ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / NEHRU NAGAR SHREE GANESH KRUPA CHS LTD. BLDG NO. 120

Registration lapsed No litigation declared Residential / Group Housing project

NEHRU NAGAR SHREE GANESH KRUPA CHS LTD. BLDG NO. 120

By HIRANIMANTHAN BUILDERS AND DEVELOPERS

RG-MH-60082 · RERA P51800031567 · Last updated on MahaRERA portal: 8 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
7 of 11Construction stages donefurthest along: Basement (if any), 0%
1 of 77Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

NEHRU NAGAR SHREE GANESH KRUPA CHS LTD. BLDG NO. 120 is a Residential / Group Housing project by HIRANIMANTHAN BUILDERS AND DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800031567 on 31 Oct 2021. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 76 of the 77 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameNEHRU NAGAR SHREE GANESH KRUPA CHS LTD. BLDG NO. 120
  • TypeResidential / Group Housing
  • Location
    • NEHRU NAGAR
    • KURLA NEHRU NAGAR
    • Kurla
    • Mumbai Suburban
    • 400024
  • Pincode400024
  • RERA no.P51800031567
  • ReraGenie IDRG-MH-60082

Builder

  • NameHIRANIMANTHAN BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnerDINESH SAVANT
  • Other registrations5 more →
  • Completed5 of 6
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

10 months past promisethis monthRegisteredOct 2021PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Oct 2021
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed66 files

Current status

99%76 of 77 units booked
99.8%Work done, per cost certificate

Figures as on 8 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NEHRU NAGAR SHREE GANESH KRUPA CHS LTD BLDG NO 120NA202071677

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

NEHRU NAGAR SHREE GANESH KRUPA CHS LTD BLDG NO 120: 64% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 8 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area853 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Sep 2025

Approvals and building plan

Sanctioning authorityMAHARASHTRA HOUSING DEVELOPMENT CORPORATION
Permissible FSI7894.67
Proposed, not sanctioned5,894 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAJESH APARTMENT , CHANDAWARKAR ROAD, BORIVALI WEST MUMBAI - 400092
Estimated costRs 34.00 cr
Cost incurredRs 33.93 cr
Work done99.8%
BuildingWingEstimatedIncurred
NEHRU NAGAR SHREE GANESH KRUPA CHS LTD BLDG NO 120NARs 34.00 crRs 33.93 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKISHOR LOTLIKAR
EngineerDHANANJAY PARAB
Chartered AccountantSURESH KOTHARI & VIJAY TATER
Chartered AccountantSURESH KOTHARI
Chartered AccountantV R SK AND CO LLP
Chartered AccountantSURENDRA HEDA
PartnerRole in project
HIRANIMANTHAN BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: BLDG NO 120 RERA CERTIFICATE DATED .pdf8 May 2026
Withdrawal Update Form 2File: Building No 120 Rera Form .pdf8 May 2026
Withdrawal Update Form 3File: form 3.pdf8 May 2026
Withdrawal Update Form 1File: FORM 1 120 .pdf16 Feb 2026
Withdrawal Update Form 2File: RERA-120-ENG-SPT25-.pdf16 Feb 2026
Withdrawal Update Form 3File: CA 120.pdf16 Feb 2026
Form 5 (FY 2024-2025)File: HMBD - Bldg 120 - Form 5 - Mar 25.pdf7 Nov 2025
Withdrawal Update Form 1File: RERA-120-SEPT25.pdf4 Nov 2025
Withdrawal Update Form 2File: RERA-120-ENG-SPT25-.pdf4 Nov 2025
Withdrawal Update Form 3File: Signed RERA FORM 3 Bldg 120 Sept 25.pdf4 Nov 2025
Withdrawal Update Form 1File: RERA-ARCH-120-JUNE25.pdf15 Sep 2025
Withdrawal Update Form 2File: RERA-120-ENG-JUNE25-.pdf15 Sep 2025
Withdrawal Update Form 3File: RARA-120-CA.pdf15 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 120 CA Certificate.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 120 Eng Certificate.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera-Arch-March25-120.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 120-CA-RERA-DEC25.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 120-ENG-RERA-DEC25.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 120.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH-RERA-120-SEPT24.pdf13 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA-CA-120.pdf13 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng-120-oct24.pdf13 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: quality assurance 120-23-24.pdf20 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RARA-120-ENG.pdf8 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RARA-120-CA.pdf8 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: bldg 120 Arch.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA-120-MARCH24.pdf25 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 120 .pdf1 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG-120-DEC-23.pdf9 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH-120.pdf6 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA-120_compressed.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC-120-SEPT23.pdf9 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG-120-SEPT23.pdf6 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 120 CA Certificate_compressed.pdf6 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA-ENG-120-JUNE23.pdf10 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA-CA-120-JUNE23.pdf10 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-120-ARCH-JUNE23.pdf21 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG-RERA-120-MARCH23.pdf23 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA-RERA-120-MARCH23_compressed.pdf23 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-ARCH-120-MARCH23.pdf26 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG-120-DEC22.pdf7 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 120-CA-RERA-DEC22.pdf7 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH-120-DEC23.pdf24 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 120 - RERA Form 5 - Mar 22_compressed.pdf17 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG 120 Q2.pdf10 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA-SEPT22-120 (1).pdf10 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2, BLDG 120.pdf20 Oct 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Soc Regn Cert 120.pdf24 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG-120-JUNE22.pdf23 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA-120-CA-JUNE22_compressed.pdf23 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-120-ARCH-JUNE22.pdf27 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg q3 2122_compressed.pdf22 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Q3 2122.pdf22 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf26 Oct 2021
Declaration about Commencement CertificateFile: declaration-120.pdf26 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA SIGNED_compressed.pdf26 Oct 2021
Copy of the legal title reportFile: Title Legal Report 120.pdf19 Oct 2021
Proforma of Allotment letterFile: Draft Agreement.pdf16 Oct 2021
Layout approvalFile: 120-1-14-6-21_compressed_compressed.pdf7 Oct 2021
Building plan approvalFile: 120-1-14-6-21_compressed_compressed.pdf7 Oct 2021
PAN CardFile: 1 PAN Card.pdf7 Oct 2021
Details of encumbrancesFile: No Encumbrance Certificate 120.pdf7 Oct 2021
Copy of Layout Approval (in case of layout)File: 120-1-14-6-21_compressed_compressed.pdf7 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: 120-1-14-6-21_compressed_compressed.pdf7 Oct 2021
Declaration in FORM BFile: Form B 120.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: Disclosure 120.pdf7 Oct 2021

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
MEGHDOOT CHSMEGHDOOT CHS BUIDLING NO 73 NEHRU NAGAR KURLA EAST MUMBAI 40002451CompletedNov 2010Late, Dec 2010
ANTARIKSH CHSANTARIKSH CHS BUILDING NO 43 NEHRU NAGAR KURLA EAST MUMBAI 40002475CompletedFeb 2008Late, Mar 2008

How this compares with Mumbai Suburban

99%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NEHRU NAGAR SHREE GANESH KRUPA CHS LTD. BLDG on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KURLA NEHRU NAGAR6,700+ in Mumbai Suburban

Builder: HIRANIMANTHAN BUILDERS AND DEVELOPERS

HIRANIMANTHAN BUILDERS AND DEVELOPERS has 6 registrations on MahaRERA, including SKYVIEW CHS and SHREE SIDDHI BLDG NO 69. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that NEHRU NAGAR SHREE GANESH KRUPA CHS LTD. BLDG NO. 120 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if NEHRU NAGAR SHREE GANESH KRUPA CHS LTD. BLDG NO. 120 is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEHRU NAGAR SHREE GANESH KRUPA CHS LTD. BLDG NO. 120?

The registered promoter entity is HIRANIMANTHAN BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEHRU NAGAR SHREE GANESH KRUPA CHS LTD. BLDG NO. 120?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NEHRU NAGAR SHREE GANESH KRUPA CHS LTD. BLDG NO. 120?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NEHRU NAGAR SHREE GANESH KRUPA CHS LTD. BLDG NO. 120?

The professionals named in the filing: Architect: KISHOR LOTLIKAR; Engineer: DHANANJAY PARAB; Chartered Accountant: SURESH KOTHARI & VIJAY TATER; Chartered Accountant: SURESH KOTHARI; Chartered Accountant: V R SK AND CO LLP; Chartered Accountant: SURENDRA HEDA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEHRU NAGAR SHREE GANESH KRUPA CHS LTD. BLDG NO. 120?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEHRU NAGAR SHREE GANESH KRUPA CHS LTD. BLDG NO. 120. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEHRU NAGAR SHREE GANESH KRUPA CHS LTD. BLDG to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.