 23-24 .pdf21 May 2024
Certificates of CA (Form 3)File: Final_Form 3_Q4_FY23-24_Nidhi Tower_compressed.pdf21 May 2024
Details of encumbrances concerned to FinanceFile: Annexure D-Non-Encumbrance Concerned to Finane.pdf18 Apr 2024
Details of encumbrances concerned to LegalFile: Annexure D-Non-Encumbrance Concerned to Finane.pdf18 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Q4.pdf18 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Self Declaration For Form 2A.pdf18 Apr 2024
CERSAI detailsFile: Annexure B-Asset Based Declaration.pdf18 Apr 2024
CERSAI detailsFile: Annexure C- Debtor Based Declaration.pdf18 Apr 2024
Certificates of CA (Form 3)File: Form 3-RK Manchanda-Sep 23.pdf6 Feb 2024
Certificates of CA (Form 3)File: Form 3_Merge.pdf6 Feb 2024
Details of encumbrances concerned to FinanceFile: Annexure D-Non-Encumbrance Concerned to Finance_Q3.pdf25 Jan 2024
Details of encumbrances concerned to LegalFile: Annexure D-Non-Encumbrance Concerned to Finance_Q3.pdf25 Jan 2024
Declaration in FORM BFile: FORM B.pdf25 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Q3.pdf25 Jan 2024
CERSAI detailsFile: Annexure B-Asset Based Declaration as on 31-12-2023.pdf25 Jan 2024
CERSAI detailsFile: Annexure C- Debtor Based Declaration as on 31-12-2023.pdf25 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ Upto dt 30062023.pdf13 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ Upto dt 30092023.pdf13 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Q1.pdf13 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Q2.pdf13 Oct 2023
Certificates of CA (Form 3)File: Form 3 Q1_23-24_SIGNED.pdf13 Oct 2023
Certificates of CA (Form 3)File: Form 3 Q2_23-24_SIGNED.pdf13 Oct 2023
Certificates of CA (Form 5)File: Form 5_2022-23_compressed.pdf9 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_2022-23_compressed.pdf9 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: SELF - DECLARATION FOR FORM 2A.pdf7 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf7 Oct 2023
Declaration in FORM BFile: RERA Form B Affidavit Cum Declaration Dated 9th August 2023.pdf9 Aug 2023
Details of encumbrances concerned to FinanceFile: Annexure K-Non-Encumbrance Concerned to Finance.pdf25 Jul 2023
Details of encumbrances concerned to LegalFile: Annexure K-Non-Encumbrance Concerned to Finance.pdf25 Jul 2023
CERSAI detailsFile: Annexure G-Asset Based Declaration 30th June 2023.pdf25 Jul 2023
CERSAI detailsFile: Annexure L- Debtor Based Declaration 30th June 2023.pdf25 Jul 2023
Certificates of CA (Form 3)File: fORM 3 .pdf8 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf26 Jun 2023
OtherFile: allotment letter of 7th floor (1)_compressed.pdf6 Jun 2023
OtherFile: Khandelwal 7th Floor Interim application (L) no 13792 of 2023 in Suit (ST) no 13971 of 2026 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Dec22.pdf10 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Q4.pdf10 May 2023
Certificates of CA (Form 3)File: FORM 3_compressed.pdf25 Apr 2023
Details of encumbrances concerned to FinanceFile: Non-Encumbrance concerned to legal.pdf20 Apr 2023
Details of encumbrances concerned to LegalFile: Non-Encumbrance concerned to legal.pdf20 Apr 2023
CERSAI detailsFile: Asset based declaration.pdf20 Apr 2023
CERSAI detailsFile: Debtor based declaration.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory.pdf20 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5_2021-22.pdf17 Apr 2023
Details of encumbrances concerned to FinanceFile: Annexure K-Non-Encumbrance Concerned to Finance Legal.pdf18 Jan 2023
Details of encumbrances concerned to LegalFile: Annexure K-Non-Encumbrance Concerned to Finance Legal.pdf18 Jan 2023
CERSAI detailsFile: Annexure L- Debtor Based Declaration.pdf18 Jan 2023
CERSAI detailsFile: Annexure G-Asset Based Declaration.pdf18 Jan 2023
Disclosure of sold/ booked inventoryFile: Annexure B-Disclosure of Sold or Unsold Inventory.pdf18 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 101122.pdf28 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 111122.pdf28 Dec 2022
Certificates of CA (Form 5)File: FORM 5_2021-22_compressed.pdf22 Aug 2022
Details of encumbrances concerned to LegalFile: Order_1.pdf19 Aug 2022
Details of encumbrances concerned to LegalFile: Order_2.pdf19 Aug 2022
Details of encumbrances concerned to LegalFile: Order_3.pdf19 Aug 2022
Details of encumbrances concerned to LegalFile: Order_4.pdf19 Aug 2022
Details of encumbrances concerned to LegalFile: Order_5.pdf19 Aug 2022
CERSAI detailsFile: Undertaking relating to CERSAI.pdf19 Aug 2022
PAN CardFile: PAN Card.pdf18 Aug 2022
CERSAI detailsFile: Debtor_Based_Search_CERSAI_Search_Report_200244951900.pdf18 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of Seperate Bank Account.pdf18 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: CC 9TH SEPT 2021.pdf11 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 16TH MAY 2022.pdf11 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5_2018-19.pdf11 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5_2019-20.pdf11 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5_2020-21.pdf11 Aug 2022
Declaration about Commencement CertificateFile: Declaration about CC_NEW.pdf4 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf4 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf4 Jul 2022
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - BOOKED INVENTORY.pdf4 Jul 2022
Certificates of CA (Form 3)File: Form 3-compressed.pdf4 Jul 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NIDHI TOWERS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ANDHERI6,700+ in Mumbai Suburban

2 kmNIDHI TOWERSCompleted 83Lapsed / revoked 41Other 74Dot size: filed unitsN

Filed coordinates, straight-line distance. 198 registered projects within 2 km.

Builder: RAJAN KUMAR MANCHANDA

RAJAN KUMAR MANCHANDA has 1 registration on MahaRERA, including NIDHI TOWERS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if NIDHI TOWERS is delayed beyond 31 Jul 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NIDHI TOWERS?

The registered promoter entity is RAJAN KUMAR MANCHANDA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NIDHI TOWERS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against NIDHI TOWERS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for NIDHI TOWERS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NIDHI TOWERS?

The professionals named in the filing: Architect: ASHIM KHATRI; Engineer: Ajay Mahale; Chartered Accountant: A K O R D & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NIDHI TOWERS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NIDHI TOWERS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NIDHI TOWERS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.