Home / Browse projects / Raigarh, Maharashtra / NANDANVAN
NANDANVAN
RG-MH-15643 · RERA P52000023312 · Last updated on MahaRERA portal: 20 Aug 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NANDANVAN is a Residential / Group Housing project by SHREE VASTURACHANA HOMES in Raigarh, Maharashtra, registered with MahaRERA as P52000023312 on 11 Dec 2019. The registration is recorded completed; possession was promised by 30 Jun 2025. The completion date has moved by 12 months from the original filing.
At a glance
Project
- NameNANDANVAN
- TypeResidential / Group Housing
- Location
- SR NO 158/2A
- AJIVALI
- Panvel
- Raigarh
- 410206
- Pincode410206
- RERA no.P52000023312
- ReraGenie IDRG-MH-15643
Builder
- NameSHREE VASTURACHANA HOMES
- Entity typePartnership
- PartnersMANISHA KISHOR NIKAM, VIDYADHAR SURYAKANT WADKAR, SURYAKANT TUKARAM KACHARE
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on11 Dec 2019
- Promised completion30 Jun 2025
- Revised completionRevised to 30 Jun 2025 (originally 30 Jun 2024)
- Buildings2 building records
- Documents filed82 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING NO-1 | NA | 9 | 0 | 0 | 0 | 0 |
| BUILDING NO-2 | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 20 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
BUILDING NO-127%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO-29%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed75
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| BUILDING NO-1 | 8 | 39 | 47 |
| BUILDING NO-2 | 9 | 19 | 28 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Shree Vasturachana Homes | Panvel | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| SHREE VASTURACHANA HOMES | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Oct 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Sep 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Sep 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed82
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 - Nandanvan as on March 2025.pdf | 20 Aug 2025 |
| Form 2File: Form 2 - Nandanvan as on March 2025.pdf | 20 Aug 2025 |
| Form 3File: Form 3 - Nandanvan as on March 2025.pdf | 20 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Nandavan as on March 2025.pdf | 20 Aug 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Nandanvan as on Dec 2024.pdf | 7 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nandanvan as on Dec 2024.pdf | 7 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Nandanvan as on March 2025.pdf | 9 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Nandanvan as on 10-09-2019.pdf | 9 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 14 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf | 19 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 14 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Nandanvan as on 31-03-2024.pdf | 20 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Nandanvan as on 30-06-2024.pdf | 20 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Nandanvan as on Sep 2024.pdf | 20 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nandanvan as on March 2024.pdf | 20 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nandanvan as on June 2024.pdf | 20 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nandanvan as on Sep 2024.pdf | 20 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Nandanvan for FY 2023-24.pdf | 20 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nandanvan as on Dec 2023.pdf | 4 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Nandanvan as on Dec 2023.pdf | 4 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Nandanvan FY2022-23.pdf | 13 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nandanvan as on March 2023.pdf | 9 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nandanvan as on June 2023.pdf | 9 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Nandanvan as on September 2023.pdf | 9 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Nandanvan as on March 2023.pdf | 9 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Nandanvan as on June 2023.pdf | 9 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Nandanvan as on September 2023.pdf | 9 Dec 2023 |
| Declaration about Commencement CertificateFile: Order.pdf | 5 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY.pdf | 5 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: sold unsold.pdf | 5 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SVH 31st March 2021-min.pdf | 6 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SVH 31st December 2021-min.pdf | 6 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SVH 31st March 2022-min.pdf | 6 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SVH 30th June 2022-min.pdf | 6 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SVH 30th September 2022-min.pdf | 6 May 2023 |
| Disclosure of sold/ booked inventoryFile: सोल्ड अनसोल्ड यादी .pdf | 24 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-3-23.pdf | 19 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Building No-1.pdf | 11 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Building No-2.pdf | 11 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 28-6-19.pdf | 30 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 10-9-19.pdf | 30 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A as on 2019-20.pdf | 30 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A as on 2020-21.pdf | 30 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A as on 2021-22.pdf | 30 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on March 2020.pdf | 30 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on March 2021.pdf | 30 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on December 2021.pdf | 30 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on March 2022.pdf | 30 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on June 2022.pdf | 30 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on September 2022.pdf | 30 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 as on 2019-20.pdf | 30 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 as on 2020-21.pdf | 30 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 as on 2021-22.pdf | 30 Mar 2023 |
| Proforma of Allotment letterFile: AMMENDED DRAFT AGREEMENT.pdf | 29 Sep 2022 |
| Layout approvalFile: Scan-001.pdf | 23 Sep 2022 |
| Building plan approvalFile: Scan-002.pdf | 23 Sep 2022 |
| Building plan approvalFile: Scan-004.pdf | 23 Sep 2022 |
| Copy of Layout Approval (in case of layout)File: Scan-001.pdf | 23 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan-002.pdf | 23 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan-004.pdf | 23 Sep 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC 158.pdf | 23 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERIFICATE FORM 3 REDUCED.pdf | 19 Nov 2019 |
| Proforma of Allotment letterFile: Allotment Letter Format.pdf | 19 Nov 2019 |
| Layout approvalFile: Scan-0001.pdf | 20 Oct 2019 |
| Building plan approvalFile: Scan-0002.pdf | 20 Oct 2019 |
| Building plan approvalFile: Scan-0003.pdf | 20 Oct 2019 |
| Building plan approvalFile: Scan-0004.pdf | 20 Oct 2019 |
| Building plan approvalFile: Scan-0005.pdf | 20 Oct 2019 |
| PAN CardFile: PAN CARD Homes.pdf | 20 Oct 2019 |
| Copy of the legal title reportFile: TITLE SEARCH REPORT.pdf | 20 Oct 2019 |
| Details of encumbrancesFile: Declaration Of No Encumbarances.pdf | 20 Oct 2019 |
| Copy of Layout Approval (in case of layout)File: Scan-0001.pdf | 20 Oct 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan-0002.pdf | 20 Oct 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan-0003.pdf | 20 Oct 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan-0004.pdf | 20 Oct 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan-0005.pdf | 20 Oct 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf | 20 Oct 2019 |
| Declaration in FORM BFile: AFFIDAVIT OWNER_compressed.pdf | 20 Oct 2019 |
| Declaration in FORM BFile: AFFIDAVIT DEVLOPERS_compressed.pdf | 20 Oct 2019 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Nandanvan_compressed.pdf | 20 Oct 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 82 filed documents as one ZIP, foldered, with a manifest
Keep NANDANVAN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near AJIVALI5,900+ in Raigarh
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: SHREE VASTURACHANA HOMES
SHREE VASTURACHANA HOMES has 2 registrations on MahaRERA, including NANDANVAN and Nandanvan II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if NANDANVAN is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NANDANVAN?
The registered promoter entity is SHREE VASTURACHANA HOMES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NANDANVAN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NANDANVAN?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in NANDANVAN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback