Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
6 of 15Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

NEPTUNE APARTMENT is a Others project by Dhuni Constructions Private Limited in Nagpur, Maharashtra, registered with MahaRERA as P50500055862 on 23 Apr 2024. Possession is promised by 31 Dec 2027. 9 of the 15 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameNEPTUNE APARTMENT
  • TypeOthers
  • Location
    • Plot No. 55
    • Nagpur
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • 440022
  • Pincode440022
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500055862
  • ReraGenie IDRG-MH-80853

Builder

  • NameDhuni Constructions Private Limited
  • Entity typeCompany

Key dates

this monthRegisteredApr 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Apr 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Current status

60%9 of 15 units booked
130.8%Work done, per cost certificate

Figures as on 28 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NEPTUNE APARTMENTNA5512315

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

NEPTUNE APARTMENT: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 28 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area688 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
Declared on21 Feb 2026
LandownerVillageDistrict
Kalinga Ramkrishna HiwarkarNagpur (M Corp.)Nagpur
Mukesh Ramkrishna HiwarkarNagpur (M Corp.)Nagpur
Ramkrishna Pundlikrao HiwarkarNagpur (M Corp.)Nagpur
Mandakini Ramkrishna HiwarkarNagpur (M Corp.)Nagpur
Prerna Rajesh BagadeNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNagpur Improvement Trust
Permissible FSI1670.06
Proposed, not sanctioned1,670 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch32, Kaivalya, Ramkrishna Nagar, Khamla, Telecom Nagar, Main Road, Nagpur, PIN - 440025
Estimated costRs 11.35 cr
Cost incurredRs 14.85 cr
Work done130.85%
BuildingWingEstimatedIncurred
NEPTUNE APARTMENTNARs 5.67 crRs 7.43 cr
-NARs 5.67 crRs 7.43 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSwapnil Gode
EngineerSwapnil Gode
EngineerShri Sai Infra Venture
Chartered AccountantRishi Lashkare Lashkare
Chartered AccountantRavindra Lashkare
PartnerRole in project
Dhuni Constructions Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect Certificate.pdf28 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf28 Feb 2026
Withdrawal Update Form 3File: Form 3 CA Certificate Dec 2025.pdf28 Feb 2026
Withdrawal Update Form 1File: Neptune - Form 1 - September 2025.pdf20 Dec 2025
Withdrawal Update Form 2File: Neptune - Form 2 - September 2025.pdf20 Dec 2025
Withdrawal Update Form 3File: Neptune - Form 3 - September 2025.pdf20 Dec 2025
Form 5 (FY 2024-2025)File: FORM 5 - 2024-25.pdf6 Nov 2025
Withdrawal Update Form 1File: Neptune Apartment - Form 1 - June 2025.pdf30 Sep 2025
Withdrawal Update Form 2File: Neptune Apartment - Form 2 - June 2025.pdf30 Sep 2025
Withdrawal Update Form 3File: Neptune Apartment - Form 3 - June 2025_compressed.pdf30 Sep 2025
Form 1File: FORM 1 - Arch Certificate - March 2025 NEPTUNE.pdf13 Jun 2025
Form 2File: FORM 2 - Engineer Certificate - March 2025 NEPTUNE.pdf13 Jun 2025
Form 3File: FORM 3 - CA Certificate - March 2025 NEPTUNE_compressed.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory March 2025 Neptune.pdf13 Jun 2025
Form 1File: Neptune - Form 1 - September 2024.pdf12 Jun 2025
Form 2File: Neptune - Form 2 - September 2024.pdf12 Jun 2025
Form 3File: Neptune - Form 3 - September 2024.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: Neptune - Disclosure - September 2024.pdf12 Jun 2025
Form 1File: Neptune - Form 1 - June 2024.pdf12 Jun 2025
Form 2File: Neptune - Form 2 - June 2024.pdf12 Jun 2025
Form 3File: Neptune - Form 3 - June 2024.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: Neptune - Disclosure - June 2024.pdf12 Jun 2025
Form 1File: Neptune - Form 1 - December 2024.pdf11 Jun 2025
Form 2File: Neptune - Form 2 - December 2024.pdf11 Jun 2025
Form 3File: Neptune - Form 3 - December 2024.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: Neptune - Disclosure - December 2024.pdf11 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Neptune - Form 1 - December 2024.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Neptune - Form 3 - December 2024_compressed.pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Neptune - Form 2 - December 2024.pdf22 Apr 2025
Disclosure of sold/ booked inventoryFile: Neptune - Disclosure - December 2024.pdf22 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Neptune - Form 1 - June 2024.pdf4 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Neptune - Form 1 - September 2024.pdf4 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Neptune - Form 3 - June 2024_compressed.pdf4 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Neptune - Form 3 - September 2024_compressed.pdf4 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Neptune - Form 2 - June 2024.pdf4 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Neptune - Form 2 - September 2024.pdf4 Dec 2024
Disclosure of sold/ booked inventoryFile: Neptune - Disclosure - June 2024.pdf4 Dec 2024
Disclosure of sold/ booked inventoryFile: Neptune - Disclosure - September 2024.pdf4 Dec 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate - Finance - D.pdf16 Apr 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate - Legal - D.pdf16 Apr 2024
Details of encumbrances concerned to LegalFile: Encumbrance Certificate - Finance - D.pdf16 Apr 2024
Details of encumbrances concerned to LegalFile: Encumbrance Certificate - Legal - D.pdf16 Apr 2024
CERSAI detailsFile: Self Declaration of CERSAI - D.pdf16 Apr 2024
CERSAI detailsFile: CERSAI NEW.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf16 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Bank Statement - D.pdf16 Apr 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate - Legal.pdf1 Apr 2024
Details of encumbrances concerned to LegalFile: Encumbrance Certificate - Legal.pdf1 Apr 2024
Layout approvalFile: Layout Plan.pdf30 Mar 2024
Building plan approvalFile: Sanction Map 1-2.pdf30 Mar 2024
Building plan approvalFile: Sanction Map 2-2.pdf30 Mar 2024
PAN CardFile: PAN.pdf30 Mar 2024
Copy of the legal title reportFile: Legal Title Report Neptune.pdf30 Mar 2024
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf30 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Map 1-2.pdf30 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Map 2-2.pdf30 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf30 Mar 2024
Declaration about Commencement CertificateFile: Declaration of CC.pdf30 Mar 2024
Declaration in FORM BFile: Form B - Ms Dhuni Constructions Pvt Ltd.pdf30 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations Swapnil Gode.pdf30 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations Amit Tarekar.pdf30 Mar 2024
Proforma of Agreement for saleFile: Drat Agreement to Sell.pdf30 Mar 2024
Proforma of Allotment letterFile: Allotment letter Neptune.pdf30 Mar 2024
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment Letter.pdf30 Mar 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to Model agreement.pdf30 Mar 2024
Other - TechnicalFile: 1 Other - Technical.pdf30 Mar 2024
Other - TechnicalFile: 2 Other - Technical.pdf30 Mar 2024

How this compares with Nagpur

60%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NEPTUNE APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nagpur2,800+ in Nagpur

2 kmNEPTUNE APARTMENTCompleted 42Lapsed / revoked 19Other 51Dot size: filed unitsN

Filed coordinates, straight-line distance. 112 registered projects within 2 km.

Builder: Dhuni Constructions Private Limited

Dhuni Constructions Private Limited has 1 registration on MahaRERA, including NEPTUNE APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if NEPTUNE APARTMENT is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEPTUNE APARTMENT?

The registered promoter entity is Dhuni Constructions Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEPTUNE APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NEPTUNE APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NEPTUNE APARTMENT?

The professionals named in the filing: Architect: Swapnil Gode; Engineer: Swapnil Gode; Engineer: Shri Sai Infra Venture; Chartered Accountant: Rishi Lashkare Lashkare; Chartered Accountant: Ravindra Lashkare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEPTUNE APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEPTUNE APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEPTUNE APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.