Home / Browse projects / Mumbai Suburban, Maharashtra / Navnath Nandikesh
Navnath Nandikesh
By Navnath Infrastructures Private Limited
RG-MH-19306 · RERA P51800078399 · Last updated on MahaRERA portal: 18 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 6.50 crore secured on the land, in favour of State Bank of lndia
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Navnath Nandikesh is a Residential / Group Housing project by Navnath Infrastructures Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800078399 on 11 Dec 2024. Possession is promised by 31 Dec 2027. 15 of the 36 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameNavnath Nandikesh
- TypeResidential / Group Housing
- Location
- Naikwadi Lane
- Goregaon East
- Pahadi-Goregaon
- Borivali
- Mumbai Suburban
- 400063
- Pincode400063
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800078399
- ReraGenie IDRG-MH-19306
Builder
- NameNavnath Infrastructures Private Limited
- Entity typeCompany
- DirectorsNeelam Vaibhav Joshi, Shardool Vaibhav Joshi
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Dec 2024
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed57 files
Current status
Figures as on 18 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Navnath Nadikesh | NA | 14 | 13 | 36 | 0 | 36 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 40%.
Navnath Nadikesh: 50% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 10% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed36
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Nandikesh Co-operative housing society Limited | Pahadi-Goregaon | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Navnath Nadikesh | NA | Rs 11.00 cr | Rs 6.60 cr |
| - | NA | Rs 50.00 lakh | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Tangent Architects and Interior Designers |
| Engineer | R C Tipnis |
| Chartered Accountant | Ms Gaurav S Rajpal and CO |
| Chartered Accountant | ANKS & CO Chartered Accountants |
| Chartered Accountant | A N K S & Co. |
| Partner | Role in project |
|---|---|
| Navnath Infrastructures Private Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Dec 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Nov 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Nov 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed57
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Nandikesh Form 1.pdf | 18 Apr 2026 |
| Withdrawal Update Form 2File: Nandikesh Form 2.pdf | 18 Apr 2026 |
| Withdrawal Update Form 3File: Nandikesh Form 3 - Signed.pdf | 18 Apr 2026 |
| Form 1File: Form 1 Q3 FY 25-26.pdf | 18 Jan 2026 |
| Form 2File: Form 2 Q3 FY 25-26.pdf | 18 Jan 2026 |
| Form 3File: Nandikesh Form 3 for Q3 FY 25-26_V1 Signed.pdf | 18 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory Q3 of FY 25-26.pdf | 18 Jan 2026 |
| Form 1File: Form 1 Nandikesh.pdf | 19 Oct 2025 |
| Form 2File: Form 2 Nandikesh.pdf | 19 Oct 2025 |
| Form 3File: Nandikesh Form 3 V1-Signed.pdf | 19 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory Nandikesh.pdf | 19 Oct 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 - NANDIKESH Signed.pdf | 29 Sep 2025 |
| Form 1File: Form_1.pdf | 17 Jul 2025 |
| Form 2File: Form 2.pdf | 17 Jul 2025 |
| Form 3File: Nandikesh Form 3-Signed.pdf | 17 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Nandikesh Disclosure of Sold Inventory.pdf | 17 Jul 2025 |
| Form 2A (FY 2024-2025)File: NAVNATH INFRASTRUCTURES PVT.LTD. NANDIKESH 2024-25.pdf | 26 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Navnath Nandikesh.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_Form-3.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_Form -3.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Navnath Nandikesh.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Certificate Maha RERA 10_02_2025.pdf | 21 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 V1_Signed.pdf | 21 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: First Form - 2 Nandikesh 7-2-2025.pdf | 21 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Certificate Maha RERA 10_02_2025.pdf | 21 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 V1_Signed.pdf | 21 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: First Form - 2 Nandikesh 7-2-2025.pdf | 21 Feb 2025 |
| PAN CardFile: NIPL_PAN_CARD.pdf | 3 Dec 2024 |
| Copy of the legal title reportFile: Samir vaidya revised title report for RERA.pdf | 3 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Final_compressed.pdf | 26 Nov 2024 |
| Other - LegalFile: Annexure A_Signed.pdf | 26 Nov 2024 |
| Declaration about Commencement CertificateFile: Format D_Signed.pdf | 26 Nov 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Updated.pdf | 26 Nov 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report Agreement for Sale_v1.pdf | 26 Nov 2024 |
| Proforma of Agreement for saleFile: NEW AFS_Updated_V1.pdf | 26 Nov 2024 |
| Building plan approvalFile: Drawing_Page 4_7.pdf | 25 Nov 2024 |
| Building plan approvalFile: Drawing_Page 2_3.pdf | 25 Nov 2024 |
| Building plan approvalFile: Drawing_Page 1.pdf | 25 Nov 2024 |
| Layout approvalFile: Layout Plan compressed.pdf | 25 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: Non Encumberance - Finance.pdf | 25 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: Non Encumbrances - Legal.pdf | 25 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: Layout Plan compressed.pdf | 25 Nov 2024 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 25 Nov 2024 |
| Declaration in FORM BFile: Form B.pdf | 25 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 25 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 25 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 25 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing_Page 2_3.pdf | 25 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing_Page 1.pdf | 25 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing_Page 4_7.pdf | 25 Nov 2024 |
| CERSAI detailsFile: Cersai Declaration.pdf | 25 Nov 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report Allotment Letter.pdf | 25 Nov 2024 |
| Details of encumbrances concerned to LegalFile: Non Encumberance - Finance.pdf | 25 Nov 2024 |
| Details of encumbrances concerned to LegalFile: Non Encumbrances - Legal.pdf | 25 Nov 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf | 25 Nov 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf | 25 Nov 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Secured and unsecured finance.pdf | 25 Nov 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 57 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Navnath Nandikesh on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Goregaon East6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 360 registered projects within 2 km.
Elysian Tower C, D, E
Oberoi Realty Limited
Elysian Tower B
Oberoi Realty Limited
Elysian Tower A
Oberoi Realty Limited
Sheetal Sangam
DGS Township Pvt Ltd
SEJAL SQUARE
ALCHEMI DEVELOPERS PRIVATE LIMITED
Mehta Marquina 1978
Shreeram Builders
See every Mumbai Suburban project, with the district possession charts
Builder: Navnath Infrastructures Private Limited
Navnath Infrastructures Private Limited has 2 registrations on MahaRERA, including Navnath Jayas and Navnath Nandikesh. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Navnath Nandikesh is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Navnath Nandikesh?
The registered promoter entity is Navnath Infrastructures Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Navnath Nandikesh?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Navnath Nandikesh?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Navnath Nandikesh?
The professionals named in the filing: Architect: Tangent Architects and Interior Designers; Engineer: R C Tipnis; Chartered Accountant: Ms Gaurav S Rajpal and CO; Chartered Accountant: ANKS & CO Chartered Accountants; Chartered Accountant: A N K S & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Navnath Nandikesh?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback