Home / Browse projects / Thane, Maharashtra / NEW MODEL TOWN COMPLEX

Registration lapsed No litigation declared Residential / Group Housing project

NEW MODEL TOWN COMPLEX

By QAVI CONSTRUCTION PVT. LTD.

RG-MH-39868 · RERA P51700015557 · Last updated on MahaRERA portal: 28 Feb 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 45 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jan 2023Possession promised45 months past this date
40 of 55Construction stages doneacross 5 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 51 documents Report an error

NEW MODEL TOWN COMPLEX is a Residential / Group Housing project by QAVI CONSTRUCTION PVT. LTD. in Thane, Maharashtra, registered with MahaRERA as P51700015557 on 8 Mar 2018. Possession was promised by 16 Jan 2023 and is now 45 months past that date.

At a glance

Project

  • NameNEW MODEL TOWN COMPLEX
  • TypeResidential / Group Housing
  • Location
    • GANGA DEVASTHAN RAOD
    • NEAR ARCHANA ENG. MED. SCHOOL
    • Shahapur (CT)
    • Shahapur
    • Thane
    • 421601
  • Pincode421601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700015557
  • ReraGenie IDRG-MH-39868

Builder

  • NameQAVI CONSTRUCTION PVT. LTD.
  • Entity typeCompany
  • DirectorsMOHAMMED HAMSHEED MOHAMMED SIDDIQUE KHAN, LAIQUE AHMED ABDUL QAVI KHAN
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

45 months past promisethis monthRegisteredMar 2018PromisedJan 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on8 Mar 2018
  • Promised completion16 Jan 2023
  • Revised completionNone
  • Buildings5 building records
  • Documents filed51 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A TYPE UNIT 02NA60000
B TYPENA60000
C TYPENA60000
D TYPENA50000
A TYPE UNIT 01NA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 28 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

40 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.

A TYPE UNIT 0291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B TYPE91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C TYPE91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D TYPE0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A TYPE UNIT 0191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 28 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Closed/Covered26
BuildingClosed/CoveredTotal
A TYPE UNIT 0277
B TYPE66
C TYPE88
D TYPE44
A TYPE UNIT 0111

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,311 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
M/s. QAVI CONSTRUCTIONMumbai CityMumbai City

Approvals and building plan

Permissible FSI6813.06
Proposed, not sanctioned6,813 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSN 1 2 Ayesha Tower PN 220 8 SV Rd Jogeshwari West Mumbai Maharashtra 400102

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCHILOGIC CONSULTANTS
EngineerSR CONSULTANTS
PartnerRole in project
QAVI CONSTRUCTION PVT. LTD.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Mar 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Mar 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Mar 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Apr 2023

Documents filed51

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrances concerned to FinanceFile: 1 Details of encumbrances (1).pdf28 Feb 2024
Details of encumbrances concerned to LegalFile: 1 Details of encumbrances (1).pdf28 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: 2023-10-16_065469.pdf26 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: 2023-10-16_064995.pdf26 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 30-09-2023.pdf26 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2019-20.pdf19 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2020-21.pdf19 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-22.pdf19 Aug 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf19 Aug 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC C TYPE.pdf12 Apr 2023
Status of Formation of Legal EntityFile: B TYPE SOCIETY.pdf12 Apr 2023
Status of Formation of Legal EntityFile: A TYPE.pdf12 Apr 2023
Other - TechnicalFile: Maharera.pdf12 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_compressed.pdf20 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_compressed.pdf20 Feb 2023
Certificates of CA (Form 3)File: FORM 3_compressed.pdf20 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5 2018.pdf20 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM5 2018-19.pdf20 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM5 2019-20.pdf20 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM5 2020-21.pdf20 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 52021-22_compressed.pdf20 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC 2_compressed.pdf20 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2.pdf17 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5.pdf17 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A TYPE .pdf26 Jun 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: B TYPE .pdf26 Jun 2021
Layout approvalFile: Full page photo.pdf3 Mar 2018
Building plan approvalFile: A TYPE.pdf3 Mar 2018
Building plan approvalFile: B TYPE.pdf3 Mar 2018
Building plan approvalFile: C TPE.pdf3 Mar 2018
Building plan approvalFile: D TYPE.pdf3 Mar 2018
PAN CardFile: PAN CARD.pdf3 Mar 2018
PAN CardFile: LAIQUE PAN.pdf3 Mar 2018
PAN CardFile: SIDDHIQUE PAN.pdf3 Mar 2018
Copy of the legal title reportFile: final Search.pdf3 Mar 2018
Copy of the legal title reportFile: final title certi.pdf3 Mar 2018
Details of encumbrancesFile: ENCUMBRANCE NEW.pdf3 Mar 2018
Copy of Layout Approval (in case of layout)File: Full page photo.pdf3 Mar 2018
Building Plan Approval (IOD)File: A TYPE.pdf3 Mar 2018
Building Plan Approval (IOD)File: B TYPE.pdf3 Mar 2018
Building Plan Approval (IOD)File: C TPE.pdf3 Mar 2018
Building Plan Approval (IOD)File: D TYPE.pdf3 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf3 Mar 2018
Declaration in FORM BFile: FINAL FORM B.pdf3 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FINAL ARCH.pdf3 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FINAL ENG.pdf3 Mar 2018
Certificates of CA (Form 3)File: Qavi Form-3 upto 30-06-2017.pdf3 Mar 2018
Proforma of Allotment letterFile: final draft of agreement.pdf3 Mar 2018
Proforma of Allotment letterFile: Allotment Letter Format.pdf3 Mar 2018
Status of Formation of Legal EntityFile: LAND DOCUMEN FIN.pdf3 Mar 2018
Status of ConveyanceFile: comany agreement final.pdf3 Mar 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
MODEL TOWN COMPLEXGANGA DEVASTHAN ROAD SHAHAPUR TAL SHAHAPUR DIST THANE 421601120CompletedMar 2013Dec 2012

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NEW MODEL TOWN COMPLEX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR ARCHANA ENG. MED. SCHOOL7,600+ in Thane

2 kmNEW MODEL TOWN COMPLEXCompleted 15Lapsed / revoked 18Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 55 registered projects within 2 km.

Builder: QAVI CONSTRUCTION PVT. LTD.

QAVI CONSTRUCTION PVT. LTD. has 2 registrations on MahaRERA, including NEW MODEL TOWN COMPLEX and MODEL TOWN. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that NEW MODEL TOWN COMPLEX shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if NEW MODEL TOWN COMPLEX is delayed beyond 16 Jan 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEW MODEL TOWN COMPLEX?

The registered promoter entity is QAVI CONSTRUCTION PVT. LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEW MODEL TOWN COMPLEX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NEW MODEL TOWN COMPLEX?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NEW MODEL TOWN COMPLEX?

The professionals named in the filing: Architect: ARCHILOGIC CONSULTANTS; Engineer: SR CONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEW MODEL TOWN COMPLEX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEW MODEL TOWN COMPLEX. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEW MODEL TOWN COMPLEX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.