Home / Browse projects / Pune, Maharashtra / Nexus Kinaara A
Nexus Kinaara A
RG-MH-93723 · RERA P52100051339 · Last updated on MahaRERA portal: 13 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 36 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Nexus Kinaara A is a Residential / Group Housing project by Nexus Enterprises in Pune, Maharashtra, registered with MahaRERA as P52100051339 on 8 Jun 2023. Possession is promised by 30 Apr 2028. The completion date has moved by 36 months from the original filing. 89 of the 180 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameNexus Kinaara A
- TypeResidential / Group Housing
- Location
- Behind River Residency
- Chikhali
- Haveli
- Pune
- 412114
- Pincode412114
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100051339
- ReraGenie IDRG-MH-93723
Builder
- NameNexus Enterprises
- Entity typePartnership
- PartnersSatishkumar Ravjibhai Patel, NARESHKUMAR RAVJIBHAI PATEL
- Other registrations2 more →
- Completed2 of 3
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on8 Jun 2023
- Promised completion30 Apr 2028
- Revised completionRevised to 30 Apr 2028 (originally 30 Apr 2025)
- Buildings1 building record
- Documents filed178 files
Current status
Figures as on 13 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Building | NA | 15 | 13 | 180 | 0 | 180 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 13 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 75%.
A Building: 65% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 13 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 60% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 90% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed203
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership10
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Dhanvir Madhukar Jadhav | Chikhali | Pune |
| Daulat Madhukar Jadhav | Chikhali | Pune |
| Madhukar Ranganath Jadhav | Chikhali | Pune |
| Hanumant Nivrutti Jadhav | Chikhali | Pune |
| Sunita Hanumant Jadhav | Chikhali | Pune |
| Ashwini Shrikant Kolhe | Khadakwasala | Pune |
| Akshay Hanumant Jadhav | Chikhali | Pune |
| Ashish Hanumant Jadhav | Chikhali | Pune |
| Taramati Madhukar Jadhav | Chikhali | Pune |
| Pooja Dhanvir Jadhav | Chikhali | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A Building | NA | Rs 35.21 cr | Rs 18.02 cr |
| - | NA | Rs 77.01 lakh | - |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Dream Space Architect |
| Engineer | Ajinkya A Lahigude |
| Engineer | Dipali D Kashid |
| Engineer | Nexus Enterprises |
| Chartered Accountant | CA Dhiraj Manoj Baldota Chartered Accountant |
| Chartered Accountant | Shubham S Bora |
| Chartered Accountant | Mohamadyasir A Bhagwan |
| Partner | Role in project |
|---|---|
| Nexus Enterprises | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDevelopment works not started till date and no any units sold to any customer till date. reason for not completing the development works in the project within the period.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Apr 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Oct 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Apr 2028
Documents filed178
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 178 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 13 Jul 2026 |
| Withdrawal Update Form 2File: 14 ENGINEER CERTIFICATE NEXUS ENTERPRISES WING A DATE JUNE-26.pdf | 13 Jul 2026 |
| Withdrawal Update Form 3File: CA Certificate Nexus Kinaara.pdf | 13 Jul 2026 |
| Withdrawal Update Form 1File: F1.pdf | 25 May 2026 |
| Withdrawal Update Form 2File: 12 ENGINEER CERTIFICATE NEXUS ENTERPRISES WING A DATE DEC 25.pdf | 25 May 2026 |
| Withdrawal Update Form 3File: Form 3_compressed.pdf | 25 May 2026 |
| Form 2A (FY 2025-2026)File: 2A.pdf | 7 May 2026 |
| Form 5 (FY 2025-2026)File: Nexus Kinaara A FORM - 5 FY 25-26.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: F1.pdf | 22 Apr 2026 |
| Withdrawal Update Form 2File: 12 ENGINEER CERTIFICATE NEXUS ENTERPRISES WING A DATE DEC 25.pdf | 22 Apr 2026 |
| Withdrawal Update Form 3File: F3 (3).pdf | 22 Apr 2026 |
| Withdrawal Update Form 1File: 12 ARCHITECT CERTIFICATE WING A DATE 31-12-2025.pdf | 16 Jan 2026 |
| Withdrawal Update Form 2File: 12 ENGINEER CERTIFICATE NEXUS ENTERPRISES WING A DATE DEC 25.pdf | 16 Jan 2026 |
| Withdrawal Update Form 3File: 12) C A CERTIFICATE NEXUS ENTERPRISES WING A DATE 31-12-2025 (DEC 2025).pdf | 16 Jan 2026 |
| Withdrawal Update Form 1File: 11 ARCHITECT CERTIFICATE WING A DATE 30-09-2025.pdf | 11 Nov 2025 |
| Withdrawal Update Form 2File: 11 ENGINEER CERTIFICATE NEXUS ENTERPRISES WING A DATE SEP25.pdf | 11 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 - Sep 2025_compressed.pdf | 11 Nov 2025 |
| Withdrawal Update Form 1File: 11 ARCHITECT CERTIFICATE WING A DATE 30-09-2025.pdf | 10 Nov 2025 |
| Withdrawal Update Form 2File: 11 ENGINEER CERTIFICATE NEXUS ENTERPRISES WING A DATE SEP25.pdf | 10 Nov 2025 |
| Withdrawal Update Form 3File: 3 C A CERTIFICATE NEXUS ENTERPRISES WING A DATE _compressed.pdf | 10 Nov 2025 |
| Building plan approvalFile: Page (1)_compressed.pdf | 11 Oct 2025 |
| Building plan approvalFile: Page (2).pdf | 11 Oct 2025 |
| Building plan approvalFile: Page (3).pdf | 11 Oct 2025 |
| Building plan approvalFile: Page (4).pdf | 11 Oct 2025 |
| Building plan approvalFile: Page (5).pdf | 11 Oct 2025 |
| Building plan approvalFile: Page (6).pdf | 11 Oct 2025 |
| Building plan approvalFile: Page (7).pdf | 11 Oct 2025 |
| Building plan approvalFile: Page (8).pdf | 11 Oct 2025 |
| Building plan approvalFile: Page (9).pdf | 11 Oct 2025 |
| Withdrawal Update Form 1File: 1 ARCHITECT CERTIFICATE WING A DATE 30-06-2025.pdf | 11 Oct 2025 |
| Withdrawal Update Form 2File: 2 ENGINEER CERTIFICATE NEXUS ENTERPRISES WING A DATE JUNE25.pdf | 11 Oct 2025 |
| Withdrawal Update Form 3File: 3 C A CERTIFICATE NEXUS ENTERPRISES WING A DATE _compressed.pdf | 11 Oct 2025 |
| Form 2A (FY 2023-2024)File: Form 2A.pdf | 10 Oct 2025 |
| Form 2A (FY 2024-2025)File: Form 2A.pdf | 10 Oct 2025 |
| Form 5 (FY 2023-2024)File: FORM - 5 Date - 29-03-2025.pdf | 25 Aug 2025 |
| Form 5 (FY 2024-2025)File: FORM - 5 FY 24-25 Date - 15-07-2025.pdf | 25 Aug 2025 |
| Form 1File: 2 ARC CERT WING A DATE 30 06 23.pdf | 16 Jun 2025 |
| Form 2File: 2) ENGINEER CERTIFICATE NEXUS ENTERPRISES WING A DATE -30 06 23.pdf | 16 Jun 2025 |
| Form 3File: 2CA CERTIFICATE NEXUS ENTERPRISES WING A DATE 3062023.pdf | 16 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 1DISCLOUSURE SOLD UNSOLD 01042023 TO 30062023 Q1.pdf | 16 Jun 2025 |
| Form 1File: 3 ARC CERT WING A DATE 30 09 23.pdf | 16 Jun 2025 |
| Form 2File: 3) ENGINEER CERTIFICATE NEXUS ENTERPRISES WING A DATE -30 09 23.pdf | 16 Jun 2025 |
| Form 3File: 3C A CERTIFICATE NEXUS ENTERPRISES WING A DATE 3092023.pdf | 16 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 2 DISCLOUSURE OF SOLD 01072023 TO 30092023 Q2.pdf | 16 Jun 2025 |
| Form 1File: 4 ARC CERT WING A DATE 31 12 23.pdf | 16 Jun 2025 |
| Form 2File: 4) ENGINEER CERTIFICATE NEXUS ENTERPRISES WING A DATE - 31 12 23.pdf | 16 Jun 2025 |
| Form 3File: 4 C A CERTIFICATE NEXUS ENTERPRISES WING A DATE 31122023.pdf | 16 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 3DISCLOUSURE OF SOLD 01102023 TO 31122023 Q3.pdf | 16 Jun 2025 |
| Form 1File: 5 ARC CERT WING A DATE 31 03 24.pdf | 16 Jun 2025 |
| Form 2File: 5) ENGINEER CERTIFICATE NEXUS ENTERPRISES WING A DATE - 31 03 24.pdf | 16 Jun 2025 |
| Form 3File: 5 C A CERTIFICATE NEXUS ENTERPRISES WING A DATE 31032024.pdf | 16 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 4 DISCLOUSURE OF SOLD 01012024 TO 31032024 Q4.pdf | 16 Jun 2025 |
| Form 1File: 6 ARC CERT WING A DATE 30 06 24.pdf | 16 Jun 2025 |
| Form 2File: 6) ENGINEER CERTIFICATE NEXUS ENTERPRISES WING A DATE - 30 06 24.pdf | 16 Jun 2025 |
| Form 3File: 6 C A CERTIFICATE NEXUS ENTERPRISES WING A DATE 30062024.pdf | 16 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 5DISCLOUSURE OF SOLD01042024 TO 30062024 Q1.pdf | 16 Jun 2025 |
| Form 1File: 7 ARC CERT WING A DATE 30924.pdf | 16 Jun 2025 |
| Form 2File: 7) ENGINEER CERTIFICATE NEXUS ENTERPRISES WING A DATE - 30 -09 -24.pdf | 16 Jun 2025 |
| Form 3File: 7C A CERTIFICATE NEXUS ENTERPRISES WING A DATE 3092024.pdf | 16 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 6DISCLOUSURE OF SOLD01072024 TO 30092024 Q2.pdf | 16 Jun 2025 |
| Form 1File: 8 ARCHITECT CERTIFICATE WING A DATE 31122024.pdf | 16 Jun 2025 |
| Form 2File: 8 ENGINEER CERTIFICATE NEXUS ENTERPRISES WING A DATE - 31122024.pdf | 16 Jun 2025 |
| Form 3File: 8 C A CERTIFICATE NEXUS ENTERPRISES WING A DATE 31122024.pdf | 16 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 7DISCLOUSURE OF SOLD01102024 TO 31122024 Q3.pdf | 16 Jun 2025 |
| Form 1File: 9 ARCHITECT CERTIFICATE WING A DATE 31032025.pdf | 16 Jun 2025 |
| Form 2File: 9 ENGINEER CERTIFICATE NEXUS ENTERPRISES WING A DATE MARCH25.pdf | 16 Jun 2025 |
| Form 3File: 9C A CERTIFICATE NEXUS ENTERPRISES WING A DATE 31032025.pdf | 16 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 8DISCLOUSURE OF SOLD 01012025 TO 31032025 Q4.pdf | 16 Jun 2025 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A (on Promoter letter head).pdf | 1 May 2025 |
| Other - TechnicalFile: Certifcate of Work of updation details_Nexus Kinaara A.pdf | 1 May 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B (on Bank letter head).pdf | 1 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9) C A CERTIFICATE NEXUS ENTERPRISES WING A DATE updated _compressed.pdf | 25 Apr 2025 |
| Building plan approvalFile: Page ( 1).pdf | 24 Apr 2025 |
| Building plan approvalFile: Page (2).pdf | 24 Apr 2025 |
| Building plan approvalFile: Page (3).pdf | 24 Apr 2025 |
| Building plan approvalFile: Page (4).pdf | 24 Apr 2025 |
| Building plan approvalFile: Page (5).pdf | 24 Apr 2025 |
| Building plan approvalFile: Page (6).pdf | 24 Apr 2025 |
| Building plan approvalFile: Page (7).pdf | 24 Apr 2025 |
| Building plan approvalFile: Page (8).pdf | 24 Apr 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 178 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Nexus Kinaara A on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Chikhali13,700+ in Pune
Filed coordinates, straight-line distance. 165 registered projects within 2 km.
Aishwaryam Anand
Sai Essen Developers
AISHWARYAM HAMARA ABHIMAAN
SAI ESSEN DEVELOPERS
AISHWARYAM HAMARA GAURAV
SAI ESSEN DEVELOPERS
VAASTU DREAMS III
SAI ESSEN 7 AND 8 LLP
AISHWARYAM COURTYARD GOLD
SAI ESSEN PROPERTIES
GANESH PARADISE PHASE 2
EKDANTA NEST LLP
Builder: Nexus Enterprises
Nexus Enterprises has 3 registrations on MahaRERA, including Nexus Kinaara B C and Nexus Kinaara D. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Nexus Kinaara A is delayed beyond 30 Apr 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Nexus Kinaara A?
The registered promoter entity is Nexus Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Nexus Kinaara A?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Nexus Kinaara A?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Nexus Kinaara A?
The professionals named in the filing: Architect: Dream Space Architect; Engineer: Ajinkya A Lahigude; Engineer: Dipali D Kashid; Engineer: Nexus Enterprises; Chartered Accountant: CA Dhiraj Manoj Baldota Chartered Accountant; Chartered Accountant: Shubham S Bora. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Nexus Kinaara A?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback