Home / Browse projects / Nagpur, Maharashtra / NARMADA VIHAR-9

Completed No litigation declared Plotted project

NARMADA VIHAR-9

By SHARMA CONSTRUCTION COMPANY

RG-MH-32090 · RERA P50500080235 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 4 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedregistration recorded completed
15 of 45Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

NARMADA VIHAR-9 is a Plotted project by SHARMA CONSTRUCTION COMPANY in Nagpur, Maharashtra, registered with MahaRERA as P50500080235 on 9 May 2025. The registration is recorded completed; possession was promised by 31 Dec 2029. 30 of the 45 units on this registration are recorded sold or booked.

At a glance

Project

  • NameNARMADA VIHAR-9
  • TypePlotted
  • Location
    • MBA College Road
    • Rui
    • Nagpur (Rural)
    • Nagpur
    • 441108
  • Pincode441108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500080235
  • ReraGenie IDRG-MH-32090

Builder

  • NameSHARMA CONSTRUCTION COMPANY
  • Entity typePartnership
  • PartnersRITESH RADHESHYAM SHARMA, Aditya Ritesh Sharma, Raghav Ritesh Sharma, Akash Umesh Sharma, Umesh Radheshyam Sharma
  • Other registrations3 more →
  • Completed4 of 4
  • Declared earlier projects7 →

Key dates

this monthRegisteredMay 2025PromisedDec 2029Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 May 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed73 files

Current status

67%30 of 45 units booked

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area10,500 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Jul 2025

Approvals and building plan

Sanctioning authorityNMRDA

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1ST FLR,SITARAM SMRUTI,WEST HIGHCOURT RD, LAXMIBHAVAN SQ ,DHARAMPETH

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUmesh Lamge
EngineerHItendra Sharma
Chartered AccountantPrashant Sharma
Chartered AccountantSUBHASH RAHANGDALE
PartnerRole in project
SHARMA CONSTRUCTION COMPANY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Mar 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Apr 2026

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Completion CertificateFile: OC Mail NMRDA to Rera.pdf28 Apr 2026
Completion CertificateFile: COmpletion Certificate NMRDA.pdf18 Apr 2026
Completion CertificateFile: Completion certificate ARch Form 4.pdf18 Apr 2026
Withdrawal Update Form 1File: Form 1 Arch LH downloaded.pdf15 Apr 2026
Withdrawal Update Form 2File: Form 2 Engr LH downloaded.pdf15 Apr 2026
Withdrawal Update Form 3File: Form 3 CA LH downloaded.pdf15 Apr 2026
Withdrawal Update Form 1File: Form1 ARch LHDownloaded.pdf17 Jan 2026
Withdrawal Update Form 2File: Form2 Enggr LHDownloaded.pdf17 Jan 2026
Withdrawal Update Form 3File: Form3 CA LHdownloaded.pdf17 Jan 2026
Withdrawal Update Form 1File: downloaded arch certi.pdf16 Jan 2026
Withdrawal Update Form 2File: Engr Certi Form 2 DOWNLOADED.pdf16 Jan 2026
Withdrawal Update Form 3File: CA Cert Letter Head Q-2.pdf16 Jan 2026
Withdrawal Update Form 1File: Form-1 Arch Certi Downloaded Q-1.pdf23 Jul 2025
Withdrawal Update Form 2File: Form-2 Engr Certi Downloaded Q-1.pdf23 Jul 2025
Withdrawal Update Form 3File: Form-2 CA Certificate Downloaded Q-1.pdf23 Jul 2025
Withdrawal Update Form 1File: Form-1 Arch Certi Downloaded Q-1.pdf22 Jul 2025
Withdrawal Update Form 2File: Form-2 Engr Certi Downloaded Q-1.pdf22 Jul 2025
Withdrawal Update Form 3File: Form-2 CA Certificate Downloaded Q-1.pdf22 Jul 2025
Withdrawal Update Form 1File: Form-1 Arch Certi Downloaded Q-1.pdf21 Jul 2025
Withdrawal Update Form 2File: Form-2 Engr Certi Downloaded Q-1.pdf21 Jul 2025
Withdrawal Update Form 3File: Form-2 CA Certificate Downloaded Q-1.pdf21 Jul 2025
Declaration and undertaking (Annexure A)File: DECLARATION cum Undertaking Annex-A.pdf19 Jul 2025
Commencement certificateFile: D-3 NMRDA.pdf19 Jul 2025
Withdrawal Update Form 1File: Form-1 Arch Certi Downloaded Q-1.pdf19 Jul 2025
Withdrawal Update Form 1File: Form-1 Arch Certi Downloaded Q-1.pdf19 Jul 2025
Withdrawal Update Form 2File: Form-2 Engr Certi Downloaded Q-1.pdf19 Jul 2025
Withdrawal Update Form 2File: Form-2 Engr Certi Downloaded Q-1.pdf19 Jul 2025
Withdrawal Update Form 3File: Form-2 CA Certificate Downloaded Q-1.pdf19 Jul 2025
Withdrawal Update Form 3File: Form-2 CA Certificate Downloaded Q-1.pdf19 Jul 2025
Withdrawal Update Form 1File: Form-1 Arch Certi Downloaded Q-1.pdf18 Jul 2025
Withdrawal Update Form 2File: Form-2 Engr Certi Downloaded Q-1.pdf18 Jul 2025
Withdrawal Update Form 3File: Form-2 CA Certificate Downloaded Q-1.pdf18 Jul 2025
Withdrawal Update Form 1File: Form-1 Arch Certi Downloaded Q-1.pdf17 Jul 2025
Withdrawal Update Form 2File: Form-2 Engr Certi Downloaded Q-1.pdf17 Jul 2025
Withdrawal Update Form 3File: Form-2 CA Certificate Downloaded Q-1.pdf17 Jul 2025
Withdrawal Update Form 1File: Form-1 Arch Certi Downloaded Q-1.pdf16 Jul 2025
Withdrawal Update Form 2File: Form-2 Engr Certi Downloaded Q-1.pdf16 Jul 2025
Withdrawal Update Form 3File: Form-2 CA Certificate Downloaded Q-1.pdf16 Jul 2025
Declaration and undertaking (Annexure A)File: DECLARATION cum Undertaking Annex-A.pdf10 Jul 2025
Proforma of Allotment letterFile: Allotment_Letter-NARMADA_VIHAR-9.pdf25 Apr 2025
Declaration in FORM BFile: Form B Affidavit Revised.pdf25 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: D-3 NMRDA.pdf25 Apr 2025
Declaration about Commencement CertificateFile: Format D commencement declaration revised.pdf25 Apr 2025
Other - TechnicalFile: CC Mail Revised NMRDA.pdf25 Apr 2025
Other - TechnicalFile: DECLARATION cum Undertaking Annex-A.pdf2 Apr 2025
Proforma of Agreement for saleFile: AGREEMENT 2 sale-NV-9-Rui KH 14-1.pdf2 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: No Finance Disclosure by Promoter.pdf17 Mar 2025
Details of encumbrances concerned to FinanceFile: Legal No Encumberance certi.pdf16 Mar 2025
Other - LegalFile: रुई_14_1_Satbara (1).pdf16 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory.pdf16 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Bank Rera Account declaration Promoter.pdf16 Mar 2025
Deviation Report with respect to Allotment letterFile: Deviation to Allottment Letter.pdf16 Mar 2025
Details of encumbrances concerned to LegalFile: Legal No Encumberance certi.pdf16 Mar 2025
Other - FinanceFile: No Finance Disclosure by Promoter.pdf16 Mar 2025
Other - TechnicalFile: SCC partnership deed 5 partners.pdf16 Mar 2025
Deviation Report with respect to model copy of AgreementFile: Deviation to Agreement to sale.pdf16 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Rera Account Bank Certificate.pdf16 Mar 2025
Copy of the legal title reportFile: Title Search Adv Shastri_11zon.pdf15 Mar 2025
Details of encumbrances concerned to FinanceFile: Financial Encumberance Nil certifiate.pdf15 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARch Certi.pdf15 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Annx D CA Certificate_11zon.pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: For 2 EngR Certi.pdf15 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: NMRDA AGreement_11zon.pdf15 Mar 2025
CERSAI detailsFile: CERSAI_Search_Report_200344651334_For_Asset_Based_Search_12_03_2025_17_08_07_791.pdf15 Mar 2025
CERSAI detailsFile: Cersai Declaration.pdf15 Mar 2025
Details of encumbrances concerned to LegalFile: Financial Encumberance Nil certifiate.pdf15 Mar 2025
Other - TechnicalFile: CC mail frm NMRDA to rera.pdf15 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annex-A Declaration Promoter in other projects.pdf15 Mar 2025
Layout approvalFile: FINAL SANCTION MAP.pdf11 Mar 2025
Building plan approval or NA orderFile: NA SANAD.pdf11 Mar 2025
PAN CardFile: PAN CARD SCC.pdf11 Mar 2025
Copy of Layout Approval (in case of layout)File: FINAL SANCTION MAP.pdf11 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: NA SANAD.pdf11 Mar 2025

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SHIVTIRTH NAGAR - 4P50500033701Near MBA College, Zari village, Grampanchayat Rui, Nagpur Gramin Nagpur, Nagpur217Mar 2022CompletedDec 2027Jul 2023
SHARMA LAY OUT-1P50500020355Vela Hari., Nagpur31Apr 2019CompletedSep 2027Aug 2021
SHARMA LAY OUT - 3P50500023978Vela Hari., Nagpur7Jan 2020CompletedNov 2026Aug 2022
SHARMA LAY OUT - 2P50500023638VELA HARI, Nagpur19Dec 2019CompletedOct 2024Aug 2021

How this compares with Nagpur

67%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NARMADA VIHAR-9 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Rui2,800+ in Nagpur

2 kmNARMADA VIHAR-9Completed 12Lapsed / revoked 6Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 24 registered projects within 2 km.

Builder: SHARMA CONSTRUCTION COMPANY

SHARMA CONSTRUCTION COMPANY has 4 registrations on MahaRERA, including SHARMA LAY OUT-1 and SHARMA LAY OUT - 2. Its filings disclose 7 earlier MahaRERA projects: declares 5 of 7 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if NARMADA VIHAR-9 is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NARMADA VIHAR-9?

The registered promoter entity is SHARMA CONSTRUCTION COMPANY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NARMADA VIHAR-9?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NARMADA VIHAR-9?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NARMADA VIHAR-9?

The professionals named in the filing: Architect: Umesh Lamge; Engineer: HItendra Sharma; Chartered Accountant: Prashant Sharma; Chartered Accountant: SUBHASH RAHANGDALE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NARMADA VIHAR-9?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NARMADA VIHAR-9. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NARMADA VIHAR-9 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.