Red flags

  • Completion date moved by 83 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Nov 2026Possession promisedmoved 83 months from the original
0 of 11Construction stages donefurthest along: Excavation, 95%
28 of 43Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 37 documents Report an error

New Jagdamba is a Residential / Group Housing project by SiroyaFM Constructions Pvt Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008985 on 19 Aug 2017. Possession is promised by 30 Nov 2026. The completion date has moved by 83 months from the original filing. 15 of the 43 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameNew Jagdamba
  • TypeResidential / Group Housing
  • Location
    • Chakala
    • Andheri E
    • Andheri
    • Mumbai Suburban
    • 400093
  • Pincode400093
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800008985
  • ReraGenie IDRG-MH-25216

Builder

  • NameSiroyaFM Constructions Pvt Ltd
  • Entity typeCompany
  • Managing DirectorFatesh Kishanchand Mirchandani
  • Other registrations3 more →
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseDec 2019Revised toNov 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Aug 2017
  • Promised completion30 Nov 2026
  • Revised completionRevised to 30 Nov 2026 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed37 files

Current status

35%15 of 43 units booked

Figures as on 16 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
New JagdambaNA131143043

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 95%.

New Jagdamba: 48% average across the applicable activities

ActivityProgress
Excavation95%
Basement (if any)95%
Podiums (if any)0%
Plinth95%
Stilt Floor40%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes70%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed34

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots34
Closed/Covered32
Open Space2

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,080 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Aug 2026
LandownerVillageDistrict
New Jagdamba CHSAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMunicipal Corporation of Greater Mumbai (MCGM)
Permissible FSI2841.19
Proposed, not sanctioned2,247 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShapoorji Pallonji Building, Dr ShirodkarMarg, Near KEM Hospital, Opp Bata Showroom, Mumbai - 400012

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAbhijit A Mehta
ArchitectTangent Design Studio
ArchitectABHIJIT MEHTA
EngineerCity Engineering Services
EngineerKISHOR VELANI
Chartered AccountantR. M. JADHAV & ASSOCIATES
Chartered AccountantDIMPLE JAIN & CO
PartnerRole in project
SiroyaFM Constructions Pvt Ltd-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800009593Dec 2019 → Dec 2021

Reason as filed by the promoterDue to the ongoing Covid Pandemic, it has been extremely difficult for us to coordinate various activities in terms of getting permissions from BMC, in organizing labour for the site, in getting materials such as oxygen cylinders required for fabrication purposes, in getting loans from banks,etc. Hence, we require revised timelines of 6 months to complete the project.

EXT51800005235Dec 2019 → Dec 2020

Reason as filed by the promoterThe project has been delayed due to multiple reasons as enumerated as below: i) Financial Difficulty due to bad market conditions ii)Non availability of Directors due to Judicial Reasons iii)Change in DCR Policy wherein we have been advised to make modifications in planning as per the new DCR 2034

EA20082622265Dec 2019 → Nov 2026

Reason as filed by the promoterPOST FACTO EXTENSION

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 May 2023

Documents filed37

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM 2A.pdf16 Sep 2026
Form 5 (FY 2024-2025)File: FORM 5.pdf16 Sep 2026
Declaration about Commencement CertificateFile: Declaration Commencement Certificate.pdf25 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf25 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf25 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf25 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf25 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold-booked inventory.pdf25 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 18-19.pdf25 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 CA Annual report-SFM-4.pdf25 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 CA Annual report-SFM 21-22.pdf25 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 CA Annual report-SFM 20-21.pdf25 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 CA Annual report-SFM 22-23.pdf25 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 CA Annual report-SFM 21-22.pdf25 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Jagdamba OC.pdf12 May 2023
Building plan approvalFile: Jagdamba IOD Plan Compressed.pdf3 Aug 2021
Building Plan Approval (IOD)File: Jagdamba IOD Plan Compressed.pdf3 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: 2282601_FurtherCC_signed.pdf3 Aug 2021
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate - Siroya FM.pdf3 Aug 2021
Disclosure of sold/ booked inventoryFile: New Jagdamba - Disclosure of Sold Booked Inventory.pdf3 Aug 2021
Annual Audit Report of Statutory CA (Form 5)File: New Jagdamba Form 5.pdf21 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Jagdamba Nov 17 update.pdf25 Dec 2017
Certificates of CA (Form 3)File: certificate form 3.pdf25 Dec 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate - New Jagdamba.pdf31 Jul 2017
Certificates of CA (Form 3)File: RERA CA Certificatecompressed.pdf31 Jul 2017
Declaration in FORM BFile: siroya fm Form B.pdf30 Jul 2017
Proforma of Allotment letterFile: RERA Allotment letter.pdf30 Jul 2017
Proforma of Allotment letterFile: RERA Draft Agreement.pdf30 Jul 2017
Layout approvalFile: Jagdamba Layout plan compressed.pdf28 Jul 2017
Building plan approvalFile: IOD Jagdamba.pdf28 Jul 2017
PAN CardFile: sfm pan card PDF.pdf28 Jul 2017
Copy of the legal title reportFile: Jagdamba Title Certificate.pdf28 Jul 2017
Details of encumbrancesFile: jagdamba declaration regarding encumbrances.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: Jagdamba Layout plan compressed.pdf28 Jul 2017
Building Plan Approval (IOD)File: IOD Jagdamba.pdf28 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC Jagdamba.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Jagdamba Architect Certificate.pdf28 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Shiv SadanGoregaon W Mumbai29CompletedOct 2010Oct 2010

How this compares with Mumbai Suburban

35%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 83 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep New Jagdamba on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri E6,700+ in Mumbai Suburban

2 kmNew JagdambaCompleted 144Lapsed / revoked 81Other 123Dot size: filed unitsN

Filed coordinates, straight-line distance. 348 registered projects within 2 km.

Builder: SiroyaFM Constructions Pvt Ltd

SiroyaFM Constructions Pvt Ltd has 4 registrations on MahaRERA, including Orchid and New Jagdamba. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if New Jagdamba is delayed beyond 30 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of New Jagdamba?

The registered promoter entity is SiroyaFM Constructions Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in New Jagdamba?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for New Jagdamba?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at New Jagdamba?

The professionals named in the filing: Architect: Abhijit A Mehta; Architect: Tangent Design Studio; Architect: ABHIJIT MEHTA; Engineer: City Engineering Services; Engineer: KISHOR VELANI; Chartered Accountant: R. M. JADHAV & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in New Jagdamba?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About New Jagdamba. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save New Jagdamba to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.