ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / Neel City

Registered No litigation declared Others project

Neel City

By Neilgagaan Consttruction

RG-MH-82487 · RERA P50500053953 · Last updated on MahaRERA portal: 13 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Oct 2029Possession promisedno revision filed
14 of 66Construction stages doneacross 6 buildings; furthest along: Excavation, 98%
28 of 44Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

Neel City is a Others project by Neilgagaan Consttruction in Nagpur, Maharashtra, registered with MahaRERA as P50500053953 on 18 Dec 2023. Possession is promised by 5 Oct 2029. 16 of the 44 units on this registration are recorded sold or booked, and 14 of 66 construction stages are filed complete.

At a glance

Project

  • NameNeel City
  • TypeOthers
  • Location
    • Hingna Road
    • Isasani
    • Isasani (CT)
    • Hingna
    • Nagpur
    • 440019
  • Pincode440019
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500053953
  • ReraGenie IDRG-MH-82487

Builder

  • NameNeilgagaan Consttruction
  • Entity typePartnership
  • GSTIN27AASFN5457E1ZU
  • PartnersJitendra Chaganlal Jain, Manjula Mahendra Jain, Rahul Rajendra Jain, Nirmala Mohanlal Jain
  • Declared earlier projects2 →

Key dates

this monthRegisteredDec 2023PromisedOct 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Dec 2023
  • Promised completion5 Oct 2029
  • Revised completionNone
  • Buildings6 building records
  • Documents filed103 files

Current status

36%16 of 44 units booked
50.8%Work done, per cost certificate

Figures as on 13 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building no 1NA447613
Building no 2NA22606
Building no 3NA22606
Building no 4NA22606
Building no 7NA22808
Building no 8NA22505

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 13 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Excavation, at 98%.

Building no 117%
ActivityProgress
Excavation98%
Basement (if any)0%
Podiums (if any)0%
Plinth92%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building no 225%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building no 362%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
Building no 460%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
Building no 760%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
Building no 80%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes50%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes55%
Open ParkingYes0%

Parking filed7

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots7
Closed/Covered1
Open Space6
BuildingClosed/CoveredOpen SpaceTotal
Building no 1112
Building no 2011
Building no 3011
Building no 4011
Building no 7011
Building no 8011

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,090 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 Aug 2025
LandownerVillageDistrict
NEILGAGAAN CONSTRUCTIONSIsasani (CT)Nagpur
Manjula Mahendra JainNagpur (M Corp.)Nagpur
Nirmala Mohanlal JainNagpur (M Corp.)Nagpur
Rahul Rajendra JainNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNAGPUR METROPOLITAN REGION DEVELOPMENT AUTHORITY
Permissible FSI8963.17
Proposed, not sanctioned4,724 sq m
Buildings approved9
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBrijbhumi Complex, Near Telephone Exchange Square Nagpur-440008
Estimated costRs 14.55 cr
Cost incurredRs 7.39 cr
Work done50.81%
BuildingWingEstimatedIncurred
Building no 1NARs 3.20 crRs 57.63 lakh
Building no 7NARs 2.53 crRs 1.72 cr
Building no 2NARs 2.03 crRs 88.45 lakh
Building no 3NARs 2.01 crRs 1.95 cr
Building no 4NARs 1.92 crRs 1.46 cr
-NARs 1.50 crRs 40.23 lakh
Building no 8NARs 1.36 crRs 39.73 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANDIP PANDIT
EngineerVIKESH MESHRAM
EngineerAVINASH THOTE
Chartered AccountantMANISH WATMODE & ASSOCIATES
Chartered AccountantThakkar Associates
PartnerRole in project
Neilgagaan Consttruction-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 5 Oct 2029

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: neel city .pdf13 Jul 2026
Withdrawal Update Form 2File: neel city 2.pdf13 Jul 2026
Withdrawal Update Form 3File: Scan2026-07-11_114056.pdf13 Jul 2026
Withdrawal Update Form 1File: Scan2026-03-12_121051.pdf16 Mar 2026
Withdrawal Update Form 2File: Scan2026-03-12_120545.pdf16 Mar 2026
Withdrawal Update Form 3File: Scan2026-03-12_115409.pdf16 Mar 2026
Withdrawal Update Form 1File: NEEL CITY FORM 1.pdf8 Dec 2025
Withdrawal Update Form 2File: NWWL CITY FORM 2.pdf8 Dec 2025
Withdrawal Update Form 3File: form 3 of neel city.pdf8 Dec 2025
Withdrawal Update Form 1File: NEEL CITY FORM 1.pdf7 Dec 2025
Withdrawal Update Form 2File: NWWL CITY FORM 2.pdf7 Dec 2025
Withdrawal Update Form 3File: form 3 of neel city.pdf7 Dec 2025
Form 2A (FY 2024-2025)File: form 2a neel city.pdf7 Dec 2025
Form 1File: NEEL CITY FORM 1.pdf3 Dec 2025
Form 2File: FORM 2 NEEL CITY.pdf3 Dec 2025
Form 3File: neel city form 3.pdf3 Dec 2025
Disclosure of Sold and Booked InventoryFile: neel city form 3.pdf3 Dec 2025
Withdrawal Update Form 1File: NEEL CITY FORM 1.pdf3 Dec 2025
Withdrawal Update Form 1File: NEEL CITY FORM 1.pdf3 Dec 2025
Withdrawal Update Form 1File: NEEL CITY FORM 1.pdf3 Dec 2025
Withdrawal Update Form 1File: NEEL CITY FORM 1.pdf3 Dec 2025
Withdrawal Update Form 1File: NEEL CITY FORM 1.pdf3 Dec 2025
Withdrawal Update Form 2File: NWWL CITY FORM 2.pdf3 Dec 2025
Withdrawal Update Form 2File: NWWL CITY FORM 2.pdf3 Dec 2025
Withdrawal Update Form 2File: NWWL CITY FORM 2.pdf3 Dec 2025
Withdrawal Update Form 2File: NWWL CITY FORM 2.pdf3 Dec 2025
Withdrawal Update Form 2File: NWWL CITY FORM 2.pdf3 Dec 2025
Withdrawal Update Form 3File: neel city form 3.pdf3 Dec 2025
Withdrawal Update Form 3File: neel city form 3.pdf3 Dec 2025
Withdrawal Update Form 3File: neel city form 3.pdf3 Dec 2025
Withdrawal Update Form 3File: neel city form 3.pdf3 Dec 2025
Withdrawal Update Form 3File: neel city form 3.pdf3 Dec 2025
Form 5 (FY 2024-2025)File: form 5.pdf3 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Scan2025-05-06_111754.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan2025-05-06_112801.pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Scan2025-05-06_111029.pdf6 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Scan2025-05-06_112330.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan2025-02-04_104801.pdf4 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan2025-02-03_120415.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Scan2025-02-01_105149.pdf1 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Scan2025-02-01_105827.pdf1 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Scan2025-02-01_110109.pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 neelcity.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: form 5 neil.pdf14 Oct 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank declaration.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 neil.pdf14 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: bank sbi.pdf14 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: disclosure.pdf14 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: CA Declaration.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: Scanned_20240814-1758.pdf14 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Scanned_20240812-1341.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Scanned_20240812-1341.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Scanned_20240812-1342-2.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Scanned_20240812-1342.pdf12 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Scanned_20240812-1341.pdf12 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Scanned_20240812-1342-2.pdf12 Aug 2024
Disclosure of sold/ booked inventoryFile: Scanned_20240812-1342-2.pdf12 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scanned_20240810-1619_compressed.pdf12 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scanned_20240810-1619_compressed.pdf10 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DocScanner 26-Jul-2024 12-17 pm.pdf26 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: img184.pdf22 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: img153.pdf20 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: img169.pdf20 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: img156.pdf20 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: img172.pdf20 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: img159.pdf20 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: img161.pdf20 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: img161.pdf20 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: img175.pdf20 Jun 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE REPORT.pdf1 Dec 2023
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE REPORT.pdf1 Dec 2023
Other - LegalFile: Declaration Manjula and Nirmala.pdf1 Dec 2023
Other - TechnicalFile: Declaration and plan.pdf3 Nov 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance Report.pdf28 Sep 2023
Details of encumbrances concerned to LegalFile: No Encumbrance Report.pdf28 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf20 Jul 2023
Building plan approvalFile: Building No 2 Plan.pdf19 Jul 2023
Building plan approvalFile: Building No 3 Plan.pdf19 Jul 2023
Building plan approvalFile: Building No 4 plan.pdf19 Jul 2023
Building plan approvalFile: Building No 7 plan.pdf19 Jul 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
NEEL VIHAR 2P50500024745NARSALA, Nagpur70Mar 2020OngoingDec 2031Not due yet
NEEL VIHAR 1p50500019918Khasara no 5 Narsala Nagpur 44003418-OngoingMar 2025Not delivered

How this compares with Nagpur

36%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Neel City on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Isasani2,800+ in Nagpur

2 kmNeel CityCompleted 3Lapsed / revoked 5Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 22 registered projects within 2 km.

Builder: Neilgagaan Consttruction

Neilgagaan Consttruction has 1 registration on MahaRERA, including Neel City. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Neel City is delayed beyond 5 Oct 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Neel City?

The registered promoter entity is Neilgagaan Consttruction, a partnership as per the filing. Its GSTIN 27AASFN5457E1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Neel City?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Neel City?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Neel City?

The professionals named in the filing: Architect: SANDIP PANDIT; Engineer: VIKESH MESHRAM; Engineer: AVINASH THOTE; Chartered Accountant: MANISH WATMODE & ASSOCIATES; Chartered Accountant: Thakkar Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Neel City?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Neel City. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Neel City to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.