Home / Browse projects / Mumbai Suburban, Maharashtra / NEHRU NAGAR GURUPRASAD CO-OPERATIVE HOUSING SOCIETY LIMITED

Completed No litigation declared Others project

NEHRU NAGAR GURUPRASAD CO-OPERATIVE HOUSING SOCIETY LIMITED

By DERAIYA REALTORS PRIVATE LIMITED

RG-MH-15796 · RERA P51800023015 · Last updated on MahaRERA portal: 17 Feb 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

NEHRU NAGAR GURUPRASAD CO-OPERATIVE HOUSING SOCIETY LIMITED is a Others project by DERAIYA REALTORS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800023015 on 14 Nov 2019. The registration is recorded completed; possession was promised by 30 Dec 2025. 1 complaint is on record with the regulator.

At a glance

Project

  • NameNEHRU NAGAR GURUPRASAD CO-OPERATIVE HOUSING SOCIETY LIMITED
  • TypeOthers
  • Location
    • S. G. BARVE MARG
    • NEHRU NAGAR
    • Kurla
    • Mumbai Suburban
    • 400024
  • Pincode400024
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800023015
  • ReraGenie IDRG-MH-15796

Builder

  • NameDERAIYA REALTORS PRIVATE LIMITED
  • Entity typeCompany
  • CINU70102MH2011PTC213094
  • GSTIN27AADCD7365D1ZO
  • DirectorASLAM MOHAMMAD AGWAN
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2019PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Nov 2019
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DERAIYA ICONICO A AND B WINGNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

DERAIYA ICONICO A AND B WING: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed84

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots84
Closed/Covered84

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,334 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityBUILDING PERMISSION CELL GREATER MUMBAI/MHADA
Permissible FSI6991.87
Proposed, not sanctioned6,992 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 4 Runwal Anthurium Retail LBS Marg in front of Veena Nagar Mulund W Mumbai 400080

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPACE MOULDERS
EngineerSIHAVAT CONSULTANCY SERVICES
Chartered AccountantAfzal N Patel & Co
Chartered AccountantR A N K & Associates
PartnerRole in project
DERAIYA REALTORS PRIVATE LIMITED-

Litigation declared9

CaseCourtStatus
2714/2019In The Bombay City Civil Court at MumbaiSuit has been disposed
2715/2019In The Bombay City Civil Court at MumbaiSuit has been disposed
2726/2019In The Bombay City Civil Court at MumbaiSuit has been disposed
2727/2019In The Bombay City Civil Court at MumbaiSuit has been disposed
2728/2019In The Bombay City Civil Court at MumbaiSuit has been disposed
2932/2019In The Bombay City Civil Court at MumbaiSuit has been disposed
2933/2019In The Bombay City Civil Court at MumbaiSuit has been disposed
2934/2019In The Bombay City Civil Court at MumbaiSuit has been disposed
3143/2019In The Bombay City Civil Court at MumbaiSuit has been disposed

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12501196DERAIYA REALTORS PRIVATE LIMITEDMR ABHIJIT RAMESH KEKANE10/04/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Nov 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Nov 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Apr 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Jan 2025

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Guruprasad Sold and Unsold 31-10-24.pdf17 Feb 2025
Other - TechnicalFile: Form 4 Guruprasad Nehru Nagar.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Guruprasad_Form 3.pdf13 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2- ENG CERT-Guruprasad-RERA-June 2024_V3.pdf13 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5_Guruprasad_FY 19-20.pdf13 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_Guruprasad_FY 20-21.pdf13 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_Guruprasad_FY 21-22.pdf13 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_Guruprasad_FY 22-23.pdf13 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Guruprasad_FY 23-24.pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 19-07-2024.pdf10 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A_2019-20.pdf10 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A_2021-22.pdf10 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A_2022-23.pdf10 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A_2023-24.pdf10 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Guruprasad Nehru Nagar.pdf18 Jan 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate.pdf18 Jan 2025
Status of ConveyanceFile: Conveyance Deed - Neharu Nagar Guruprasad CHS LTD.pdf18 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full Occupation Certificate Guruprasad CHSL.pdf18 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Approved FCC.pdf8 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: F2 FCC 18th floor.pdf8 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Dec 22.pdf24 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 Architect Certificate.pdf7 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate (2).pdf23 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf18 Jul 2022
Proforma of Allotment letterFile: 40 - Draft Agreement.pdf28 Apr 2022
Details of encumbrancesFile: Encumbrance On Project.pdf14 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: FURTHER CC.pdf3 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Jul-Sep 2021.pdf3 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Oct-Dec 2021.pdf3 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf15 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: Further CC.pdf14 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Apr-Jun 2021.pdf14 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Jun 2021.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Quality Assurance Certifcate Apr Jun 2021.pdf14 Aug 2021
Building plan approvalFile: Amended IOA.pdf30 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA.pdf30 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: Further CC 11-02-2021.pdf12 Mar 2021
Building plan approvalFile: IOA.pdf5 Nov 2019
Layout approvalFile: Ground Floor.pdf5 Nov 2019
Layout approvalFile: First Floor.pdf5 Nov 2019
Layout approvalFile: Typical Floor.pdf5 Nov 2019
Layout approvalFile: 10th Floor.pdf5 Nov 2019
PAN CardFile: 40 DRPL Pan.pdf5 Nov 2019
Copy of the legal title reportFile: Legal Title Certificate.pdf5 Nov 2019
Details of encumbrancesFile: NON- ENCUMBRANCE CERTIFICATE.pdf5 Nov 2019
Copy of Layout Approval (in case of layout)File: Ground Floor.pdf5 Nov 2019
Copy of Layout Approval (in case of layout)File: First Floor.pdf5 Nov 2019
Copy of Layout Approval (in case of layout)File: Typical Floor.pdf5 Nov 2019
Copy of Layout Approval (in case of layout)File: 10th Floor.pdf5 Nov 2019
Building Plan Approval / NA Order for plotted developmentFile: IOA.pdf5 Nov 2019
Commencement Certificates / NA Order for plotted developmentFile: 40 PLINTH CC.pdf5 Nov 2019
Declaration in FORM BFile: FORM B AFFIDAVIT CUM DECLARATION.pdf5 Nov 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf5 Nov 2019
Proforma of Allotment letterFile: Allotment Letter and Agreement for Sale.pdf5 Nov 2019

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NEHRU NAGAR GURUPRASAD CO-OPERATIVE HOUSING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEHRU NAGAR6,700+ in Mumbai Suburban

2 kmNEHRU NAGAR GURUPRASAD CCompleted 112Lapsed / revoked 97Other 148Dot size: filed unitsN

Filed coordinates, straight-line distance. 357 registered projects within 2 km.

Builder: DERAIYA REALTORS PRIVATE LIMITED

DERAIYA REALTORS PRIVATE LIMITED has 2 registrations on MahaRERA, including NEHRU NAGAR GURUPRASAD CO-OPERATIVE HOUSING SOCIETY LIMITED and Nehru Nagar Nirmal C.H.S. Ltd.. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if NEHRU NAGAR GURUPRASAD CO-OPERATIVE HOUSING SOCIETY LIMITED is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEHRU NAGAR GURUPRASAD CO-OPERATIVE HOUSING SOCIETY LIMITED?

The registered promoter entity is DERAIYA REALTORS PRIVATE LIMITED, a company as per the filing. Its CIN U70102MH2011PTC213094 and GSTIN 27AADCD7365D1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEHRU NAGAR GURUPRASAD CO-OPERATIVE HOUSING SOCIETY LIMITED?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against NEHRU NAGAR GURUPRASAD CO-OPERATIVE HOUSING SOCIETY LIMITED?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for NEHRU NAGAR GURUPRASAD CO-OPERATIVE HOUSING SOCIETY LIMITED?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NEHRU NAGAR GURUPRASAD CO-OPERATIVE HOUSING SOCIETY LIMITED?

The professionals named in the filing: Architect: SPACE MOULDERS; Engineer: SIHAVAT CONSULTANCY SERVICES; Chartered Accountant: Afzal N Patel & Co; Chartered Accountant: R A N K & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEHRU NAGAR GURUPRASAD CO-OPERATIVE HOUSING SOCIETY LIMITED?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEHRU NAGAR GURUPRASAD CO-OPERATIVE HOUSING SOCIETY LIMITED. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEHRU NAGAR GURUPRASAD CO-OPERATIVE HOUSING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.