NAMAN RESIDENCY
RG-MH-67347 · RERA P52000019071 · Last updated on MahaRERA portal: 27 May 2023
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NAMAN RESIDENCY is a Residential / Group Housing project by Shreemangal Infra in Raigarh, Maharashtra, registered with MahaRERA as P52000019071 on 28 Dec 2018. The registration is recorded completed; possession was promised by 30 Dec 2024.
At a glance
Project
- NameNAMAN RESIDENCY
- TypeResidential / Group Housing
- Location
- DHANSAR VILLAGE ROAD
- DHANSAR
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000019071
- ReraGenie IDRG-MH-67347
Builder
- NameShreemangal Infra
- Entity typePartnership
- PartnersNeha Jain, Punit Bharat Doshi, Smita Parakh, Meena Jain
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on28 Dec 2018
- Promised completion30 Dec 2024
- Revised completionNone
- Buildings5 building records
- Documents filed77 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING NO 1 | NA | 6 | 0 | 0 | 0 | 0 |
| BUILDING NO 2 WING A | NA | 6 | 0 | 0 | 0 | 0 |
| BUILDING NO 2 WING B | NA | 6 | 0 | 0 | 0 | 0 |
| BUILDING NO 3 WING A | NA | 6 | 0 | 0 | 0 | 0 |
| BUILDING NO 3 WING B | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 27 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Staircases, at 75%.
BUILDING NO 136%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 2 WING A54%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 2 WING B54%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 3 WING A51%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 3 WING B51%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 27 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NEHA JAIN |
| Engineer | YATEESH TARE |
| Chartered Accountant | SANTOSH BORKAR |
| Partner | Role in project |
|---|---|
| Shreemangal Infra | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Dec 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Dec 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Dec 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Dec 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 27 May 2023
Documents filed77
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy certificate (1)_compressed (1).pdf | 27 May 2023 |
| Certificates of CA (Form 3)File: form 3 june 2022.pdf | 16 Mar 2023 |
| Certificates of CA (Form 3)File: form 3 sep 2022.pdf | 16 Mar 2023 |
| Certificates of CA (Form 3)File: from 3 dec 2022.pdf | 16 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 jun 22_compressed.pdf | 14 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 sep 22_compressed.pdf | 14 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 dec 22_compressed.pdf | 14 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 june 2022.pdf | 14 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 sep 2022.pdf | 14 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 dec 2022.pdf | 14 Mar 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Name reservation letter (1)_compressed.pdf | 14 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021_22_compressed.pdf | 13 Mar 2023 |
| CERSAI detailsFile: MANGAL INFRA-Cersai Asset Based Report - .pdf | 12 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: SHREE MANGAL INFRA-ANNEXURE A .pdf | 12 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 22.pdf | 25 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_compressed.pdf | 24 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1_compressed.pdf | 24 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer Certificate_compressed.pdf | 24 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2_compressed.pdf | 24 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3 - C A Certificate_compressed.pdf | 24 Feb 2023 |
| Certificates of CA (Form 3)File: form 3 - Copy_compressed.pdf | 24 Feb 2023 |
| Certificates of CA (Form 3)File: form 3 - Copy_compressed.pdf | 24 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 21.pdf | 24 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 22.pdf | 24 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 9 Jul 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 9 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A.pdf | 9 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE RERA SALES NAMAN RESIDENCY.pdf | 9 Jul 2021 |
| Certificates of CA (Form 3)File: Form 3.pdf | 9 Jul 2021 |
| Form 2AFile: Form 2 30 Oct 2020.pdf | 30 Jan 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form-5 Rera Annual Report.pdf | 30 Jan 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Certificate compressed.pdf | 19 Jan 2021 |
| Certificates of CA (Form 3)File: Naman Residency Form 3 - 30092020.pdf | 19 Jan 2021 |
| Certificates of CA (Form 3)File: Naman Residency Form 3-31032020.pdf | 19 Jan 2021 |
| OtherFile: Declaration .pdf | 19 Jan 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT 31ST MAY 2020_compressed.pdf | 15 Jan 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: STRUCTURE ENGINEER DHANSAR 31-03-20_compressed.pdf | 15 Jan 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: STRUCTURE ENGINEER DHANSAR 30-09-20_compressed.pdf | 15 Jan 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed.pdf | 18 Feb 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer Certificate_compressed.pdf | 18 Feb 2020 |
| Form 2AFile: FORM-2A.pdf | 18 Feb 2020 |
| Certificates of CA (Form 3)File: Form 3 - CA Certificate .pdf | 18 Feb 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: SMI - FORM-5.pdf | 18 Feb 2020 |
| Copy of the legal title reportFile: REVISED REPORT ON TITLE 268.PDF | 24 Dec 2019 |
| Proforma of Allotment letterFile: revised on 24-12-19 AGREEMENT FOR SALE-compressed_reduce.pdf | 24 Dec 2019 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SMI Architect Cert.pdf | 18 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SMI ENGINEER CERT.pdf | 18 Sep 2019 |
| Form 2AFile: FORM-2A.pdf | 18 Sep 2019 |
| Certificates of CA (Form 3)File: CA CERTIFICATE NAMAN RESIDENCY.pdf | 18 Sep 2019 |
| Form 2AFile: quality assurance certificate.pdf | 9 May 2019 |
| Form 2AFile: quality assurance certificate.pdf | 9 May 2019 |
| Form 2AFile: quality assurance certificate.pdf | 9 May 2019 |
| Proforma of Allotment letterFile: revised 9-4-19 Draft Sale Agreement.pdf | 10 Apr 2019 |
| Proforma of Allotment letterFile: revised 9-4 -19Allotment Letter.pdf | 10 Apr 2019 |
| Proforma of Allotment letterFile: Naman Residency - final-4-12-.pdf | 19 Jan 2019 |
| Declaration in FORM BFile: Form B.pdf | 19 Dec 2018 |
| Proforma of Allotment letterFile: SMI - Naman Residency - Agreement and Allotment Draft.pdf | 19 Dec 2018 |
| Layout approvalFile: Plan 1.pdf | 18 Dec 2018 |
| Building plan approvalFile: Plan 2.pdf | 18 Dec 2018 |
| Building plan approvalFile: Plan 3.pdf | 18 Dec 2018 |
| Building plan approvalFile: Plan 4.pdf | 18 Dec 2018 |
| Building plan approvalFile: Plan 5.pdf | 18 Dec 2018 |
| Building plan approvalFile: Plan 6.pdf | 18 Dec 2018 |
| PAN CardFile: Shreemangal Infra - Pan Card.pdf | 18 Dec 2018 |
| Copy of the legal title reportFile: Title Report - Plot 268.pdf | 18 Dec 2018 |
| Copy of the legal title reportFile: Title Report - Plot 267.pdf | 18 Dec 2018 |
| Details of encumbrancesFile: Encumbrance Certificate.pdf | 18 Dec 2018 |
| Copy of Layout Approval (in case of layout)File: Plan 1.pdf | 18 Dec 2018 |
| Building Plan Approval (IOD)File: Plan 2.pdf | 18 Dec 2018 |
| Building Plan Approval (IOD)File: Plan 3.pdf | 18 Dec 2018 |
| Building Plan Approval (IOD)File: Plan 4.pdf | 18 Dec 2018 |
| Building Plan Approval (IOD)File: Plan 5.pdf | 18 Dec 2018 |
| Building Plan Approval (IOD)File: Plan 6.pdf | 18 Dec 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 18 Dec 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Vastukalp Certificate.pdf | 18 Dec 2018 |
| Form 2AFile: ENGINEER CERTIFICATE FOR QUALITY ASSURANCE.pdf | 18 Dec 2018 |
| Certificates of CA (Form 3)File: CA CERTIFICATE FORM 3.pdf | 18 Dec 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 77 filed documents as one ZIP, foldered, with a manifest
Keep NAMAN RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DHANSAR5,900+ in Raigarh
Filed coordinates, straight-line distance. 19 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: Shreemangal Infra
Shreemangal Infra has 1 registration on MahaRERA, including NAMAN RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if NAMAN RESIDENCY is delayed beyond 30 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NAMAN RESIDENCY?
The registered promoter entity is Shreemangal Infra, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NAMAN RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NAMAN RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NAMAN RESIDENCY?
The professionals named in the filing: Architect: NEHA JAIN; Engineer: YATEESH TARE; Chartered Accountant: SANTOSH BORKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NAMAN RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback