Home / Browse projects / Pune, Maharashtra / Nexus Kinaara D

Completed No litigation declared Residential / Group Housing project

Nexus Kinaara D

By Nexus Enterprises

RG-MH-27530 · RERA P52100033605 · Last updated on MahaRERA portal: 2 Feb 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Internal walls, 95%
21 of 120Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 164 documents Report an error

Nexus Kinaara D is a Residential / Group Housing project by Nexus Enterprises in Pune, Maharashtra, registered with MahaRERA as P52100033605 on 2 Mar 2022. The registration is recorded completed; possession was promised by 30 Dec 2025. The completion date has moved by 12 months from the original filing. 99 of the 120 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameNexus Kinaara D
  • TypeResidential / Group Housing
  • Location
    • Behind River residency
    • Chikhali
    • Haveli
    • Pune
    • 412114
  • Pincode412114
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100033605
  • ReraGenie IDRG-MH-27530

Builder

  • NameNexus Enterprises
  • Entity typePartnership
  • PartnerSatishkumar Ravjibhai Patel
  • Other registrations2 more →
  • Completed2 of 3

Key dates

this monthRegisteredMar 2022First promiseDec 2024Revised toDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Mar 2022
  • Promised completion30 Dec 2025
  • Revised completionRevised to 30 Dec 2025 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed164 files

Current status

82%99 of 120 units booked

Figures as on 2 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D BuildingNA18151200120

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

D Building: 89% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 2 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes70%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed75

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots75
Closed/Covered75

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,080 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Sep 2025
LandownerVillageDistrict
Dhanvir Madhukar JadhavChikhaliPune
Daulat Madhukar JadhavChikhaliPune
Madhukar Rangnath JadhavChikhaliPune
Hanumant Nivrutti JadhavChikhaliPune

Approvals and building plan

Sanctioning authorityPimpari Chinchwad Muncipal Coporation
Permissible FSI9966.13
Proposed, not sanctioned9,966 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIndrayani Nagar, Bhosari, Pune

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMahendra Thakur and Associates
ArchitectDream Space Architect
EngineerAjinkya A Lahigude
Chartered AccountantShubham S Bora
Chartered AccountantMohamadyasir A Bagwan
Chartered AccountantDHIRAJ MANOJ BALDOTA
Chartered AccountantVinit D Achha and Associates Chartered Accountant
PartnerRole in project
Nexus Enterprises-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025534Dec 2024 → Dec 2025

Reason as filed by the promoterThe shortage of raw material like Cement, Crushed Sand, Steel and more which constitute major portion for Construction Industry, however we are not in position to ascertain the exact the delay for such activity for the project We wish to inform you that the construction of our project has been 90% completed. Given these circumstances, we kindly request MahaRERA to grant us an extension of Twelve months for the archiving completion certificate of our project. This extension will allow us to complete all necessary formalities and obtain the Completion Certificate without further complications.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed164

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 164 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 1) ARCHITECT CERTIFICATE WING D DATE 31-03-22.pdf2 Feb 2026
Withdrawal Update Form 1File: 1) ARCHITECT CERTIFICATE WING D DATE 31-03-22.pdf2 Feb 2026
Withdrawal Update Form 2File: 1) ENG CERTIFICATE 17-05-2022 (31-03-22).pdf2 Feb 2026
Withdrawal Update Form 2File: 1) ENG CERTIFICATE 17-05-2022 (31-03-22).pdf2 Feb 2026
Withdrawal Update Form 3File: 2) CA CERTIFICATE DATE 16-05-2024 (31-03-24)_comp.pdf2 Feb 2026
Withdrawal Update Form 3File: 2) CA CERTIFICATE DATE 16-05-2024 (31-03-24)_comp.pdf2 Feb 2026
Occupational CertificateFile: Occupancy Certificate.pdf2 Feb 2026
Occupational CertificateFile: Occupancy Certificate.pdf18 Sep 2025
Form 5 (FY 2021-2022)File: 1 Form 5 (02-03-2022 to 31-03-2022) Date 22-09-2022.pdf25 Aug 2025
Form 5 (FY 2022-2023)File: 2 Form 5 (01-04-2022 to 31-03-2023).pdf25 Aug 2025
Form 5 (FY 2023-2024)File: 3 Form 5 (01-04-2023 to 31-03-2024) Date 09-07-2024.pdf25 Aug 2025
Form 5 (FY 2024-2025)File: 4)Form - 5 ( 01-04-2024 - 31-03-2025) Date - 06-08-2025.pdf25 Aug 2025
Form 1File: 16) ARCHITECT CERTIFICATE WING D DATE 30-06-2025.pdf25 Jul 2025
Form 2File: 16) ENGINEER CRTIFICATE DATE-30-06-2025.pdf25 Jul 2025
Form 3File: 15 CA CERTIFICATE DATE 30-06-2025 compressed.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: 14) DISCLOUSURE OF SOLD & UNSOLD ( 01-04-2025 TO 30-06-2025 ) Q1_compressed.pdf25 Jul 2025
Form 1File: 11) ARCHITECT CERTIFICATE WING D DATE 31-03-2024.pdf24 Jul 2025
Form 2File: 10) ENGINEET CRTIFICATE DATE - 31-03-2024.pdf24 Jul 2025
Form 3File: 10 CA CERTIFICATE DATE 16-05-2024 (March-24)_compressed.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: 9) DISCLOUSURE OF SOLD & UNSOLD ( 01-01-2024 TO 31-03-2024 ) Q4_compressed.pdf24 Jul 2025
Form 1File: 12) ARCHITECT CERTIFICATE WINGD DATE 30-06-2024.pdf24 Jul 2025
Form 2File: 11) ENGINEET CRTIFICATE DATE - 30-06-2024.pdf24 Jul 2025
Form 3File: 11 CA CERTIFICATE DATE 13-07-2024 (June-24)_compressed.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: 10) DISCLOUSURE OF SOLD & UNSOLD ( 01-04-2024 TO 30-06-2024 ) Q1_compressed.pdf24 Jul 2025
Form 1File: 13) ARCHITECT CERTIFICATE WINGD DATE 30-09-2024.pdf24 Jul 2025
Form 2File: 12) ENGINEET CRTIFICATE DATE - 30-09-2024.pdf24 Jul 2025
Form 3File: 12 CA CERTIFICATE DATE 22-11-2024 (Sep-24)_compressed.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: 11) DISCLOUSURE OF SOLD & UNSOLD ( 01-07-2024 TO 30-09-2024 ) Q2_compressed.pdf24 Jul 2025
Form 1File: 14) ARCHITECT CERTIFICATE WINGD DATE 31-12-2024.pdf24 Jul 2025
Form 2File: 14) ENGINEER CRTIFICATE DATE 0512025 Date31122024.pdf24 Jul 2025
Form 3File: 13 CA CERTIFICATE DATE 25022025 Dec24compressed.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: 12) DISCLOUSURE OF SOLD & UNSOLD ( 01-10-2024 TO 31-12-2024 ) Q3_compressed.pdf24 Jul 2025
Form 1File: 15) ARCHITECT CERTIFICATE WING D DATE 31-03-2025.pdf24 Jul 2025
Form 2File: 15) ENGINEER CRTIFICATE DATE 31032025.pdf24 Jul 2025
Form 3File: 14 CA CERTIFICATE DATE (31 03 2025compressed.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: 13) DISCLOUSURE OF SOLD & UNSOLD ( 01-01-2025 TO 31-03-2025 ) Q4_compressed.pdf24 Jul 2025
Form 1File: 1) ARCHITECT CERTIFICATE WING D DATE 31-03-22.pdf23 Jul 2025
Form 2File: 1) ENG CERTIFICATE 17-05-2022 (31-03-22).pdf23 Jul 2025
Form 3File: 1 CA CERTIFICATE DATE 23-02-2022_compressed.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: 1) DISCLOUSURE OF SOLD & UNSOLD ( 01-01-2022 TO 31-03-2022 ) Q4_compressed.pdf23 Jul 2025
Form 1File: 2) ARCHITECT CERTIFICATE WING D DATE 30-06-22.pdf23 Jul 2025
Form 2File: 2) ENGINEET CRTIFICATE DATE 30-06-2022.pdf23 Jul 2025
Form 3File: 3 CA CERTIFICATE DATE 30-06-2022_compressed.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: 2) DISCLOUSURE OF SOLD & UNSOLD ( 01-04-2022 TO 30-06-2022 ) Q1_compressed.pdf23 Jul 2025
Form 1File: 3) ARCHITECT CERTIFICATE WING D DATE 30-09-22.pdf23 Jul 2025
Form 2File: 4)ENGINEET CRTIFICATE DATE - 30-09-2022.pdf23 Jul 2025
Form 3File: 4 CA CERTIFICATE DATE 30-09-2022_compressed.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: 3) DISCLOUSURE OF SOLD & UNSOLD ( 01-07-2022 TO 30-09-2022 ) Q2_compressed.pdf23 Jul 2025
Form 1File: 4) ARCHITECT CERTIFICATE WING D DATE 01-12-2022.pdf23 Jul 2025
Form 2File: 5) ENGINEET CRTIFICATE DATE 05-12-2022 (31-12-22).pdf23 Jul 2025
Form 3File: 5 CA CERTIFICATE DATE 31-12-2022_compressed.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: 4) DISCLOUSURE OF SOLD & UNSOLD ( 01-10-2022 TO 31-12-2022 ) Q3_compressed.pdf23 Jul 2025
Form 1File: 5) ARCHITECT CERTIFICATE WING D DATE 20-01-2023.pdf23 Jul 2025
Form 2File: 5) ENGINEET CRTIFICATE DATE 24-01-2023.pdf23 Jul 2025
Form 3File: 6 CA CERTIFICATE DATE 31-03-2023_compressed.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: 5) DISCLOUSURE OF SOLD & UNSOLD ( 01-01-2023 TO 31-03-2023 ) Q4_compressed.pdf23 Jul 2025
Form 1File: 7) ARCHITECT CERTIFICATE WING D DATE 01-06-2023.pdf23 Jul 2025
Form 2File: 7) ENGINEET CRTIFICATE DATE 29-07-2023 (30-06-23).pdf23 Jul 2025
Form 3File: 7 CA CERTIFICATE DATE 31-06-2023_compressed.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: 6) DISCLOUSURE OF SOLD & UNSOLD ( 01-04-2023 TO 30-06-2023 ) Q1_compressed.pdf23 Jul 2025
Form 1File: 9) ARCHITECT CERTIFICATE WING D DATE 26-09-2023.pdf23 Jul 2025
Form 2File: 8) ENGINEET CRTIFICATE DATE (30-09-23).pdf23 Jul 2025
Form 3File: 8 CA CERTIFICATE DATE 30-09-2023_compressed.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: 7) DISCLOUSURE OF SOLD & UNSOLD ( 01-07-2023 TO 30-09-2023 ) Q2_compressed.pdf23 Jul 2025
Form 1File: 10) ARCHITECT CERTIFICATE WING D DATE 31-12-2023.pdf23 Jul 2025
Form 2File: 9) ENGINEET CRTIFICATE DATE - 31-12-2023.pdf23 Jul 2025
Form 3File: 9 CA CERTIFICATE DATE 31-12-2023_compressed.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: 8) DISCLOUSURE OF SOLD & UNSOLD ( 01-10-2023 TO 31-12-2023 ) Q3_compressed.pdf23 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 15) ARCHITECT CERTIFICATE WING D DATE 31-03-2025.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 15) ENGINEET CRTIFICATE-31032025.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F-3 1.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 14) ARCHITECT CERTIFICATE WINGD DATE 31-12-2024.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F-1.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F-3.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F-2.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 31.pdf13 Jan 2025
Layout approvalFile: 1_compressed.pdf10 Jan 2025
Copy of Layout Approval (in case of layout)File: 1_compressed.pdf10 Jan 2025
Declaration in FORM BFile: Form B 09-01-2025.pdf10 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD -Discolsure 30-09-2024.pdf10 Jan 2025

How this compares with Pune

82%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Nexus Kinaara D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chikhali13,700+ in Pune

2 kmNexus Kinaara DCompleted 67Lapsed / revoked 30Other 57Dot size: filed unitsN

Filed coordinates, straight-line distance. 154 registered projects within 2 km.

Builder: Nexus Enterprises

Nexus Enterprises has 3 registrations on MahaRERA, including Nexus Kinaara B C and Nexus Kinaara D. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Nexus Kinaara D is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Nexus Kinaara D?

The registered promoter entity is Nexus Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Nexus Kinaara D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Nexus Kinaara D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Nexus Kinaara D?

The professionals named in the filing: Architect: Mahendra Thakur and Associates; Architect: Dream Space Architect; Engineer: Ajinkya A Lahigude; Chartered Accountant: Shubham S Bora; Chartered Accountant: Mohamadyasir A Bagwan; Chartered Accountant: DHIRAJ MANOJ BALDOTA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nexus Kinaara D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nexus Kinaara D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nexus Kinaara D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.