Home / Browse projects / Nagpur, Maharashtra / NAND YASHODA HIGHRRISE

Registered No litigation declared Others project

NAND YASHODA HIGHRRISE

By NANDIISH BUILDERS AND DEVELOPERS

RG-MH-93317 · RERA P50500077325 · Last updated on MahaRERA portal: 22 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Plinth, 80%
55 of 112Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

NAND YASHODA HIGHRRISE is a Others project by NANDIISH BUILDERS AND DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500077325 on 6 Aug 2024. Possession is promised by 30 Dec 2030. 57 of the 112 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameNAND YASHODA HIGHRRISE
  • TypeOthers
  • Location
    • Narsala Road
    • Nagpur
    • Narsala
    • Nagpur (Rural)
    • 440034
  • Pincode440034
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500077325
  • ReraGenie IDRG-MH-93317

Builder

  • NameNANDIISH BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersDevendra Murlidhar Bhongade, Dipesh alias Depeshkumar Premkumar Jain, Ashish Arvind Rokde, Sandip Sureshchand Jain

Key dates

this monthRegisteredAug 2024PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Aug 2024
  • Promised completion30 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed73 files

Current status

51%57 of 112 units booked
42.4%Work done, per cost certificate

Figures as on 22 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NAND YASHODA HIGHRISENA991084112

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Plinth, at 80%.

NAND YASHODA HIGHRISE: 37% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth80%
Stilt Floor70%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,925 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Sep 2025
LandownerVillageDistrict
NANDIISH BUILDERS AND DEVELOPERSNagpur (M Corp.)Nagpur
Ashish Arvind RokdeNagpur (M Corp.)Nagpur
Dipesh Alias Dipeshkumar Premkumar JainNagpur (M Corp.)Nagpur
Sandeep Sureshchand JainNagpur (M Corp.)Nagpur
Jayashri Sandip JainNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNagpur Improvement Trust, Nagpur
Permissible FSI6615.37
Proposed, not sanctioned6,615 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFirst Floor Ram Niwas Hudkeshwar Road Renuka Mata Nagar Nagpur Urban 440023
Estimated costRs 14.50 cr
Cost incurredRs 6.15 cr
Work done42.44%
BuildingWingEstimatedIncurred
NAND YASHODA HIGHRISENARs 14.50 crRs 6.15 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectALOK DULICHAND LUNIA
EngineerGANESH CHANDRASHEKHAR RAGIT
EngineerPANKAJ NAIK
Chartered AccountantAMOL GAWANDE
Chartered AccountantRAI LOKESH & ASSOCIATES
Chartered AccountantCHETAN BHANDIRGE & CO.
PartnerRole in project
NANDIISH BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2030

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: 2024-25.pdf22 May 2026
Form 2A (FY 2025-2026)File: 2025-26.pdf22 May 2026
Form 2A (FY 2026-2027)File: 2026-27.pdf22 May 2026
Withdrawal Update Form 1File: Form 1.pdf17 May 2026
Withdrawal Update Form 1File: Form 1.pdf17 May 2026
Withdrawal Update Form 2File: Form 2.pdf17 May 2026
Withdrawal Update Form 2File: Form 2.pdf17 May 2026
Withdrawal Update Form 3File: Form 3.pdf17 May 2026
Withdrawal Update Form 3File: Form 3.pdf17 May 2026
Form 5 (FY 2025-2026)File: Form 5.pdf17 May 2026
Withdrawal Update Form 1File: Form 1.pdf30 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf30 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf30 Jan 2026
Form 1File: 07-24 to 09-24 Q2.pdf30 Sep 2025
Form 2File: 07-24 to 09-24.pdf30 Sep 2025
Form 3File: 07-24 to 09-24.pdf30 Sep 2025
Disclosure of Sold and Booked InventoryFile: 07-24 to 09-24.pdf30 Sep 2025
Form 1File: 10-24 to 12-24 Q3.pdf30 Sep 2025
Form 2File: 10-24 to 12-24.pdf30 Sep 2025
Form 3File: 10-24 to 12-24.pdf30 Sep 2025
Disclosure of Sold and Booked InventoryFile: 10-24 to 12-24.pdf30 Sep 2025
Form 1File: 01-25 to 03-25 Q4.pdf30 Sep 2025
Form 2File: 01-25 to 03-25.pdf30 Sep 2025
Form 3File: 01-25 to 03-25.pdf30 Sep 2025
Disclosure of Sold and Booked InventoryFile: 01-25 to 03-25.pdf30 Sep 2025
Withdrawal Update Form 1File: Form 1.pdf30 Sep 2025
Withdrawal Update Form 1File: Form 1.pdf30 Sep 2025
Withdrawal Update Form 1File: Form 1.pdf30 Sep 2025
Withdrawal Update Form 1File: Form 1.pdf30 Sep 2025
Withdrawal Update Form 2File: Form 2.pdf30 Sep 2025
Withdrawal Update Form 2File: Form 2.pdf30 Sep 2025
Withdrawal Update Form 2File: Form 2.pdf30 Sep 2025
Withdrawal Update Form 2File: Form 2.pdf30 Sep 2025
Withdrawal Update Form 3File: 04-25 to 07-25.pdf30 Sep 2025
Withdrawal Update Form 3File: 04-25 to 07-25.pdf30 Sep 2025
Withdrawal Update Form 3File: 04-25 to 07-25.pdf30 Sep 2025
Withdrawal Update Form 3File: 04-25 to 07-25.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: FORM 5.pdf30 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3_compressed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DocScanner 13 Jan 2025 16-41.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DocScanner 13 Jan 2025 16-48.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PDFGallery_20250113_181133.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf25 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certficate.pdf25 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer.pdf25 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf25 Dec 2024
Other - LegalFile: Screen shot municipal corporation.pdf5 Jul 2024
Building plan approvalFile: E- BUILDING PERMISSION DWG_removed (1)_240404_132819.pdf26 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: E- BUILDING PERMISSION DWG_removed (1)_240404_132819.pdf26 Jun 2024
Other - LegalFile: DECLARATION ABOUT KHASRA.pdf4 Apr 2024
Other - TechnicalFile: DECLARATION -CUM-UNDERTAKING.pdf4 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISLCOSURE OF INTEREST IN OTHER REAL ESTATE PROJECT.pdf7 Mar 2024
Declaration in FORM BFile: form B.pdf4 Mar 2024
Proforma of Agreement for saleFile: agreement to sale rera draft.pdf2 Mar 2024
Layout approvalFile: SITE PLAN.pdf1 Mar 2024
Building plan approvalFile: BUILDING PLAN.pdf1 Mar 2024
Copy of Layout Approval (in case of layout)File: SITE PLAN.pdf1 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN.pdf1 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf1 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Fom 3 CA report.pdf29 Feb 2024
Copy of the legal title reportFile: LEGAL TITLE REPORT_compressed.pdf28 Feb 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE REPORT.pdf28 Feb 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE REPORT.pdf28 Feb 2024
Declaration about Commencement CertificateFile: DECLARATION COMMENCEMENT CERTIFICATE.pdf28 Feb 2024
CERSAI detailsFile: CERSAI DECLARATION.pdf28 Feb 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf28 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DECLARATION.pdf28 Feb 2024
Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT LETTER.pdf28 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement to sale.pdf28 Feb 2024
PAN CardFile: NANDIISH PAN CADRD.pdf27 Feb 2024

How this compares with Nagpur

51%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NAND YASHODA HIGHRRISE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nagpur2,800+ in Nagpur

2 kmNAND YASHODA HIGHRRISECompleted 12Lapsed / revoked 4Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 35 registered projects within 2 km.

Builder: NANDIISH BUILDERS AND DEVELOPERS

NANDIISH BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including NAND YASHODA HIGHRRISE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if NAND YASHODA HIGHRRISE is delayed beyond 30 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NAND YASHODA HIGHRRISE?

The registered promoter entity is NANDIISH BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NAND YASHODA HIGHRRISE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NAND YASHODA HIGHRRISE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NAND YASHODA HIGHRRISE?

The professionals named in the filing: Architect: ALOK DULICHAND LUNIA; Engineer: GANESH CHANDRASHEKHAR RAGIT; Engineer: PANKAJ NAIK; Chartered Accountant: AMOL GAWANDE; Chartered Accountant: RAI LOKESH & ASSOCIATES; Chartered Accountant: CHETAN BHANDIRGE & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NAND YASHODA HIGHRRISE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NAND YASHODA HIGHRRISE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NAND YASHODA HIGHRRISE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.