Home / Browse projects / Nagpur, Maharashtra / Devikar Land Developer Phase-II

Registration lapsed No litigation declared Plotted project

Devikar Land Developer Phase-II

By Devikar Land Developer

RG-MH-03941 · RERA P50500032835 · Last updated on MahaRERA portal: 12 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 19 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2025Possession promised19 months past this date
55 of 105Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

Devikar Land Developer Phase-II is a Plotted project by Devikar Land Developer in Nagpur, Maharashtra, registered with MahaRERA as P50500032835 on 2 Feb 2022. Possession was promised by 31 Mar 2025 and is now 19 months past that date. 50 of the 105 units on this registration are recorded sold or booked.

At a glance

Project

  • NameDevikar Land Developer Phase-II
  • TypePlotted
  • Location
    • Khasara No. 140
    • 165/1(Part)
    • 165/3(Part)
    • Wanadongri
    • Hingna
    • Nagpur
    • 440019
  • Pincode440019
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500032835
  • ReraGenie IDRG-MH-03941

Builder

  • NameDevikar Land Developer
  • Entity typePartnership
  • PartnersPandit Shankarrao Devikar, Shilla Pandit Devikar, Kirti Pandit Devikar, Pragati Pandit Devikar, Nisha Prakash Asatkar, Mahesh Dadarao harne, Shilpa Devendra Taori
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

19 months past promisethis monthRegisteredFeb 2022PromisedMar 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on2 Feb 2022
  • Promised completion31 Mar 2025
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed64 files

Current status

48%50 of 105 units booked

Figures as on 12 Feb 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities16

As on 12 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes97%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Fencing for Open SpaceYes100%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area17,689 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNAGAR PARISHAD WANADONGARI

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch340, New Subhedar Layout, Nagpur-440024

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMahesh D Padole
EngineerMahesh D Padole
Chartered AccountantPriyanka Singh
Chartered AccountantDEVENDRA BRIJMOHAN TAORI
PartnerRole in project
Devikar Land Developer-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Dec 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 24_11zon.pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 24_11zon.pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sep 24_11zon.pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jun 24_11zon.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 24_11zon.pdf12 Feb 2025
Disclosure of sold/ booked inventoryFile: Inventory Dec 24_11zon.pdf12 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From1 March2024.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From1 june2024.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From1 Sept2024.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From1 Dec2023.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From1 March2023.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From1 June2023.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From1 Sept2023.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From1 Dec2023.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From1 March2024.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From1 june2024.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From1 Sept2024.pdf16 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From3 March 2024_compressed.pdf16 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From3 Dec2023_compressed.pdf16 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From3 sept2023_compressed.pdf16 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From3 June2023_compressed.pdf16 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From3 March2023_compressed.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From2 sept2024.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From2 june2024.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From2 March2024.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From2 Dec2023.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From2 Sept2023.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From2 June2023.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From2 March2023.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: Inventory March2023.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: Inventory June2023.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: Inventory sept2023.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: Inventory Dec2023.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: Inventory March2024.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: Inventory June2024.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: Inventory sept2024.pdf16 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: From5 March2023.pdf16 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: From 5 March 2024.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY 21-22 Q4.pdf23 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY 22-23 Q1.pdf23 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY 22-23 Q2.pdf23 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY 22-23 Q3_11zon.pdf23 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FY 21-22 Q4_11zon.pdf23 Dec 2023
Disclosure of sold/ booked inventoryFile: Inventory FY 21-22 Q4.pdf23 Dec 2023
Disclosure of sold/ booked inventoryFile: Inventory FY 22-23 Q1.pdf23 Dec 2023
Disclosure of sold/ booked inventoryFile: Inventory FY 22-23 Q2.pdf23 Dec 2023
Disclosure of sold/ booked inventoryFile: Inventory FY 22-23 Q3.pdf23 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 21-22 Q4_11zon.pdf23 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 22-23 Q1_11zon.pdf23 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 22-23 Q2.pdf23 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 22-23 Q3.pdf23 Dec 2023
Copy of the legal title reportFile: Legal Title Report-Final.pdf27 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate-Gov Authority.pdf27 Jan 2022
CERSAI detailsFile: CERSAI-Report.pdf27 Jan 2022
Declaration about Commencement CertificateFile: DLD-P-II-Declaration of Commentment.pdf13 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate.pdf13 Jan 2022
Building plan approval or NA orderFile: NA Certificate.pdf24 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: NA Certificate.pdf24 Dec 2021
Layout approvalFile: Sanctioned Map.pdf22 Dec 2021
Details of encumbrancesFile: Certificate of Encumbrances.pdf22 Dec 2021
Copy of Layout Approval (in case of layout)File: Sanctioned Map.pdf22 Dec 2021
Declaration in FORM BFile: Form-B.pdf22 Dec 2021
Proforma of Allotment letterFile: Proforma of Allotment Letter.pdf22 Dec 2021
Proforma of Allotment letterFile: Sample Agreement to Sale.pdf22 Dec 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Devikar Land DeveloperP50500025728Shankarpura, Nagpur21Jul 2020Certificate SignedSep 2022Sep 2022

How this compares with Nagpur

48%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is among them

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Devikar Land Developer Phase-II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wanadongri2,800+ in Nagpur

2 kmDevikar Land Developer PCompleted 10Lapsed / revoked 3Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 39 registered projects within 2 km.

Builder: Devikar Land Developer

Devikar Land Developer has 2 registrations on MahaRERA, including Devikar Land Developer and Devikar Land Developer Phase-II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What does it mean that Devikar Land Developer Phase-II shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Devikar Land Developer Phase-II is delayed beyond 31 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Devikar Land Developer Phase-II?

The registered promoter entity is Devikar Land Developer, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Devikar Land Developer Phase-II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Devikar Land Developer Phase-II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Devikar Land Developer Phase-II?

The professionals named in the filing: Architect: Mahesh D Padole; Engineer: Mahesh D Padole; Chartered Accountant: Priyanka Singh; Chartered Accountant: DEVENDRA BRIJMOHAN TAORI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Devikar Land Developer Phase-II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Devikar Land Developer Phase-II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Devikar Land Developer Phase-II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.