Home / Browse projects / Raigarh, Maharashtra / NEXUS PEACE

Registered No litigation declared Others project

NEXUS PEACE

By NEXUS INFRA

RG-MH-19125 · RERA P52000078173 · Last updated on MahaRERA portal: 16 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
7 of 10Construction stages donefurthest along: External plumbing and external plaster, 80%
39 of 68Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

NEXUS PEACE is a Others project by NEXUS INFRA in Raigarh, Maharashtra, registered with MahaRERA as P52000078173 on 29 Nov 2024. Possession is promised by 31 Dec 2026. 29 of the 68 units on this registration are recorded sold or booked, and 7 of 10 construction stages are filed complete.

At a glance

Project

  • NameNEXUS PEACE
  • TypeOthers
  • Location
    • PLOT 49
    • SECTOR 3
    • Karanjade
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • RERA no.P52000078173
  • ReraGenie IDRG-MH-19125

Builder

  • NameNEXUS INFRA
  • Entity typePartnership
  • GSTIN27AANFN8794K1Z8
  • PartnersBHANJI DHANJI GAMI, PRATAPSINGH RAVINDRA DESHMUKH, LAXMAN KHIMJI PATEL, PRAVINKUMAR HIRABHAI DUBARIYA, NILESH HARAJI BHATESRA
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Nov 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed77 files

Current status

43%29 of 68 units booked
80.0%Work done, per cost certificate

Figures as on 16 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Nexus PeaceNA121264468

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 10 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 80%.

Nexus Peace: 83% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed33

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots33
Closed/Covered33

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area800 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Jun 2025
LandownerVillageDistrict
PARSHURAM DATTU MHATREKolhi koparRaigarh

Approvals and building plan

Sanctioning authorityCity And Industrial Development Corporation Of Maharashtra Ltd
Permissible FSI3773.83
Proposed, not sanctioned3,731 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR SHOP NO 2 SHREE BALAJI BANQUETS PLOT NO 231 BEHIND MTNL OLD PANVEL NAVI MUMBAI 410206
Estimated costRs 8.76 cr
Cost incurredRs 7.00 cr
Work done80.0%
BuildingWingEstimatedIncurred
Nexus PeaceNARs 8.76 crRs 7.00 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA-One Architects
EngineerYATEESH TARE
EngineerParth Arethiya
Chartered AccountantDeepesh Shah & Associates
Chartered AccountantA T Upadhye & Co
PartnerRole in project
NEXUS INFRA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 01 - Architects Certificate Signed.pdf16 May 2026
Withdrawal Update Form 2File: Form2 - Nexus Peace.pdf16 May 2026
Withdrawal Update Form 3File: Form3 Q1 FY 2025-26.pdf16 May 2026
Form 2A (FY 2025-2026)File: Form 2A to Upload.pdf28 Apr 2026
Withdrawal Update Form 1File: FORM 01 - Architects Certificate Signed.pdf21 Apr 2026
Withdrawal Update Form 2File: Form2 - Nexus Peace.pdf21 Apr 2026
Withdrawal Update Form 3File: Form 3-CA Certificate-NI Q4.pdf21 Apr 2026
Withdrawal Update Form 1File: Form 1 for upload.pdf31 Jan 2026
Withdrawal Update Form 1File: FORM 01 - Architects Certificate.pdf31 Jan 2026
Withdrawal Update Form 2File: Form2 - Nexus Peace.pdf31 Jan 2026
Withdrawal Update Form 2File: Form2 - Nexus Peace.pdf31 Jan 2026
Withdrawal Update Form 3File: Form 3-CA Certificate-NI Q3 signed.pdf31 Jan 2026
Withdrawal Update Form 3File: Form 3-CA Certificate-NI Q3 signed.pdf31 Jan 2026
Withdrawal Update Form 1File: Form 1 for upload.pdf4 Nov 2025
Withdrawal Update Form 2File: Form 2 for upload.pdf4 Nov 2025
Withdrawal Update Form 3File: Form 3 Q2 FY 25-26 NI.pdf4 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 -Nexus Infra for upload.pdf17 Sep 2025
Form 1File: Form 1 for upload.pdf16 Aug 2025
Form 2File: ENGINEER’S CERTIFICATE - Q3.pdf16 Aug 2025
Form 3File: Form 3 signed_compressed.pdf16 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold declaration.pdf16 Aug 2025
Form 1File: Rera Form 1 signed.pdf16 Aug 2025
Form 2File: ENGINEER’S CERTIFICATE - Q4.pdf16 Aug 2025
Form 3File: Form 3-CA Certificate-NI (1).pdf16 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold declaration.pdf16 Aug 2025
Form 2A (FY 2024-2025)File: Form 2A - signed.pdf16 Aug 2025
Withdrawal Update Form 1File: FORM 01-signed.pdf25 Jul 2025
Withdrawal Update Form 1File: FORM 01-signed.pdf25 Jul 2025
Withdrawal Update Form 2File: Form 2_0001.pdf25 Jul 2025
Withdrawal Update Form 2File: Form 2_0001.pdf25 Jul 2025
Withdrawal Update Form 3File: Form3 Q1 FY 2025-26.pdf25 Jul 2025
Withdrawal Update Form 3File: Form3 Q1 FY 2025-26.pdf25 Jul 2025
Building plan approvalFile: 2 Karanjade_ACC Plans.pdf2 Jul 2025
Commencement certificateFile: 49, Karanjade_ACC Certificate.pdf1 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA Certificate-NI (1).pdf22 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold declaration.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Form 1.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 for upload.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 signed_compressed.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold declaration.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 for upload.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 signed_compressed.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold declaration.pdf17 Jan 2025
Other - TechnicalFile: Annexure A.pdf20 Nov 2024
Other - TechnicalFile: Annexure A.pdf20 Nov 2024
Copy of the legal title reportFile: 01 Search title Report.pdf14 Nov 2024
Proforma of Allotment letterFile: 03 Allotment letter (2).pdf14 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA Certificate-NI table_compressed.pdf14 Nov 2024
Other - LegalFile: 04 Agreement to lease_compressed.pdf14 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: 05 Format A.pdf14 Nov 2024
Proforma of Agreement for saleFile: 02 RERA DRAFT agreement NEXUS INFRA - NEXUS PEACE -.pdf14 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 06 Format B (2).pdf14 Nov 2024
Other - TechnicalFile: CC email screenshot from CIDCO to MAHARERA.pdf29 Oct 2024
Building plan approvalFile: 10 CC Drawings Panvel.pdf22 Oct 2024
Declaration in FORM BFile: 9 Form B Through Partner.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01 Form 1 signed.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02 Form 2.pdf22 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: 3 CC letter.pdf22 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 10 CC Drawings Panvel.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: 11 Disclosure of sol unsold inventory.pdf22 Oct 2024
Declaration about Commencement CertificateFile: 8 Declaration about CC.pdf22 Oct 2024
CERSAI detailsFile: 12 CERSAI.pdf22 Oct 2024
Deviation Report with respect to Allotment letterFile: 17 No Deviation Allotment.pdf22 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report 1.pdf22 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 13 Other Real Estate - BDG.pdf22 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 13 Other Real Estate - LKP.pdf22 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 13 Other Real Estate - NHB.pdf22 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 13 Other Real Estate - PHD.pdf22 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 13 Other Real Estate - PRD.pdf22 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: 10 Disclosure of Loan.pdf22 Oct 2024
Layout approvalFile: No Layout Certificate.pdf21 Oct 2024
PAN CardFile: Nexus Infra PAN.pdf21 Oct 2024
Details of encumbrances concerned to FinanceFile: 1 No Encumbrance Cer to Finance.pdf21 Oct 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance Legal.pdf21 Oct 2024
Copy of Layout Approval (in case of layout)File: No Layout Certificate.pdf21 Oct 2024
Details of encumbrances concerned to LegalFile: 1 No Encumbrance Cer to Finance.pdf21 Oct 2024
Details of encumbrances concerned to LegalFile: No Encumbrance Legal.pdf21 Oct 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
NEXUS VIEWP52000022163SECTOR 6, Raigarh103Sep 2019CompletedDec 2023Aug 2022

How this compares with Raigarh

43%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NEXUS PEACE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SECTOR 35,900+ in Raigarh

Builder: NEXUS INFRA

Nexus Infra has 3 registrations on MahaRERA, including Nexus Meridian and NEXUS VIEW. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if NEXUS PEACE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEXUS PEACE?

The registered promoter entity is NEXUS INFRA, a partnership as per the filing. Its GSTIN 27AANFN8794K1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEXUS PEACE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NEXUS PEACE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NEXUS PEACE?

The professionals named in the filing: Architect: A-One Architects; Engineer: YATEESH TARE; Engineer: Parth Arethiya; Chartered Accountant: Deepesh Shah & Associates; Chartered Accountant: A T Upadhye & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEXUS PEACE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEXUS PEACE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEXUS PEACE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.