Home / Browse projects / Mumbai Suburban, Maharashtra / NEHRU NAGAR SHIV VAIBHAV CHS LTD BLDG NO 38
NEHRU NAGAR SHIV VAIBHAV CHS LTD BLDG NO 38
By PARSN CONSTRUCTION AND DEVELOPERS PRIVATE LIMITED
RG-MH-91119 · RERA P51800032409 · Last updated on MahaRERA portal: 25 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NEHRU NAGAR SHIV VAIBHAV CHS LTD BLDG NO 38 is a Residential / Group Housing project by PARSN CONSTRUCTION AND DEVELOPERS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800032409 on 4 Jan 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 70 of the 106 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameNEHRU NAGAR SHIV VAIBHAV CHS LTD BLDG NO 38
- TypeResidential / Group Housing
- Location
- NEHRU NAGAR
- Kurla
- Mumbai Suburban
- 400024
- Pincode400024
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800032409
- ReraGenie IDRG-MH-91119
Builder
- NamePARSN CONSTRUCTION AND DEVELOPERS PRIVATE LIMITED
- Entity typeCompany
- CINU42909MH2023PTC404735
- PartnersRAJAN PRABHAKAR PATHARE, KRUPA RAJAN PATHARE, SEENA SUDHANSHU NAIK
- Other registrations4 more →
- Completed1 of 5
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on4 Jan 2022
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
- Buildings1 building record
- Documents filed110 files
Current status
Figures as on 25 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NEHRU NAGAR SHIV VAIBHAV CHS LTD BLDG NO 38 | NA | 19 | 18 | 106 | 0 | 106 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 25 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.
NEHRU NAGAR SHIV VAIBHAV CHS LTD BLDG NO 38: 83% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 45% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
Progress on shared amenities15
As on 25 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 30% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| PARSN FOUNDATION AND ENGG CORPN | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| NEHRU NAGAR SHIV VAIBHAV CHS LTD BLDG NO 38 | NA | Rs 31.50 cr | Rs 21.04 cr |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | INNOVATIONS |
| Architect | KISHORE LOTLIKAR |
| Engineer | MAHONAR |
| Engineer | S B RATHOD |
| Engineer | VIJAY NARANG |
| Chartered Accountant | S M BHAT & ASSOCIATES |
| Chartered Accountant | S M BHATT AND ASSOCIATES |
| Chartered Accountant | TALATI & CO. |
| Partner | Role in project |
|---|---|
| PARSN CONSTRUCTION AND DEVELOPERS PRIVATE LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterExplanatory note regarding the state of development works in the projects and reason for being not completing development works of the projects within the period declared in the declaration submitted in FORM ‘B’ at the time of making the application for the registration of NEHRU NAGAR SHIV VAIBHAV CHS LTD BLDG NO 38’ - As per the details mentioned at the time of registration of the project at the MahaRERA Website we had mentioned 31/12/2026 as the project completion date, we will not be able to complete the project due to various unavoidable reasons. Such as 1) After the impact of the pandemic
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Dec 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Nov 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Aug 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed110
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 110 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: FORM 5 (1).pdf | 25 May 2026 |
| Form 2A (FY 2025-2026)File: FORM 2A_MARCH 26_ PARSN BULDG NO 38.pdf | 18 May 2026 |
| Withdrawal Update Form 1File: FORM 1_ MARCH 26_ PARSN BULDG NO 38.pdf | 4 May 2026 |
| Withdrawal Update Form 2File: FORM 2_ MARCH 26_ BULDG NO 38.pdf | 4 May 2026 |
| Withdrawal Update Form 3File: FORM 3_ MARCH 26_ PARSN BULDG NO 38.pdf | 4 May 2026 |
| Withdrawal Update Form 1File: FORM 1_ DEC 25_ PARSN BULDG NO 38.pdf | 1 May 2026 |
| Withdrawal Update Form 2File: FORM 2_ DEC 25_ PARSN BULDG NO 38.pdf | 1 May 2026 |
| Withdrawal Update Form 3File: FORM 3_ DEC 25_ PARSN BULDG NO 38.pdf | 1 May 2026 |
| Form 2A (FY 2024-2025)File: Form 2A_24-25_ 38.pdf | 22 Dec 2025 |
| Form 1File: FORM 1_SEP 25_ PARSN_ BULDG NO 38.pdf | 15 Dec 2025 |
| Form 2File: FORM 2_SEP 25_ PARSN_ BULDG NO 38.pdf | 15 Dec 2025 |
| Form 3File: FORM 3_SEP 25_PARSN BLDG NO 38.pdf | 15 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_SEP 25_BLDG NO 38.pdf | 15 Dec 2025 |
| Form 1File: FORM 1_ JUNE 25_ PARSN_ BULDG NO 38.pdf | 3 Dec 2025 |
| Form 2File: FORM 2_ JUNE 25_ PARSN_ BULDG NO 38.pdf | 3 Dec 2025 |
| Form 3File: FORM 3_ JUNE 25_ PARSN_ BULDG NO 38.pdf | 3 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_JUNE 25_PARSN_BULDG NO 38.pdf | 3 Dec 2025 |
| Form 1File: FORM 1_ MARCH 25_ PARSN_ BULDG NO 38.pdf | 11 Nov 2025 |
| Form 2File: FORM 2_ MARCH 25_ PARSN_ BULDG NO 38.pdf | 11 Nov 2025 |
| Form 3File: FORM 3_ MARCH 25_ PARSN_ BULDG NO 38.pdf | 11 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ MARCH 25_ PARSN_ BULDG NO 38.pdf | 11 Nov 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1_Parsn Construction And Developers Private Limited_ NEHRU NAGAR SHIV VAIBHAV CHS L | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3_Parsn Construction And Developers Private Limited_ NEHRU NAGAR SHIV VAIBHAV CHS L | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2_Parsn Construction And Developers Private Limited_ NEHRU NAGAR SHIV VAIBHAV CHS L | 18 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 4 SOLD UNSOLD_Parsn Construction And Developers Private Limited_ NEHRU NAGAR SHIV VAIBHAV | 18 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5_ MARCH 22.pdf | 10 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5_ MARCH 23.pdf | 10 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5_ SEP 23.pdf | 10 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5_ MARCH 24.pdf | 10 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 5 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Shiv Vaibhav(B38).pdf | 5 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5_ SEP 23.pdf | 19 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1_ SEP 24.pdf | 16 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ SEP 24_compressed.pdf | 16 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ SEP 24.pdf | 16 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ SEP 24.pdf | 16 Dec 2024 |
| Declaration in FORM BFile: Form B_copy.pdf | 22 Oct 2024 |
| Building plan approvalFile: BLDG NO - 38 AMENDED PLAN DATED - 28-03-2024 (1).pdf | 18 Aug 2024 |
| Building plan approvalFile: BLDG NO - 38 AMENDED PLAN DATED - 28-03-2024 (2)_compressed-compressed.pdf | 18 Aug 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: BLDG NO - 38 AMENDED PLAN DATED - 28-03-2024 (1).pdf | 18 Aug 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: BLDG NO - 38 AMENDED PLAN DATED - 28-03-2024 (2)_compressed-compressed.pdf | 18 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1_ JUNE 24.pdf | 31 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2_ JUNE 24.pdf | 31 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: 4 SOLD UNSOLD_ JUNE 24.pdf | 31 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3_ JUNE 24_compressed.pdf | 31 Jul 2024 |
| Details of encumbrancesFile: Encumbrances.pdf | 20 Jun 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 2 Format A-Bldg no 38.pdf | 16 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-SHIV VAIBHAV_MAR 24.pdf | 4 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-SHIV VAIBHAV_MAR 24.pdf | 4 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A-SHIV VAIBHAV_23 24.pdf | 4 May 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-SHIV VAIBHAV_MAR 24.pdf | 4 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-SHIV VAIBHAV_MAR 24.pdf | 4 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NEHRU NAGAR SHIV VAIBHAV CHS LTD BLDG NO 38_FORM 1.pdf | 12 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEHRU NAGAR SHIV VAIBHAV CHS LTD BLDG NO 38_FORM 2.pdf | 12 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: NEHRU NAGAR SHIV VAIBHAV CHS LTD BLDG NO 38_SOLD UNSOLD.pdf | 12 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NEHRU NAGAR SHIV VAIBHAV CHS LTD BLDG NO 38_FORM 3.pdf | 12 Mar 2024 |
| Details of encumbrancesFile: Details of encumbrance conceraned to finanace.pdf | 23 Jan 2024 |
| CERSAI detailsFile: CERSAI_Acknowledgemnt_Report_200292937251_For_Registration_Of_Security_Interest_09_01_2024 | 23 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 - SCANNED.PDF | 10 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_38.pdf | 6 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_38.pdf | 6 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf | 6 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold_38.pdf | 6 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_38_compressed.pdf | 6 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-NEHRUNAGAR SHIV VAIBHAV_JUN 23.pdf | 5 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-NEHRUNAGAR SHIV VAIBHAV_JUN 23.pdf | 5 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A-NEHRUNAGAR SHIV VAIBHAV_22 23.pdf | 5 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-NEHRUNAGAR SHIV VAIBHAV_JUN 23.pdf | 5 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-NEHRUNAGAR SHIV VAIBHAV_JUN 23_compressed.pdf | 5 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form _2 - 38.pdf | 5 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-NEHRU NAGAR SHIV VAIBHAV_MAR 23.pdf | 24 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOKED-NEHRU NAGAR SHIV VAIBHAV_MAR 23.pdf | 24 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-NEHRU NAGAR SHIV VAIBHAV_MAR 23.pdf | 24 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-NEHRUNAGAR VAIBHAV 38_DEC 22.pdf | 30 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-NEHRUNAGAR VAIBHAV 38_DEC 22.pdf | 30 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-NEHRUNAGAR VAIBHAV 38_DEC 22.pdf | 30 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-NEHRUNAGAR VAIBHAV 38_DEC 22.pdf | 30 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 15 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 (21-22).pdf | 15 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 19 Jan 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 110 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NEHRU NAGAR SHIV VAIBHAV CHS LTD BLDG NO 38 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEHRU NAGAR6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 393 registered projects within 2 km.
Ruparel Urbana
R R Builders
SKYVIEW CHS
HIRANIMANTHAN BUILDERS AND DEVELOPERS
Ruparel Crest
BHARAT MAHAN DEVELOPERS & BUILDERS
Kurla Vijay Rahivashi Sangh Co-op. Hsg.Soc.Ltd
VIKAS NARAYAN RAIKAR
Pearl Grace
Pearl Concept Habitat LLP
SAYBA CRYSTAL
AMOOL ENTERPRISES
See every Mumbai Suburban project, with the district possession charts
Builder: PARSN CONSTRUCTION AND DEVELOPERS PRIVATE LIMITED
PARSN CONSTRUCTION AND DEVELOPERS PRIVATE LIMITED has 5 registrations on MahaRERA, including KURLA SAHAYOG CHS LTD., BLDG. NO.68 and NEHRU NAGAR PANCHRATNA CHS LTD, BLDG. NO.5. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if NEHRU NAGAR SHIV VAIBHAV CHS LTD BLDG NO 38 is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NEHRU NAGAR SHIV VAIBHAV CHS LTD BLDG NO 38?
The registered promoter entity is PARSN CONSTRUCTION AND DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its CIN U42909MH2023PTC404735 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NEHRU NAGAR SHIV VAIBHAV CHS LTD BLDG NO 38?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NEHRU NAGAR SHIV VAIBHAV CHS LTD BLDG NO 38?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NEHRU NAGAR SHIV VAIBHAV CHS LTD BLDG NO 38?
The professionals named in the filing: Architect: INNOVATIONS; Architect: KISHORE LOTLIKAR; Engineer: MAHONAR; Engineer: S B RATHOD; Engineer: VIJAY NARANG; Chartered Accountant: S M BHAT & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NEHRU NAGAR SHIV VAIBHAV CHS LTD BLDG NO 38?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback