Home / Browse projects / Mumbai Suburban, Maharashtra / Neelkanth Enclave D Wing Siddhartha
Neelkanth Enclave D Wing Siddhartha
By Bhaveshwar Properties Pvt Ltd
RG-MH-30636 · RERA P51800031210 · Last updated on MahaRERA portal: 28 Sep 2023
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 2 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Neelkanth Enclave D Wing Siddhartha is a Residential / Group Housing project by Bhaveshwar Properties Pvt Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800031210 on 11 Oct 2021. The registration is recorded completed; possession was promised by 30 Jun 2024.
At a glance
Project
- NameNeelkanth Enclave D Wing Siddhartha
- TypeResidential / Group Housing
- Location
- LBS Marg
- Ghatkopar
- Kurla
- Mumbai Suburban
- 400086
- Pincode400086
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800031210
- ReraGenie IDRG-MH-30636
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on11 Oct 2021
- Promised completion30 Jun 2024
- Revised completionNone
- Buildings1 building record
- Documents filed184 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| D Wing - Siddhartha | NA | 16 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
D Wing - Siddhartha: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 28 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed91
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Ronuk Industries Pvt Ltd | Greater Mumbai (M Corp.) (Part) (802794) | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Daisaria Associates Shri Manoj V Daisaria |
| Architect | Architect Hafeez Contractor |
| Engineer | Dharmendra K Upadhyay |
| Chartered Accountant | Jinesh Mota & Co |
| Chartered Accountant | Gyaneshwar Kataram & Associates |
| Partner | Role in project |
|---|---|
| Bhaveshwar Properties Pvt Ltd | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Oct 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Mar 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Mar 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 22 Mar 2023
Documents filed184
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 184 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 2022-23.pdf | 28 Sep 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Registration Certificate Siddhartha Soc.pdf | 9 Aug 2023 |
| Proforma of Agreement for saleFile: DWingAFS22flats24042023.pdf | 24 Apr 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviationreport24042023.pdf | 24 Apr 2023 |
| Deviation Report with respect to model copy of AgreementFile: Additionalreport24042023.pdf | 24 Apr 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation.pdf | 20 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 010423.pdf | 8 Apr 2023 |
| Proforma of Agreement for saleFile: AFS post OC 28032023.pdf | 28 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Clause 28032023.pdf | 28 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: Addition Clause 28032023.pdf | 28 Mar 2023 |
| Building plan approvalFile: OC Plan Sections.pdf | 23 Mar 2023 |
| Building plan approvalFile: OC Plan Section 1.pdf | 23 Mar 2023 |
| Layout approvalFile: OC Plan Layout.pdf | 23 Mar 2023 |
| Building plan approvalFile: OC Plan Parking.pdf | 23 Mar 2023 |
| Building plan approvalFile: OC Plan Lower Ground.pdf | 23 Mar 2023 |
| Building plan approvalFile: OC Plan Upper Ground.pdf | 23 Mar 2023 |
| Building plan approvalFile: OC Plan Stilt.pdf | 23 Mar 2023 |
| Building plan approvalFile: OC Plan Typical Floor.pdf | 23 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: OC Plan Layout.pdf | 23 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: OC Plan Parking.pdf | 23 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: OC Plan Lower Ground.pdf | 23 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: OC Plan Upper Ground.pdf | 23 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: OC Plan Stilt.pdf | 23 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: OC Plan Typical Floor.pdf | 23 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: OC Plan Sections.pdf | 23 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: OC Plan Section 1.pdf | 23 Mar 2023 |
| Details of encumbrancesFile: Self Declaration for Finance with CERSAI.pdf | 22 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 22 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure Sold Units.pdf | 22 Mar 2023 |
| CERSAI detailsFile: CERSAI Debtor Report.pdf | 22 Mar 2023 |
| CERSAI detailsFile: CERSAI Security Interest Report.pdf | 22 Mar 2023 |
| CERSAI detailsFile: CERSAI Security Interest 1 Report.pdf | 22 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf | 22 Mar 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: D WING OC Certificate 03032023.pdf | 22 Mar 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 22 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPL06032023.pdf | 21 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPL10032023.pdf | 21 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPL13032023.pdf | 21 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPL15032023.pdf | 21 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPL17032023.pdf | 21 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPL20032023.pdf | 21 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLRERA08022023.pdf | 1 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLRERA17022023.pdf | 1 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLLetter RERA04022023.pdf | 4 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLLetter RERA23012023.pdf | 4 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLRERALTRFT02012023.pdf | 21 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLRERALTRFT09012023.pdf | 21 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLRERALTRFT13012023.pdf | 21 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 190123.pdf | 20 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 190123.pdf | 20 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure 190123.pdf | 20 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 190123.pdf | 20 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLLetterRERA02012023.pdf | 4 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLLetter RERA21122022.pdf | 31 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLLetterRERA23122022.pdf | 31 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLLetterRERA29122022.pdf | 31 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLLetter RERA31122022.pdf | 31 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NMIPL-Index of Charge MCA Services.pdf | 20 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLLetterRERAFT09122022.pdf | 15 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLLetter RERA12122022.pdf | 15 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLLetterFT18112022.pdf | 8 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLLetterFT23112022.pdf | 8 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLLetterFT30112022.pdf | 8 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLLetterFT06122022.pdf | 8 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLLetterRERA051122.pdf | 22 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLLetterRERA211122.pdf | 22 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLLetterFT161122.pdf | 17 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLRERA28102022.pdf | 29 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 011022.pdf | 19 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 041022.pdf | 19 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure 191022.pdf | 19 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 171022.pdf | 19 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLLtrFT14102022.pdf | 15 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLLetterFTRERA03102022.pdf | 6 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLLetterFTRERA-28092022.pdf | 30 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLLetterFTRERA-29092022.pdf | 30 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLLetterFTRERA-29092022-.pdf | 30 Sep 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form - 5.pdf | 30 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLLetterRERA20092022.pdf | 21 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BPPLRERAFTLTR17092022.pdf | 19 Sep 2022 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Neelkanth Enclave C Wing - Arihant | LBS Road Opposite Shreyas Cinema Ghatkopar West. Mumbai - 400086 | 47 | Completed | Nov 2019 | Jan 2019 |
| Bhaveshwar Arcade Annexe | LBS Road Opposite Shreyas Cinema Ghatkopar West. Mumbai 400086 | 130 | Completed | Nov 2018 | Oct 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 184 filed documents as one ZIP, foldered, with a manifest
Keep Neelkanth Enclave D Wing Siddhartha on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ghatkopar6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 269 registered projects within 2 km.
Atul Life Phase I
ATUL PROJECTS INDIA PVT LTD
SERENE CITY
SANGHVI BUILDTECH LLP
Neelyog Regent
Ratan Builders
Imperial Indrapuram B & C
Imperial Global Infra
HERITAGE AHURA RESIDENCY
KERSI JAMSHED RANDERIA
O AND S BUSINESS SUITES
SUCHITA ORANGE HDM PROJECT
See every Mumbai Suburban project, with the district possession charts
Builder: Bhaveshwar Properties Pvt Ltd
Bhaveshwar Properties Pvt Ltd has 3 registrations on MahaRERA, including Bhaveshwar Arcade Annexe and Neelkanth Enclave C Wing Arihant. Its filings disclose 5 earlier MahaRERA projects: declares 4 of 5 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Neelkanth Enclave D Wing Siddhartha is delayed beyond 30 Jun 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Neelkanth Enclave D Wing Siddhartha?
The registered promoter entity is Bhaveshwar Properties Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Neelkanth Enclave D Wing Siddhartha?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Neelkanth Enclave D Wing Siddhartha?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Neelkanth Enclave D Wing Siddhartha?
The professionals named in the filing: Architect: Daisaria Associates Shri Manoj V Daisaria; Architect: Architect Hafeez Contractor; Engineer: Dharmendra K Upadhyay; Chartered Accountant: Jinesh Mota & Co; Chartered Accountant: Gyaneshwar Kataram & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Neelkanth Enclave D Wing Siddhartha?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback