Home / Browse projects / Mumbai Suburban, Maharashtra / NEHRU NAGAR VISHWADHAM CHS LTD
NEHRU NAGAR VISHWADHAM CHS LTD
RG-MH-64982 · RERA P51800015420 · Last updated on MahaRERA portal: 4 Jul 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 2 complaints at MahaRERA
- Completion date moved by 84 months
- 5 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NEHRU NAGAR VISHWADHAM CHS LTD is a Residential / Group Housing project by APCON CONSTRUCTION COMPANY in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800015420 on 23 Feb 2018. Possession is promised by 30 Dec 2026. The completion date has moved by 84 months from the original filing. 2 complaints are on record with the regulator.
At a glance
Project
- NameNEHRU NAGAR VISHWADHAM CHS LTD
- TypeResidential / Group Housing
- Location
- NEHRU NAGAR
- MHADA COLONY
- Kurla
- Mumbai Suburban
- 400024
- Pincode400024
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800015420
- ReraGenie IDRG-MH-64982
Builder
- NameAPCON CONSTRUCTION COMPANY
- Entity typePartnership
- PartnerSUJATA UDAY RAWOOL
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on23 Feb 2018
- Promised completion30 Dec 2026
- Revised completionRevised to 30 Dec 2026 (originally 31 Dec 2019)
- Buildings1 building record
- Documents filed116 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NEHRU NAGAR VISHWADHAM CHS LTD | NA | 18 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 4 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 80%.
NEHRU NAGAR VISHWADHAM CHS LTD: 71% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
Progress on shared amenities15
As on 4 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VIVEK BHOSALE ASSOCIATES |
| Engineer | MANOJ V SATHE |
| Partner | Role in project |
|---|---|
| APCON CONSTRUCTION COMPANY | - |
Extensions applied for5
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAs per permission from MCGM & MHADA for Construction of Building up to 16" Floor and as per Commencement Certificate our work is almost completed and we issued Possession Certificates to the Rehab tenants and respective buyer's but now we had received height extension certificate from Aviation Authority to construct the building upto 20" Floor. in view of the above, we could not complete the proposed development as per prescribed schedule due to above reasons. We therefore request you to extend the date of completion of proposed project till 30.12.2024 for further construction work.
Reason as filed by the promoterDue to transportation issues delay in material of procurement Non-availability of workers/manpoower As per Banking and Registration department norms RERA extension certificate required for Registration of unsold flats and claims for inventory of sold flats from bankers.
Reason as filed by the promoterAs per permission from MCGM & MHADA For Construction of Building up to 10th Floor as per Commencement Certificate our Work is in process but Due to follwing reason the work was delayed. a) Due to recent COVID-19 Pandemic and subsequent nationwide lockdown . b) Non-availability of workers / material due to lockdown
Reason as filed by the promoterAs per permission form MCGM for zero plinth we have completed the plinth on December 2017 and as per procedure the plinth checking was planned but due to following reasons the work was delayed. a) MHADA declared as special Planning Authorities for Development of MHADA layout / Proposal (i.e. DCR 33(5)), as per circular no. TPB 4315/167/No. 51/2015/UD-11. Therefore the proposal has been transferred from Building Proposal (MCGM) to Building Permission Cell (MHADA) b) Hon. Supreme Court of India in SLP (Civil) No. 023708/2017, order passed on dated 15.03.2018 to finalization of policy to complian
Reason as filed by the promoterBAR CHART Please refer the architect form 1 showing the present status of work completed and all the other work is also completed for compliance required for oc. 1. Finishing work :- completed 2. Water connection :- Granted 3. Electricity meter :- installed 4. Lift :- Installed We applied for upper floors i.e 17th to 20th floors NOC's/ Permission like EETC Remark, CFO, FSI NOC, Concession, Amended Plan and Commencement Certificate from BMC and MHADA We will start our construction work and complete the project on receipt of NOC's/Permission from BMC/MHADA which is expected within next two to th
Litigation declared1
| Case | Court | Status |
|---|---|---|
| STAMP NO 35062 /2016/HC CIVIL APPLICATION NO 93 OF 2017/2016 | HIGH COURT | DISMISSED |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000023708 | MR. SANJAY RAJARAM KADAM & 5 OTHERS | MR. UDAY VASANT RAWOOL | 31/03/2018 |
| CC006000000195496 | Amol Savale | Apcon Construction Company | 12/01/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Jan 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Apr 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Jul 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2026
Documents filed116
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 116 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 3)File: CA _compressed.pdf | 4 Jul 2025 |
| Building plan approvalFile: IOD doc.pdf | 2 Jul 2025 |
| Building plan approvalFile: Approved Plan 1.PDF | 2 Jul 2025 |
| Building plan approvalFile: Approved Plan 2.pdf | 2 Jul 2025 |
| Building plan approvalFile: Approved Plan 3.PDF | 2 Jul 2025 |
| Declaration in FORM BFile: form b.pdf | 2 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate (3)_compressed.pdf | 2 Jul 2025 |
| Certificates of CA (Form 3)File: CA (1)_compressed.pdf | 2 Jul 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 2 Jul 2025 |
| Building Plan Approval (IOD)File: IOD doc.pdf | 2 Jul 2025 |
| Building Plan Approval (IOD)File: Approved Plan 1.PDF | 2 Jul 2025 |
| Building Plan Approval (IOD)File: Approved Plan 2.pdf | 2 Jul 2025 |
| Building Plan Approval (IOD)File: Approved Plan 3.PDF | 2 Jul 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: bank account.pdf | 2 Jul 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: other project.pdf | 2 Jul 2025 |
| Details of encumbrances concerned to FinanceFile: GetUserDocumentFileContent.pdf | 20 Jun 2025 |
| Details of encumbrances concerned to LegalFile: GetUserDocumentFileContent.pdf | 20 Jun 2025 |
| Proforma of Agreement for saleFile: 1 Proforma of Allotment letter (11).pdf | 20 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect (Form 1).pdf | 15 Feb 2025 |
