Home / Browse projects / Thane, Maharashtra / NANDANVAN HOMES BUILDING E
NANDANVAN HOMES BUILDING E
RG-MH-31215 · RERA P51700079549 · Last updated on MahaRERA portal: 10 Mar 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 1 case
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NANDANVAN HOMES BUILDING E is a Others project by SHREE KRUPA BUILDERS in Thane, Maharashtra, registered with MahaRERA as P51700079549 on 11 Mar 2025. Possession is promised by 27 Dec 2030.
At a glance
Project
- NameNANDANVAN HOMES BUILDING E
- TypeOthers
- Location
- 25 M WIDE DP ROAD
- PARSIK NAGAR THANE
- Thane (M Corp.)
- Thane
- 400605
- Pincode400605
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700079549
- ReraGenie IDRG-MH-31215
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Mar 2025
- Promised completion27 Dec 2030
- Revised completionNone
- Buildings1 building record
- Documents filed72 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NANDANVAN HOMES BUILDING E-BLDG E | NA | 10 | 10 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 10 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 80%.
NANDANVAN HOMES BUILDING E-BLDG E: 30% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 60% |
| Slabs of Super Structure | 11% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 10 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed326
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership35
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| PRAKASH PARSHURAM PATIL | Thane (M Corp.) | Thane |
| DILIP THAKURSINGH PATIL | Thane (M Corp.) | Thane |
| VILAS THAKURSINGH PATIL | Thane (M Corp.) | Thane |
| ARUNA UMESH PATIL | Thane (M Corp.) | Thane |
| MIRABAI PARSHURAM PATIL | Thane (M Corp.) | Thane |
| HITESH UMESH PATIL | Thane (M Corp.) | Thane |
| SWAYAM UMESH PATIL | Thane (M Corp.) | Thane |
| Sharad Motiram Bubera | Thane (M Corp.) | Thane |
| Sunita Dayanand Bubera | Thane (M Corp.) | Thane |
| Sudhir Motiram Bubera | Thane (M Corp.) | Thane |
| Shashikant Motiram Bubera | Thane (M Corp.) | Thane |
| Padibai Sadashiv Patil | Thane (M Corp.) | Thane |
| Pramila Pandurang Patil | Thane (M Corp.) | Thane |
| Ashok Shantaram Gauri | Thane (M Corp.) | Thane |
| Bhimabai Gopinath Gauri | Thane (M Corp.) | Thane |
| Vanita Balaram Mhatre | Thane (M Corp.) | Thane |
| Aruna Gopinath Gauri | Thane (M Corp.) | Thane |
| Maya Suresh Tare | Thane (M Corp.) | Thane |
| Raj Janardan Gauri | Thane (M Corp.) | Thane |
| Premnath Janardan Gauri | Thane (M Corp.) | Thane |
| Prema Shivram Gaikar | Thane (M Corp.) | Thane |
| Pratima Suboth Madhavi | Thane (M Corp.) | Thane |
| Sandeep Nandkumar Salvi | Thane (M Corp.) | Thane |
| SUNITA ENTERPRISES [PROPRIETOR: NANDKUMAR SALVI] | Thane (M Corp.) | Thane |
| NILESH BALKRISHNA SALVI | Thane (M Corp.) | Thane |
| Saurabh Nandkumar Salvi | Thane (M Corp.) | Thane |
| Malti Naresh patil | Thane (M Corp.) | Thane |
| Ashish Naresh Patil | Thane (M Corp.) | Thane |
| Priyanka Naresh Patil | Thane (M Corp.) | Thane |
| Manjula Suresh Patil | Thane (M Corp.) | Thane |
| Roshan Suresh Patil | Thane (M Corp.) | Thane |
| Rohan Suresh Patil | Thane (M Corp.) | Thane |
| Ramesh Vishnu Patil | Thane (M Corp.) | Thane |
| Vijay Vishnu patil | Thane (M Corp.) | Thane |
| Sunanda Ram Salvi | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NAMITA MHATRE |
| Engineer | ASSOCIATED CONSULTANTS VIKAS GOKHALE |
| Chartered Accountant | A K O R D AND CO |
| Chartered Accountant | ATUL A. JOSHI & CO |
| Partner | Role in project |
|---|---|
| SHREE KRUPA BUILDERS | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 142/2015/2015 | THANE CIVIL COURT | PENDING FOR EVIDENCE OF PLAINTIFF |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Jan 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Jan 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Mar 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 27 Dec 2030
Documents filed72
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Other - FinanceFile: 6 Building Plan Approval _ NA Order for plotted development.pdf | 10 Mar 2025 |
| Other - FinanceFile: Declaration Regarding Allotment to Landowner units.pdf | 10 Mar 2025 |
| Building plan approvalFile: Form B SKB 500.pdf | 3 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Form B SKB 500.pdf | 3 Mar 2025 |
| Other - LegalFile: Form B SKB 500.pdf | 3 Mar 2025 |
| Other - FinanceFile: Declaration Regarding not selling landowner units.pdf | 3 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: Declaration of Title uploaded in Other Legal Tab 13.pdf | 23 Feb 2025 |
| Other - LegalFile: Form B Sunita 500.pdf | 23 Feb 2025 |
| Other - LegalFile: Declaration of Title uploaded in Other Legal Tab 13.pdf | 23 Feb 2025 |
| Other - LegalFile: Form B Nilesh Salvi 500.pdf | 23 Feb 2025 |
| Other - LegalFile: Form B SKB 500.pdf | 23 Feb 2025 |
| Other - LegalFile: Title report for RERA Revised 22-02-2025_11zon.pdf | 23 Feb 2025 |
| Other - LegalFile: 91 Sale Deed.pdf | 23 Feb 2025 |
| Details of encumbrances concerned to LegalFile: Declaration of Title uploaded in Other Legal Tab 13.pdf | 23 Feb 2025 |
| Other - LegalFile: 104 GIFT DEED (VIDYA SALVI) .pdf | 21 Feb 2025 |
| Other - LegalFile: 104 GIFT DEED KANTA SALVI compressed.pdf | 21 Feb 2025 |
| Other - FinanceFile: Declaration about land cost.pdf | 21 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Latest Appendixx F Plinth Completion .pdf | 11 Feb 2025 |
| Other - FinanceFile: 89 POWER.pdf | 11 Feb 2025 |
| Other - FinanceFile: 105 POWER 1 (land owner - sunita ent) compressed.pdf | 11 Feb 2025 |
| Other - FinanceFile: 101 1,2 POWER compressed.pdf | 11 Feb 2025 |
| Other - FinanceFile: 93 POWER.pdf | 11 Feb 2025 |
| Other - FinanceFile: POA Gut No 90.pdf | 11 Feb 2025 |
| Other - FinanceFile: 89 POWER (SUNIT ENT - SHREE KRUPA).pdf | 11 Feb 2025 |
| Other - FinanceFile: 86 POA N B Salvi To SKB.pdf | 11 Feb 2025 |
| Other - FinanceFile: Land owners Unit.pdf | 11 Feb 2025 |
| Other - LegalFile: 1-11 Sale Deed.pdf | 8 Feb 2025 |
| Other - LegalFile: 103 Kharedikhat.pdf | 8 Feb 2025 |
| Other - LegalFile: 91 Sale Deed.pdf | 8 Feb 2025 |
| Other - LegalFile: 86 POA N B Salvi To SKB.pdf | 8 Feb 2025 |
| Other - LegalFile: 63.pdf | 8 Feb 2025 |
| Other - LegalFile: 41-69.pdf | 8 Feb 2025 |
| Other - LegalFile: 21-40.pdf | 8 Feb 2025 |
| Other - LegalFile: 1-20.pdf | 8 Feb 2025 |
| Other - LegalFile: 12-33 Sale Deed.pdf | 8 Feb 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: END USE CERTIFICATE Nandanvan E (4).pdf | 23 Jan 2025 |
| Copy of the legal title reportFile: 13 Other - Legal.pdf | 22 Jan 2025 |
| Proforma of Allotment letterFile: Proforma_Allotment Letter Rera Final-Nandanvan Homes E.pdf | 22 Jan 2025 |
| Declaration in FORM BFile: Form B SKB (1).pdf | 22 Jan 2025 |
| CERSAI detailsFile: CERSAI_Search_Report_Security_Interest_Id_Based_Search_20_07_2023_19_37_40_594 (1).pdf | 22 Jan 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Flat sale (2).pdf | 22 Jan 2025 |
| Proforma of Agreement for saleFile: AFS Revised.pdf | 22 Jan 2025 |
| Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter.pdf | 21 Jan 2025 |
| Other - TechnicalFile: Order No 50-2024_One Plot One Registration Nandanvan-E (1).pdf | 21 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 NHE_compressed (1).pdf | 16 Jan 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: form -B bank letter (1).pdf | 16 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: encumbrance (1).pdf | 13 Jan 2025 |
| Details of encumbrances concerned to LegalFile: encumbrance (1).pdf | 13 Jan 2025 |
| Layout approvalFile: NH E Sanctioned Layout.pdf | 4 Jan 2025 |
| Building plan approvalFile: Building Plan Approval and CC.pdf | 4 Jan 2025 |
| Building plan approvalFile: 7.pdf | 4 Jan 2025 |
| Building plan approvalFile: 8.pdf | 4 Jan 2025 |
| Building plan approvalFile: 9.pdf | 4 Jan 2025 |
| Building plan approvalFile: 10.pdf | 4 Jan 2025 |
| PAN CardFile: Shree Krupa Pan Card.pdf | 4 Jan 2025 |
| Copy of Layout Approval (in case of layout)File: NH E Sanctioned Layout.pdf | 4 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 4 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-at the time of reg revised.pdf | 4 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Building Plan Approval and CC.pdf | 4 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 7.pdf | 4 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 10.pdf | 4 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 9.pdf | 4 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 8.pdf | 4 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval and CC.pdf | 4 Jan 2025 |
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 4 Jan 2025 |
| CERSAI detailsFile: CERSAI DECLARATION.pdf | 4 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about seperate bank Ac_On Promoter Letterhead.pdf | 4 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest-Nandkumar Salvi.pdf | 4 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest-Nilesh Salvi.pdf | 4 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest-Sandeep Salvi.pdf | 4 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure saurabh salvi.pdf | 4 Jan 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: secured unsecured finance availed.pdf | 4 Jan 2025 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| NANDANVAN HOMES-D1D2,D4,C1 | - | 115 | Completed | Dec 2017 | Dec 2017 |
| NANDANVAN HOMES A-1 A2 | PARSIK NAGAR KALWA THANE | 136 | Completed | Sep 2015 | Late, Dec 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 72 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep NANDANVAN HOMES BUILDING E on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PARSIK NAGAR THANE7,600+ in Thane
Filed coordinates, straight-line distance. 25 registered projects within 2 km.
Birla Taranya - Phase 1
Ekamaya Properties Private Limited
NANDANVAN HOMES-BUILDING B
SHREE KRUPA BUILDERS
MARUTI HOMES
Jay Shree Krishna Enterprises
SHREE SAI CHARAN CHSL
MANDAR CONSTRUCTIONS AND DEVELOPERS LLP
MAPLE ENCLAVE
MANDAR CONSTRUCTION AND DEVELOPERS
AMOL SAUBHAGYA
SUMAN REALTIES
See every Thane project, with the district possession charts
Builder: SHREE KRUPA BUILDERS
SHREE KRUPA BUILDERS has 4 registrations on MahaRERA, including SHREE JAI RESIDENCY and NANDANVAN HOMES-C1. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if NANDANVAN HOMES BUILDING E is delayed beyond 27 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NANDANVAN HOMES BUILDING E?
The registered promoter entity is SHREE KRUPA BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NANDANVAN HOMES BUILDING E?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NANDANVAN HOMES BUILDING E?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NANDANVAN HOMES BUILDING E?
The professionals named in the filing: Architect: NAMITA MHATRE; Engineer: ASSOCIATED CONSULTANTS VIKAS GOKHALE; Chartered Accountant: A K O R D AND CO; Chartered Accountant: ATUL A. JOSHI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NANDANVAN HOMES BUILDING E?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback