ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / NICON INFINITY PHASE 2

Completed No litigation declared Residential / Group Housing project

NICON INFINITY PHASE 2

By NICON INFRA LLP

RG-MH-29071 · RERA P99000028077 · Last updated on MahaRERA portal: 28 Jul 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
12 of 22Construction stages doneacross 2 buildings; furthest along: External plumbing and external plaster, 85%
1Complaints at MahaRERAon this registration
Jump to the 45 documents Report an error

NICON INFINITY PHASE 2 is a Residential / Group Housing project by NICON INFRA LLP in Palghar, Maharashtra, registered with MahaRERA as P99000028077 on 31 Jan 2021. The registration is recorded completed; possession was promised by 30 Jun 2025. 1 complaint is on record with the regulator.

At a glance

Project

  • NameNICON INFINITY PHASE 2
  • TypeResidential / Group Housing
  • Location
    • YASHWANT SMARTCITY
    • GOKHIWARE
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 410208
  • Pincode410208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000028077
  • ReraGenie IDRG-MH-29071

Builder

  • NameNICON INFRA LLP
  • Entity typePartnership
  • PartnersDhansukh Talakchand Shah, Fatehali Abdulrahim Patel, Farosh Fatehali Patel, Neil Kirit Somaiya, Kirtikumar Talakchand Shah
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2021PromisedJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Jan 2021
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed45 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NICON INFINITY - PHASE 2 - TOWER ANA160000
NICON INFINITY - PHASE 2 - TOWER BNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 28 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 85%.

NICON INFINITY - PHASE 2 - TOWER A79%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.55%
NICON INFINITY - PHASE 2 - TOWER B79%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.55%

Progress on shared amenities15

As on 28 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes35%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes70%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
NICON INFINITY - PHASE 2 - TOWER A11
NICON INFINITY - PHASE 2 - TOWER B11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area516 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5168.8
Proposed, not sanctioned5,169 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch241, GROUND FLOOR, HILL VIEW APARTMENTS, HILL ROAD, OPP MEHBOOB STUDIO, BANDRA WEST, MUMBAI 400050

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANAT MEHTA AND ASSOC
EngineerHIREN TANNA AND ASSOC
Chartered AccountantGanesh & Rajendra Associates
PartnerRole in project
NICON INFRA LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000480298Mayur Chandrashekhar NerkarNICON INFRA LLP05/05/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Dec 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Dec 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Jul 2023

Documents filed45

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Phase 2 A and B.pdf28 Jul 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 for RERA upload.pdf28 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 30 12 22.pdf1 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 21.pdf1 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 22.pdf1 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 4 1 23.pdf21 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31 3 22.pdf21 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31 6 22.pdf21 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30062022 form 1.pdf23 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31122022 form 1.pdf23 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30092022 form 1.pdf23 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30062022 form 2.pdf23 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30092022 form 2.pdf23 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30062022 form 3.pdf23 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30092022 form 3.pdf23 Jan 2023
Building plan approvalFile: Plan_compressed for rera.pdf21 Aug 2022
Building plan approvalFile: Plan_compressed for rera.pdf21 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan_compressed for rera.pdf21 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan_compressed for rera.pdf21 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Nicon Architrectural Certificate 2022_compressed.pdf9 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: nicon eng cert 2022_compressed.pdf9 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Certificate_Signed_compressed.pdf5 Feb 2022
Details of encumbrancesFile: encumb letter.pdf29 Dec 2021
Declaration about Commencement CertificateFile: Format D.pdf19 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2nd Work Completion june 2021.pdf29 Jun 2021
OtherFile: DEVELOPMENT AGREEMENT nicon-1.pdf21 Jan 2021
OtherFile: DEVELOPMENT AGREEMENT nicon-2.pdf21 Jan 2021
OtherFile: DEVELOPMENT AGREEMENT nicon-3.pdf21 Jan 2021
OtherFile: DEVELOPMENT AGREEMENT nicon-4.pdf21 Jan 2021
OtherFile: DEVELOPMENT AGREEMENT nicon-5.pdf21 Jan 2021
OtherFile: GPOA REGISTERED-1-16.pdf21 Jan 2021
OtherFile: GPOA REGISTERED-17-35.pdf21 Jan 2021
PAN CardFile: NILLPPAN.pdf14 Jan 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf6 Jan 2021
Proforma of Allotment letterFile: Allotment Letter.pdf6 Jan 2021
Building plan approvalFile: A and B WING APPROVED BUILDING PLAN.pdf25 Dec 2020
Copy of the legal title reportFile: Titel Clearance Certificate A n b.pdf25 Dec 2020
Building Plan Approval / NA Order for plotted developmentFile: A and B WING APPROVED BUILDING PLAN.pdf25 Dec 2020
Commencement Certificates / NA Order for plotted developmentFile: FINAL CC OF NICON INFINTY.pdf25 Dec 2020
Declaration in FORM BFile: A B wing form B compressed.pdf25 Dec 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ArchCERTF NICON PHASE 2 COMPRESSED.pdf25 Dec 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Str Engr CERTF NICON PHASE 2.pdf25 Dec 2020
Layout approvalFile: Nicon Infinity - Phase 2 - Layout_compressed.pdf14 Dec 2020
Details of encumbrancesFile: Nicon Infinity - Phase 2 - details of Encumbrances.pdf14 Dec 2020
Copy of Layout Approval (in case of layout)File: Nicon Infinity - Phase 2 - Layout_compressed.pdf14 Dec 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Nicon Infinity Phase 1Building No 8 Yashwant SmartCity Near Madhuban Township Gokhiware Vasai East166CompletedDec 2018Late, Nov 2020

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NICON INFINITY PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GOKHIWARE3,200+ in Palghar

2 kmNICON INFINITY PHASE 2Completed 17Lapsed / revoked 18Other 53Dot size: filed unitsN

Filed coordinates, straight-line distance. 88 registered projects within 2 km.

Builder: NICON INFRA LLP

NICON INFRA LLP has 2 registrations on MahaRERA, including NICON INFINITY PHASE 1 and NICON INFINITY PHASE 2. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if NICON INFINITY PHASE 2 is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NICON INFINITY PHASE 2?

The registered promoter entity is NICON INFRA LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NICON INFINITY PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against NICON INFINITY PHASE 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for NICON INFINITY PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NICON INFINITY PHASE 2?

The professionals named in the filing: Architect: SANAT MEHTA AND ASSOC; Engineer: HIREN TANNA AND ASSOC; Chartered Accountant: Ganesh & Rajendra Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NICON INFINITY PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NICON INFINITY PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NICON INFINITY PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.