| Certificates of CA (Form 3)File: Apcon construction Form 3_compressed.pdf | 15 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 15 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf | 15 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineers Certificate on Quality Assurance (Form 2A FY 2023-24).pdf | 15 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annual Audit Report of Statutory CA (Form 5).pdf | 15 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 19 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Booked inventory.pdf | 19 Mar 2024 |
| Declaration in FORM BFile: form-B Notarized Copy_compressed.pdf | 13 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Architect Certificate Self Attested_compressed.pdf | 13 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Engr Certificate 1st Qtr 2023 24 Self Attested_compressed.pdf | 13 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Engr Certificate 2nd Qtr 2023 24 Self Attested Compressed.pdf | 13 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Engr Certificate 3rd Qtr 2023 24 Self Attested compressed.pdf | 13 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 CA Certificate 2022-23 Self Attested_compressed.pdf | 13 Mar 2024 |
| Declaration in FORM BFile: Form-B Declaration.pdf | 29 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 EC.pdf | 29 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 1Q.pdf | 29 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Engr Certificate 2nd Qtr 2023-24.pdf | 29 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A E Certificate 3rd Qtr.pdf | 29 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 CA Certificate 2022-23.pdf | 29 Feb 2024 |
| Declaration in FORM BFile: form-C Buyers Consent_compressed.pdf | 28 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1AC.pdf | 28 Feb 2024 |
| Certificates of CA (Form 3)File: FORM 3.pdf | 28 Feb 2024 |
| Certificates of CA (Form 3)File: CA CERTIFICATE_compressed.pdf | 15 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engr Certificate Form 2A.pdf | 30 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 (1).pdf | 2 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 2 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf | 2 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY 2022.pdf | 2 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch certificate FORM 1 APRIL.pdf | 4 Jul 2022 |
| Certificates of CA (Form 3)File: form 3 CA CERTIFICATE.pdf | 29 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 24 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 24 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 24 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 24 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE FORM 1.pdf | 24 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE FORM 1.pdf | 24 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE FORM 1.pdf | 24 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE FORM 1.pdf | 24 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE FORM 1.pdf | 24 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Site Supervisor Certificate.pdf | 5 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Declaration Form.pdf | 5 Aug 2021 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf | 27 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 2019-20.pdf | 27 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 2020-21.pdf | 27 Jul 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engrs certificate form 2.pdf | 25 Jun 2021 |
| Certificates of CA (Form 3)File: FORM 3 CA CERTIFICATE NEW.pdf | 25 Jun 2021 |
| Building plan approvalFile: IOD-Amended approval Plan1_compressed (1).pdf | 6 Apr 2021 |
| Building plan approvalFile: IOD-Amended approval Plan2.pdf | 6 Apr 2021 |
| Building plan approvalFile: IOD-Amended approval Plan3_compressed.pdf | 6 Apr 2021 |
| Layout approvalFile: Amended Approval 16thFlr 1.pdf | 6 Apr 2021 |
| Copy of Layout Approval (in case of layout)File: Amended Approval 16thFlr 1.pdf | 6 Apr 2021 |
| Building Plan Approval (IOD)File: IOD-Amended approval Plan1_compressed (1).pdf | 6 Apr 2021 |
| Building Plan Approval (IOD)File: IOD-Amended approval Plan2.pdf | 6 Apr 2021 |
| Building Plan Approval (IOD)File: IOD-Amended approval Plan3_compressed.pdf | 6 Apr 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Upto 10th Flr.pdf | 6 Apr 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: CC-Revalidation letter.pdf | 6 Apr 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 CA Certificate Yr 2017-2018.pdf | 6 Jan 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 CA Certificate Yr 2018-2019.pdf | 6 Jan 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 CA Certificate.pdf | 19 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form no 1 architect certificate.pdf | 22 Sep 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form no 2 certificate of engineer.pdf | 22 Sep 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 116 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep NEHRU NAGAR VISHWADHAM CHS LTD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MHADA COLONY6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 318 registered projects within 2 km.
Ruparel Urbana
R R Builders
SKYVIEW CHS
HIRANIMANTHAN BUILDERS AND DEVELOPERS
Ruparel Crest
BHARAT MAHAN DEVELOPERS & BUILDERS
Kurla Vijay Rahivashi Sangh Co-op. Hsg.Soc.Ltd
VIKAS NARAYAN RAIKAR
Pearl Grace
Pearl Concept Habitat LLP
SAYBA CRYSTAL
AMOOL ENTERPRISES
See every Mumbai Suburban project, with the district possession charts
Builder: APCON CONSTRUCTION COMPANY
APCON CONSTRUCTION COMPANY has 1 registration on MahaRERA, including NEHRU NAGAR VISHWADHAM CHS LTD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if NEHRU NAGAR VISHWADHAM CHS LTD is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NEHRU NAGAR VISHWADHAM CHS LTD?
The registered promoter entity is APCON CONSTRUCTION COMPANY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NEHRU NAGAR VISHWADHAM CHS LTD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against NEHRU NAGAR VISHWADHAM CHS LTD?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for NEHRU NAGAR VISHWADHAM CHS LTD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NEHRU NAGAR VISHWADHAM CHS LTD?
The professionals named in the filing: Architect: VIVEK BHOSALE ASSOCIATES; Engineer: MANOJ V SATHE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NEHRU NAGAR VISHWADHAM CHS LTD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback