Home / Browse projects / Thane, Maharashtra / NEWA BHAKTI PARK B WING
NEWA BHAKTI PARK B WING
By NEWA TECHNOCITY (I) PRIVATE LIMITED
RG-MH-44032 · RERA P51700051141 · Last updated on MahaRERA portal: 18 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NEWA BHAKTI PARK B WING is a Residential / Group Housing project by NEWA TECHNOCITY (I) PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700051141 on 30 May 2023. Possession is promised by 31 Dec 2027. 93 of the 108 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameNEWA BHAKTI PARK B WING
- TypeResidential / Group Housing
- Location
- AIROLI KNOWLEDGE PARK
- AIROLI
- Navi Mumbai (M Corp.)
- Thane
- 400708
- Pincode400708
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700051141
- ReraGenie IDRG-MH-44032
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on30 May 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed84 files
Current status
Figures as on 18 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NEWA BHAKTI PARK B WING | NA | 30 | 27 | 108 | 0 | 108 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 96%.
NEWA BHAKTI PARK B WING: 79% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 96% |
| Sanitary Fittings within the flats / premises | 96% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 94% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 92% |
Progress on shared amenities15
As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 75% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 95% |
| Street Lighting | Yes | 90% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 95% |
| Solid Waste Management And Disposal | Yes | 90% |
| Water conservation /Rain water harvesting | Yes | 75% |
| Energy managemcnt | Yes | 80% |
| Fire protection and fire safety requirements | Yes | 85% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed195
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| NEWA BHAKTI PARK B WING | NA | Rs 67.66 cr | Rs 59.56 cr |
| - | NA | Rs 24.76 cr | Rs 19.29 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PIYUSH M VAISHNAV |
| Engineer | PRAVIN T GALA |
| Chartered Accountant | KRISHAN KUMAR SINGH |
| Partner | Role in project |
|---|---|
| NEWA TECHNOCITY (I) PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Feb 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Apr 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Mar 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed84
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FormNo1.pdf | 18 Apr 2026 |
| Withdrawal Update Form 1File: FormNo1.pdf | 18 Apr 2026 |
| Withdrawal Update Form 2File: FormNo2.pdf | 18 Apr 2026 |
| Withdrawal Update Form 2File: FormNo2.pdf | 18 Apr 2026 |
| Withdrawal Update Form 3File: FormNo3.pdf | 18 Apr 2026 |
| Withdrawal Update Form 3File: FormNo3.pdf | 18 Apr 2026 |
| Withdrawal Update Form 1File: FormNo1.pdf | 20 Oct 2025 |
| Withdrawal Update Form 2File: FormNo2.pdf | 20 Oct 2025 |
| Withdrawal Update Form 3File: FormNo3.pdf | 20 Oct 2025 |
| Withdrawal Update Form 1File: FORM 1.pdf | 5 Sep 2025 |
| Withdrawal Update Form 1File: FORM 1.pdf | 5 Sep 2025 |
| Withdrawal Update Form 2File: FORM 2.pdf | 5 Sep 2025 |
| Withdrawal Update Form 2File: FORM 2.pdf | 5 Sep 2025 |
| Withdrawal Update Form 3File: FORM 3.pdf | 5 Sep 2025 |
| Withdrawal Update Form 3File: FORM 3.pdf | 5 Sep 2025 |
| Details of encumbrances concerned to FinanceFile: 2b Encumbrance to Finance.pdf | 16 May 2025 |
| Details of encumbrances concerned to LegalFile: 2b Encumbrance to Finance.pdf | 16 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1.pdf | 12 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3.pdf | 12 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2.pdf | 12 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 122024.pdf | 25 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 022025.pdf | 25 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 122024.pdf | 25 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 022025.pdf | 25 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 122024.pdf | 25 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 022025.pdf | 25 Mar 2025 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Annexure A - Declaration-cum-Undertaking.pdf | 25 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5_ARSA.pdf | 25 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 24 Dec 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Notarized Ann A.pdf | 24 Dec 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Notarized Ann A with RECO.pdf | 24 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5_ARSA.pdf | 24 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form No 1.pdf | 5 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3_compressed.pdf | 5 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 2.pdf | 5 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY_compressed.pdf | 5 Dec 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: ANNEXURE - A ( DECLARATION CUM ANNEXURE)_compressed.pdf | 5 Dec 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A_compressed.pdf | 5 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf | 5 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A_compressed.pdf | 5 Dec 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B.pdf | 5 Dec 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: DECLARATION.pdf | 5 Dec 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: CA CERTIFICATE.pdf | 5 Dec 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration ANNEXURE AB.pdf | 14 Oct 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B.pdf | 14 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM NO 1.pdf | 17 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM NO 2.pdf | 17 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM NO 3.pdf | 17 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM NO 1.pdf | 4 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM NO 2.pdf | 4 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM NO 3.pdf | 4 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM NO 1.pdf | 13 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM NO 2.pdf | 13 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM NO 3.pdf | 13 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1 FORM NO 1.pdf | 10 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM NO 1.pdf | 10 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1 FORM NO 2.pdf | 10 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM NO 2.pdf | 10 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3_compressed.pdf | 10 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 16 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 16 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM_3.pdf | 16 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: 2b No Encumbrance to Legal Finance.pdf | 18 May 2023 |
| Details of encumbrances concerned to LegalFile: 2b No Encumbrance to Legal Finance.pdf | 18 May 2023 |
| CERSAI detailsFile: CERSAI Report NEWA - 200050829126.pdf | 18 May 2023 |
| CERSAI detailsFile: 2b No Encumbrance to Legal Finance_v1.pdf | 18 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B WING RERA CA CERTIFICATE_Accepted.pdf | 18 May 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report of Allotment Letter_V3.pdf | 4 May 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report on Agreement for sale_V3_compressed.pdf | 4 May 2023 |
| Layout approvalFile: Pages from IT06_Approved Plans(17-21 Nos)_C67087_compressed.pdf | 26 Apr 2023 |
| Copy of Layout Approval (in case of layout)File: Pages from IT06_Approved Plans(17-21 Nos)_C67087_compressed.pdf | 26 Apr 2023 |
| Proforma of Agreement for saleFile: Newa Technocity Agr for Sale Residential Bldg Wing B_Provisional_V5.pdf | 26 Apr 2023 |
| Proforma of Allotment letterFile: Allotment Letter_V2.pdf | 17 Apr 2023 |
| Building plan approvalFile: IT06_Approved Plans(17-20 Nos)_C67087_compressed.pdf | 18 Mar 2023 |
| Details of encumbrances concerned to FinanceFile: 1b No Encumbrance to legal.pdf | 18 Mar 2023 |
| Details of encumbrances concerned to LegalFile: 1b No Encumbrance to legal.pdf | 18 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IT06_Approved Plans(17-20 Nos)_C67087_compressed.pdf | 18 Mar 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A (Declaration about separate bank account for real estate projects).pdf | 18 Mar 2023 |
| Copy of the legal title reportFile: Legal Title Report_compressed.pdf | 21 Feb 2023 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate (Formate-D).pdf | 21 Feb 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| NEWA BHAKTI PARK A WING PHASE 1P51700006954 | Airoli, Thane | Aug 2017 | Completed | Mar 2023Registered original: Sep 2021 | Aug 2022 |
| NEWA BHAKTI KNOWLEDGE CITY COMMERCIAL BUILDING PHASE 1P51700010310 | Navi Mumbai (M Corp.), Thane | Aug 2017 | Completed | Mar 2023Registered original: Sep 2021 | Aug 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 84 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NEWA BHAKTI PARK B WING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near AIROLI7,600+ in Thane
Filed coordinates, straight-line distance. 42 registered projects within 2 km.
NIFT City - BKC II Building A
DELTA VENUS INFRA LLP
NEWA BUSINESS PARK II
NEWA REALITY INFRASTRUCTURE
Maplewood Phase III
BKS GALAXY REALTORS LLP
CAPITAL EDGE
JINDAL TODAY INFRA LLP
Airoli Co op housing soc Ltd.
Jayant Shashikant Parikh
ALTUS 24
JINDAL TODAY INFRA LLP
See every Thane project, with the district possession charts
Builder: NEWA TECHNOCITY (I) PRIVATE LIMITED
NEWA TECHNOCITY (I) PRIVATE LIMITED has 3 registrations on MahaRERA, including NEWA BHAKTI PARK A WING PHASE 1 and NEWA BHAKTI KNOWLEDGE CITY COMMERCIAL BUILDING PHASE 1. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if NEWA BHAKTI PARK B WING is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NEWA BHAKTI PARK B WING?
The registered promoter entity is NEWA TECHNOCITY (I) PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NEWA BHAKTI PARK B WING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NEWA BHAKTI PARK B WING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NEWA BHAKTI PARK B WING?
The professionals named in the filing: Architect: PIYUSH M VAISHNAV; Engineer: PRAVIN T GALA; Chartered Accountant: KRISHAN KUMAR SINGH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NEWA BHAKTI PARK B WING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback