Home / Browse projects / Palghar, Maharashtra / NEW MUKTI CO-OPERATIVE HOUSING SOCIETY LIMITED
NEW MUKTI CO-OPERATIVE HOUSING SOCIETY LIMITED
By SAI SIDDHI BUILDERS AND DEVELOPERS
RG-MH-35262 · RERA P99000048123 · Last updated on MahaRERA portal: 27 Dec 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NEW MUKTI CO-OPERATIVE HOUSING SOCIETY LIMITED is a Others project by SAI SIDDHI BUILDERS AND DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000048123 on 12 Dec 2022. The registration is recorded completed; possession was promised by 31 Dec 2025.
At a glance
Project
- NameNEW MUKTI CO-OPERATIVE HOUSING SOCIETY LIMITED
- TypeOthers
- Location
- PANCHAL NAGAR
- NALLASOPARA WEST
- Vasai
- Palghar
- 401203
- Pincode401203
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000048123
- ReraGenie IDRG-MH-35262
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on12 Dec 2022
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed58 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NEW MUKTI CO-OPERATIVE HOUSING SOCIETY LIMITED | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
NEW MUKTI CO-OPERATIVE HOUSING SOCIETY LIMITED: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 27 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed30
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SAI SIDDHI BUILDERS AND DEVELOPERS | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VIJAY GURAV & ASSOCIATES |
| Engineer | DIPJIT ASSOCIATES |
| Chartered Accountant | MILIND MEHTA & ASSOCIATES |
| Chartered Accountant | A K Parmar & Co |
| Chartered Accountant | D N Fargoes & Co |
| Partner | Role in project |
|---|---|
| SAI SIDDHI BUILDERS AND DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Sep 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Aug 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Sep 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 28 Nov 2024
Documents filed58
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2023.pdf | 27 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2024.pdf | 27 Dec 2024 |
| Status of ConveyanceFile: Conveyance Deed of New Mukti CHSL to Upload_11zon.pdf | 18 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 New Mukti 2024.pdf | 18 Dec 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration.pdf | 9 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Nov 24.pdf | 3 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 3 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Nov 24.pdf | 3 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arc certificate.pdf | 29 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 24 Compressed.pdf | 28 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept 24.pdf | 28 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC _ New Mukti.pdf | 28 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dec 23.pdf | 29 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Dec 23 Eng Certi.pdf | 29 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 - Dec 23 - Sai Siddhi_b.pdf | 29 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sept 2023.pdf | 30 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sept 2023.pdf | 30 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Sept 23 to upload_compressed.pdf | 30 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 18-08-2023.pdf | 11 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE 18-08-2023.pdf | 11 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2023.pdf | 11 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 11 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - new mukti Architect - Mrach 2023.pdf | 2 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - new mukti Engineers - March 2023.pdf | 2 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Prior Period.pdf | 2 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Prior Period.pdf | 2 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Prior Period.pdf | 2 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 2 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 2 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf | 2 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Prior Period.pdf | 2 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Prior Period.pdf | 2 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Prior Period.pdf | 2 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Prior Period.pdf | 2 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Prior Period.pdf | 2 Jun 2023 |
| Proforma of Agreement for saleFile: SALE AGREEMENT.pdf | 6 Dec 2022 |
| Deviation Report with respect to model copy of AgreementFile: NO DEVIATION REPORT - AGREEMENT FOR SALE.pdf | 3 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 4 Nov 2022 |
| CERSAI detailsFile: cersai.pdf | 10 Oct 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: cersai.pdf | 1 Oct 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 6.pdf | 28 Sep 2022 |
| Declaration in FORM BFile: FORM B_2 _merged.pdf | 27 Sep 2022 |
| Proforma of Allotment letterFile: PROFORMA ALLOTMENT LETTER.pdf | 24 Sep 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DECLARATION.pdf | 24 Sep 2022 |
| Details of encumbrances concerned to LegalFile: ENCUMBERENCE CERTIFICATE.pdf | 7 Sep 2022 |
| Building plan approvalFile: PLAN 1.pdf | 6 Sep 2022 |
| Copy of the legal title reportFile: LEGAL TITAL REPORT.pdf | 6 Sep 2022 |
| Details of encumbrances concerned to FinanceFile: ENCUMBERENCE CERTIFICATE.pdf | 6 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN 1.pdf | 6 Sep 2022 |
| Declaration about Commencement CertificateFile: DECLATION ABOUT COMMENCEMENT CERTIFICATE.pdf | 6 Sep 2022 |
| Deviation Report with respect to Allotment letterFile: DEVIATION REPORT - ALLOTMENT LETTER.pdf | 6 Sep 2022 |
| Layout approvalFile: PLAN 1.pdf | 30 Aug 2022 |
| Layout approvalFile: PLAN 2.pdf | 30 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: PLAN 1.pdf | 30 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: PLAN 2.pdf | 30 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 30 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATES.pdf | 30 Aug 2022 |
| PAN CardFile: COMPANY AN CARD.pdf | 29 Aug 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 58 filed documents as one ZIP, foldered, with a manifest
Keep NEW MUKTI CO-OPERATIVE HOUSING SOCIETY LIMIT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NALLASOPARA WEST3,200+ in Palghar
Filed coordinates, straight-line distance. 316 registered projects within 2 km.
Sheetal Yash
DGS BUILDERS AND DEVELOPERS
DEEP SKYRISE
DEEP REALCON LLP
VIMAL CLASSIC
OM VIMAL DEVELOPERS
DHANANJAY HILL VIEW
DHANLAXMI DEVELOPERS
NAKSHATRA AURIS
RAJLAXMI JSB REALTY LLP
COMFORT HERITAGE
SAI RYDAM REAL ESTATE DEVELOPERS LLP
See every Palghar project, with the district possession charts
Builder: SAI SIDDHI BUILDERS AND DEVELOPERS
SAI SIDDHI BUILDERS AND DEVELOPERS has 3 registrations on MahaRERA, including NEW MUKTI CO-OPERATIVE HOUSING SOCIETY LIMITED and Amit Palace CHSL. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if NEW MUKTI CO-OPERATIVE HOUSING SOCIETY LIMITED is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NEW MUKTI CO-OPERATIVE HOUSING SOCIETY LIMITED?
The registered promoter entity is SAI SIDDHI BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NEW MUKTI CO-OPERATIVE HOUSING SOCIETY LIMITED?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NEW MUKTI CO-OPERATIVE HOUSING SOCIETY LIMITED?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NEW MUKTI CO-OPERATIVE HOUSING SOCIETY LIMITED?
The professionals named in the filing: Architect: VIJAY GURAV & ASSOCIATES; Engineer: DIPJIT ASSOCIATES; Chartered Accountant: MILIND MEHTA & ASSOCIATES; Chartered Accountant: A K Parmar & Co; Chartered Accountant: D N Fargoes & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NEW MUKTI CO-OPERATIVE HOUSING SOCIETY LIMITED?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback