Home / Browse projects / Thane, Maharashtra / Maplewood Phase III

Registered Litigation declared Others project

Maplewood Phase III

By BKS GALAXY REALTORS LLP

RG-MH-31997 · RERA P51700080212 · Last updated on MahaRERA portal: 11 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 6 cases
  • Rs 10.00 crore secured on the land, in favour of Axis Finance Limited

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
312 of 524Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

Maplewood Phase III is a Others project by BKS GALAXY REALTORS LLP in Thane, Maharashtra, registered with MahaRERA as P51700080212 on 7 May 2025. Possession is promised by 31 Dec 2030. 212 of the 524 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.

At a glance

Project

  • NameMaplewood Phase III
  • TypeOthers
  • Location
    • Dighe
    • Navi Mumbai (M Corp.)
    • Thane
    • 400708
  • Pincode400708
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700080212
  • ReraGenie IDRG-MH-31997

Builder

  • NameBKS GALAXY REALTORS LLP
  • Entity typeOthers

Key dates

this monthRegisteredMay 2025PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 May 2025
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings2 building records
  • Documents filed95 files

Current status

40%212 of 524 units booked
2.5%Work done, per cost certificate

Figures as on 11 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building A Wing A1 and Wing A2NA44333160316
Building BNA443419117208

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 11 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

Building A Wing A1 and Wing A20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed639

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots639
Closed/Covered639
BuildingClosed/CoveredTotal
Building A Wing A1 and Wing A2441441
Building B198198

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area8,464 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAxis Finance Limited
Secured amountRs 10.00 crore
CERSAI search filedYes
Declared on18 Nov 2025

Approvals and building plan

Sanctioning authorityNavi Mumbai Municipal Corporation
Permissible FSI47310.66
Proposed, not sanctioned47,311 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 5 AND 6, PERSIPOLIS, PLOT NO 74, SECTOR 17, VASHI, NAVI MUMBAI PIN 400703
Estimated costRs 284.32 cr
Cost incurredRs 7.00 cr
Work done2.46%
BuildingWingEstimatedIncurred
Building A Wing A1 and Wing A2NARs 163.19 crRs 50.00 lakh
Building BNARs 80.63 crRs 50.00 lakh
-NARs 40.50 crRs 6.00 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectThe Firm
EngineerMr. Santosh Ramshiromani Singh
EngineerVaibhav Shinde
Chartered AccountantM/s. Pratiksha Tulshyan & Associates
Chartered AccountantUtsav Shah & Associates
PartnerRole in project
BKS GALAXY REALTORS LLP-

Litigation declared6

CaseCourtStatus
87/2024Belapur CourtClosed
999/2018Bombay High CourtClosed
23492/2024Bombay High CourtClosed
72/2024Bombay High CourtClosed
1727/1984Bombay High CourtClosed
14962/2024Bombay High CourtClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Maplewoods Phase III.pdf11 Jul 2026
Withdrawal Update Form 2File: Form 2_Maplewoods Phase 3.pdf11 Jul 2026
Withdrawal Update Form 3File: Form 3-Maplewoods-Phase 3.pdf11 Jul 2026
Form 1File: Form 1 - Maplewood Phase III as on Mar 2026.pdf10 Apr 2026
Form 2File: Form 2 - Maplewood Phase III as on Mar 2026.pdf10 Apr 2026
Form 3File: Form 3 - Maplewood Phase III as on Mar 2026 (New).pdf10 Apr 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Maplewood Phase III as on Mar 2026.pdf10 Apr 2026
Form 1File: Form 1 - Maplewood Phase III as on Dec 2025.pdf21 Jan 2026
Form 2File: Form 2- Maplewood Phase III as on Dec 2025.pdf21 Jan 2026
Form 3File: Form 3- Maplewood Phase III as on Dec 2025.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Maplewood Phase III as on Dec 2025.pdf21 Jan 2026
Form 1File: Form 1 - Maplewoods Phase 3 as on Sep 2025.pdf1 Nov 2025
Form 2File: Form 2 - Maplewoods Phase 3 as on Sep 2025.pdf1 Nov 2025
Form 3File: Form 3 - Maplewoods Phase 3 as on Sep 2025.pdf1 Nov 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Maplewoods Phase 3 as on Sep 2025.pdf1 Nov 2025
Form 1File: Form 1- Maplewood Phase III as on June 2025.pdf16 Aug 2025
Form 2File: Form 2- Maplewood Phase III as on June 2025.pdf16 Aug 2025
Form 3File: Form 3- Maplewood Phase III as on June 2025.pdf16 Aug 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Maplewood Phase III as on June 2025.pdf16 Aug 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER Litigations (3).pdf5 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC Verification Mail - Maplewood Phase III.pdf5 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: 1st Amended CC Revalidation.pdf5 Apr 2025
Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER Litigations (3).pdf5 Apr 2025
Layout approvalFile: MYSCAN_20230412_0001_11zon.pdf13 Nov 2024
Building plan approvalFile: MYSCAN_20230412_0001_11zon.pdf13 Nov 2024
Building plan approvalFile: MYSCAN_20230412_0002_11zon (1).pdf13 Nov 2024
Building plan approvalFile: MYSCAN_20230412_0003_11zon.pdf13 Nov 2024
Building plan approvalFile: MYSCAN_20230412_0004.PDF13 Nov 2024
Building plan approvalFile: MYSCAN_20230412_0005.PDF13 Nov 2024
Building plan approvalFile: MYSCAN_20230412_0006.PDF13 Nov 2024
Building plan approvalFile: MYSCAN_20230412_0007.PDF13 Nov 2024
Building plan approvalFile: MYSCAN_20230412_0008_11zon.pdf13 Nov 2024
Building plan approvalFile: MYSCAN_20230412_0009.PDF13 Nov 2024
Building plan approvalFile: MYSCAN_20230412_0010.PDF13 Nov 2024
Building plan approvalFile: MYSCAN_20230413_0011.PDF13 Nov 2024
Building plan approvalFile: MYSCAN_20230413_0012_11zon.pdf13 Nov 2024
Building plan approvalFile: MYSCAN_20230413_0013_11zon.pdf13 Nov 2024
Building plan approvalFile: MYSCAN_20230413_0014_11zon.pdf13 Nov 2024
Building plan approvalFile: MYSCAN_20230413_0015_11zon.pdf13 Nov 2024
Building plan approvalFile: MYSCAN_20230413_0016_11zon (1).pdf13 Nov 2024
Building plan approvalFile: MYSCAN_20230413_0017_11zon.pdf13 Nov 2024
Building plan approvalFile: MYSCAN_20230413_0018_11zon.pdf13 Nov 2024
Building plan approvalFile: MYSCAN_20230413_0019_11zon.pdf13 Nov 2024
Building plan approvalFile: MYSCAN_20230413_0020_11zon.pdf13 Nov 2024
Building plan approvalFile: MYSCAN_20230413_0021_11zon.pdf13 Nov 2024
PAN CardFile: PAN- Password 12042023.pdf13 Nov 2024
Copy of the legal title reportFile: Final Title Report- Maplewood Phase III.pdf13 Nov 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Letter-Finance.pdf13 Nov 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Legal Phase III (1).pdf13 Nov 2024
Copy of Layout Approval (in case of layout)File: MYSCAN_20230412_0001_11zon.pdf13 Nov 2024
Proforma of Allotment letterFile: AL_Maplewood Phase III_ BKS Galaxy Realtors LLP_05042025.pdf13 Nov 2024
Declaration in FORM BFile: Form B-Affidavit cum Declaration.pdf13 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (12)_11zon.pdf13 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (11)_11zon.pdf13 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (13)_11zon.pdf13 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: cc- maplewood.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230413_0014_11zon.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230413_0021_11zon.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230413_0020_11zon.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230413_0019_11zon.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230413_0018_11zon.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230413_0017_11zon.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230413_0016_11zon (1).pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230413_0015_11zon.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230413_0013_11zon.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230413_0012_11zon.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230412_0010.PDF13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230412_0009.PDF13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230412_0008_11zon.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230412_0007.PDF13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230412_0006.PDF13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230412_0005.PDF13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230412_0004.PDF13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230412_0003_11zon.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230412_0002_11zon (1).pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230412_0001_11zon.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230413_0011.PDF13 Nov 2024
Other - LegalFile: Sale Deed 39 to 75.pdf13 Nov 2024
Other - LegalFile: Sale Deed 1 to 38.pdf13 Nov 2024
Other - LegalFile: Sale deed 1 to 37.pdf13 Nov 2024

How this compares with Thane

40%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Maplewood Phase III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dighe7,600+ in Thane

2 kmMaplewood Phase IIICompleted 17Lapsed / revoked 5Other 15Dot size: filed unitsN

Filed coordinates, straight-line distance. 37 registered projects within 2 km.

Builder: BKS GALAXY REALTORS LLP

BKS GALAXY REALTORS LLP has 1 registration on MahaRERA, including Maplewood Phase III. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Maplewood Phase III is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Maplewood Phase III?

The registered promoter entity is BKS GALAXY REALTORS LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Maplewood Phase III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Maplewood Phase III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Maplewood Phase III?

The professionals named in the filing: Architect: The Firm; Engineer: Mr. Santosh Ramshiromani Singh; Engineer: Vaibhav Shinde; Chartered Accountant: M/s. Pratiksha Tulshyan & Associates; Chartered Accountant: Utsav Shah & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Maplewood Phase III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Maplewood Phase III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Maplewood Phase III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.