ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / NEELAM CHS LTD

Completed No litigation declared Residential / Group Housing project

NEELAM CHS LTD

By Sapriya Developers

RG-MH-18315 · RERA P51800076794 · Last updated on MahaRERA portal: 2 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2026Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
16 of 24Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

NEELAM CHS LTD is a Residential / Group Housing project by Sapriya Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800076794 on 28 Jun 2024. The registration is recorded completed; possession was promised by 21 Sep 2026. 8 of the 24 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameNEELAM CHS LTD
  • TypeResidential / Group Housing
  • Location
    • RAVI MAHAJAN RD
    • KANDIVALI WEST
    • Kandivali
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800076794
  • ReraGenie IDRG-MH-18315

Builder

  • NameSapriya Developers
  • Entity typePartnership
  • PartnersManoj Bipinchandra Kamdar, Ramji Premji Vira, Umesh Dattatray Naik, Shailesh Nemchand Gada, Nikunj Pankaj Shah
  • Other registrations3 more →
  • Completed3 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredJun 2024PromisedSep 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Jun 2024
  • Promised completion21 Sep 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Current status

33%8 of 24 units booked
100.0%Work done, per cost certificate

Figures as on 2 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NEELAM CHS LTDNA101024024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

NEELAM CHS LTD: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 2 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed21

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots21
Closed/Covered21

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area476 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Dec 2025
LandownerVillageDistrict
Neelam CHS LtdKandivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1284.25
Proposed, not sanctioned1,284 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFirst Floor Nand Dham MG Cross Road No 1 Kandivili West Mumbai 400067
Estimated costRs 6.00 cr
Cost incurredRs 6.00 cr
Work done100.0%
BuildingWingEstimatedIncurred
NEELAM CHS LTDNARs 5.00 crRs 5.00 cr
-NARs 1.00 crRs 1.00 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectV M Associates
EngineerATUL VISARIA
EngineerChandrash Chheda
Chartered AccountantP R AND CO LLP
Chartered AccountantMUKESH M CHOKSI & CO
PartnerRole in project
Sapriya Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: NEELAM - FORM 1 - Q3.pdf2 Jun 2026
Withdrawal Update Form 2File: NEELAM - FORM 2 - Q3.pdf2 Jun 2026
Withdrawal Update Form 3File: NEELAM - FORM 3 - Q3.pdf2 Jun 2026
Occupational CertificateFile: NEELAM - OC signed.pdf2 Jun 2026
Withdrawal Update Form 1File: NEELAM - FORM 1 - Q3.pdf20 Jan 2026
Withdrawal Update Form 2File: NEELAM - FORM 2 - Q3.pdf20 Jan 2026
Withdrawal Update Form 3File: NEELAM - FORM 3 - Q3.pdf20 Jan 2026
Form 2A (FY 2024-2025)File: Neelam - form 2A (1).pdf22 Dec 2025
Form 1File: Neelam - Form 1.pdf27 Nov 2025
Form 2File: NEELAM - FORM 2-3.pdf27 Nov 2025
Form 3File: CA Certificate Form 3 Sapriya Developers-1.pdf27 Nov 2025
Disclosure of Sold and Booked InventoryFile: Neelam Inventory.pdf27 Nov 2025
Form 1File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1) 1.pdf20 Nov 2025
Form 2File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf20 Nov 2025
Form 3File: 1 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: 1 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf20 Nov 2025
Form 1File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf20 Nov 2025
Form 2File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2) 2.pdf20 Nov 2025
Form 3File: 1 CA Certificate on Project Cost & Fund withdrawal (Form 3) 2.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: 1 CA Certificate on Project Cost & Fund withdrawal (Form 3) 2.pdf20 Nov 2025
Form 1File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1) 3.pdf20 Nov 2025
Form 2File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2) 3.pdf20 Nov 2025
Form 3File: 1 CA Certificate on Project Cost & Fund withdrawal (Form 3) 3.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: 1 CA Certificate on Project Cost & Fund withdrawal (Form 3) 3.pdf20 Nov 2025
Form 1File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1) 4.pdf20 Nov 2025
Form 2File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2) 4.pdf20 Nov 2025
Form 3File: 1 CA Certificate on Project Cost & Fund withdrawal (Form 3) 4.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: 1 CA Certificate on Project Cost & Fund withdrawal (Form 3) 4.pdf20 Nov 2025
Form 1File: NEELAM - FORM - 1.pdf25 Aug 2025
Form 2File: NEELAM - FORM -2.pdf25 Aug 2025
Form 3File: Neelam - Form - 3.pdf25 Aug 2025
Disclosure of Sold and Booked InventoryFile: Neelam Inventory.pdf25 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Neelam Form 1.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Neelam Form 3.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Neelam Form 2.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NEELAM - FORM 1-2.pdf22 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form -3 Neelam CHS Ltd 19-02-25.pdf22 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEELAM - FORM 2-2.pdf22 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NEELAM - Form 1-1.pdf23 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NEELAM - FORM 3.pdf23 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEELAM - Form 2-1.pdf23 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NEELAM - FORM 1.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEELAM - FORM 2.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Neelam co op Housing society.pdf13 Aug 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Neelam Rera.pdf25 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NEELAM FORM 3.pdf3 Jun 2024
Proforma of Agreement for saleFile: Neelam - Agreement for Sale.pdf22 May 2024
Proforma of Allotment letterFile: NEELAM - FLAT ALLOTMENT LETTER.pdf22 May 2024
Deviation Report with respect to Allotment letterFile: Deviation on allotment letter.pdf22 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report in Agreement for Sale.pdf22 May 2024
Building plan approvalFile: Neelam - Amended IOD.pdf16 May 2024
Building plan approvalFile: Neelam - IOD.pdf16 May 2024
Layout approvalFile: Layout.pdf16 May 2024
PAN CardFile: 1 PAN Card.pdf16 May 2024
Copy of the legal title reportFile: Neelam RERA Title Certificate 9-05-24.pdf16 May 2024
Details of encumbrances concerned to FinanceFile: NEELAM - Declaration For Financial Encumbrance.pdf16 May 2024
Details of encumbrances concerned to FinanceFile: NEELAM - Declaration For Legal Encumbrance.pdf16 May 2024
Details of encumbrances concerned to FinanceFile: NEELAM - Non Encumbrance Certificate.pdf16 May 2024
Details of encumbrances concerned to LegalFile: NEELAM - Declaration For Financial Encumbrance.pdf16 May 2024
Details of encumbrances concerned to LegalFile: NEELAM - Declaration For Legal Encumbrance.pdf16 May 2024
Details of encumbrances concerned to LegalFile: NEELAM - Non Encumbrance Certificate.pdf16 May 2024
Copy of Layout Approval (in case of layout)File: Layout.pdf16 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Neelam - Amended IOD.pdf16 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Neelam - IOD.pdf16 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Neelam - First CC.pdf16 May 2024
Declaration about Commencement CertificateFile: NEELAM - Declaration About Commencement Certificate 0N LETTER HEAD.pdf16 May 2024
Declaration in FORM BFile: NEELAM - AFFIDAVIT CUM DECLATION.pdf16 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Neelam RERA Form 1.pdf16 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Neelam RERA Form 2.pdf16 May 2024
CERSAI detailsFile: NEELAM - Undertaking Cersai Declaration.pdf16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: MBK - Disclosure of Interest.pdf16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: SNG - Disclosure of Interest.pdf16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: RPV - Disclosure of Interest.pdf16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: SNG - Disclosure of Interest.pdf16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: UDN - Disclosure of Interest.pdf16 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DECLARATION.pdf16 May 2024
Other - LegalFile: NEELAM - Declaration Cum Undertaking-multipl reg.pdf16 May 2024
Other - LegalFile: NEELAM - POA.pdf16 May 2024
Other - LegalFile: NEELAM - Authority Letter TO MANOJ KAMDAR.pdf16 May 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Municipal Employees Sudhanshu CHS LtdM G RD Kandivali West31CompletedJul 2024Apr 2024
KANDIVALI RIDDHI CHS LTDDahanukarwadi kandivali west25CompletedJan 2021Sep 2020

How this compares with Mumbai Suburban

33%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NEELAM CHS LTD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KANDIVALI WEST6,700+ in Mumbai Suburban

Builder: Sapriya Developers

SAPRIYA DEVELOPERS has 4 registrations on MahaRERA, including KANDIVALI RIDDHI CHS and MUNICIPAL EMPLOYEES SUDHANSHU CHS LTD. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if NEELAM CHS LTD is delayed beyond 21 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEELAM CHS LTD?

The registered promoter entity is Sapriya Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEELAM CHS LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NEELAM CHS LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NEELAM CHS LTD?

The professionals named in the filing: Architect: V M Associates; Engineer: ATUL VISARIA; Engineer: Chandrash Chheda; Chartered Accountant: P R AND CO LLP; Chartered Accountant: MUKESH M CHOKSI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEELAM CHS LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEELAM CHS LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEELAM CHS LTD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.