ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / NAMAN RESIDENCY

Completed No litigation declared Residential / Group Housing project

NAMAN RESIDENCY

By Shreemangal Infra

RG-MH-67347 · RERA P52000019071 · Last updated on MahaRERA portal: 27 May 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
20 of 55Construction stages doneacross 5 buildings; furthest along: Staircases, 75%
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

NAMAN RESIDENCY is a Residential / Group Housing project by Shreemangal Infra in Raigarh, Maharashtra, registered with MahaRERA as P52000019071 on 28 Dec 2018. The registration is recorded completed; possession was promised by 30 Dec 2024.

At a glance

Project

  • NameNAMAN RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • DHANSAR VILLAGE ROAD
    • DHANSAR
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000019071
  • ReraGenie IDRG-MH-67347

Builder

  • NameShreemangal Infra
  • Entity typePartnership
  • PartnersNeha Jain, Punit Bharat Doshi, Smita Parakh, Meena Jain

Key dates

this monthRegisteredDec 2018PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Dec 2018
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings5 building records
  • Documents filed77 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1NA60000
BUILDING NO 2 WING ANA60000
BUILDING NO 2 WING BNA60000
BUILDING NO 3 WING ANA60000
BUILDING NO 3 WING BNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 27 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Staircases, at 75%.

BUILDING NO 136%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 2 WING A54%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 2 WING B54%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 3 WING A51%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 3 WING B51%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,530 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3518.29
Proposed, not sanctioned3,518 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 43 VANDHANA SCHEME NO 6 ROAD NO 25 SION WEST MUMBAI 400022

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNEHA JAIN
EngineerYATEESH TARE
Chartered AccountantSANTOSH BORKAR
PartnerRole in project
Shreemangal Infra-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Dec 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Dec 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Dec 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 May 2023

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy certificate (1)_compressed (1).pdf27 May 2023
Certificates of CA (Form 3)File: form 3 june 2022.pdf16 Mar 2023
Certificates of CA (Form 3)File: form 3 sep 2022.pdf16 Mar 2023
Certificates of CA (Form 3)File: from 3 dec 2022.pdf16 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 jun 22_compressed.pdf14 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 sep 22_compressed.pdf14 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 dec 22_compressed.pdf14 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 june 2022.pdf14 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 sep 2022.pdf14 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 dec 2022.pdf14 Mar 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Name reservation letter (1)_compressed.pdf14 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021_22_compressed.pdf13 Mar 2023
CERSAI detailsFile: MANGAL INFRA-Cersai Asset Based Report - .pdf12 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SHREE MANGAL INFRA-ANNEXURE A .pdf12 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 22.pdf25 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_compressed.pdf24 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1_compressed.pdf24 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer Certificate_compressed.pdf24 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2_compressed.pdf24 Feb 2023
Certificates of CA (Form 3)File: Form 3 - C A Certificate_compressed.pdf24 Feb 2023
Certificates of CA (Form 3)File: form 3 - Copy_compressed.pdf24 Feb 2023
Certificates of CA (Form 3)File: form 3 - Copy_compressed.pdf24 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 21.pdf24 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 22.pdf24 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf9 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf9 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A.pdf9 Jul 2021
Disclosure of sold/ booked inventoryFile: DISCLOSURE RERA SALES NAMAN RESIDENCY.pdf9 Jul 2021
Certificates of CA (Form 3)File: Form 3.pdf9 Jul 2021
Form 2AFile: Form 2 30 Oct 2020.pdf30 Jan 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form-5 Rera Annual Report.pdf30 Jan 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Certificate compressed.pdf19 Jan 2021
Certificates of CA (Form 3)File: Naman Residency Form 3 - 30092020.pdf19 Jan 2021
Certificates of CA (Form 3)File: Naman Residency Form 3-31032020.pdf19 Jan 2021
OtherFile: Declaration .pdf19 Jan 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT 31ST MAY 2020_compressed.pdf15 Jan 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: STRUCTURE ENGINEER DHANSAR 31-03-20_compressed.pdf15 Jan 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: STRUCTURE ENGINEER DHANSAR 30-09-20_compressed.pdf15 Jan 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed.pdf18 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer Certificate_compressed.pdf18 Feb 2020
Form 2AFile: FORM-2A.pdf18 Feb 2020
Certificates of CA (Form 3)File: Form 3 - CA Certificate .pdf18 Feb 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: SMI - FORM-5.pdf18 Feb 2020
Copy of the legal title reportFile: REVISED REPORT ON TITLE 268.PDF24 Dec 2019
Proforma of Allotment letterFile: revised on 24-12-19 AGREEMENT FOR SALE-compressed_reduce.pdf24 Dec 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SMI Architect Cert.pdf18 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SMI ENGINEER CERT.pdf18 Sep 2019
Form 2AFile: FORM-2A.pdf18 Sep 2019
Certificates of CA (Form 3)File: CA CERTIFICATE NAMAN RESIDENCY.pdf18 Sep 2019
Form 2AFile: quality assurance certificate.pdf9 May 2019
Form 2AFile: quality assurance certificate.pdf9 May 2019
Form 2AFile: quality assurance certificate.pdf9 May 2019
Proforma of Allotment letterFile: revised 9-4-19 Draft Sale Agreement.pdf10 Apr 2019
Proforma of Allotment letterFile: revised 9-4 -19Allotment Letter.pdf10 Apr 2019
Proforma of Allotment letterFile: Naman Residency - final-4-12-.pdf19 Jan 2019
Declaration in FORM BFile: Form B.pdf19 Dec 2018
Proforma of Allotment letterFile: SMI - Naman Residency - Agreement and Allotment Draft.pdf19 Dec 2018
Layout approvalFile: Plan 1.pdf18 Dec 2018
Building plan approvalFile: Plan 2.pdf18 Dec 2018
Building plan approvalFile: Plan 3.pdf18 Dec 2018
Building plan approvalFile: Plan 4.pdf18 Dec 2018
Building plan approvalFile: Plan 5.pdf18 Dec 2018
Building plan approvalFile: Plan 6.pdf18 Dec 2018
PAN CardFile: Shreemangal Infra - Pan Card.pdf18 Dec 2018
Copy of the legal title reportFile: Title Report - Plot 268.pdf18 Dec 2018
Copy of the legal title reportFile: Title Report - Plot 267.pdf18 Dec 2018
Details of encumbrancesFile: Encumbrance Certificate.pdf18 Dec 2018
Copy of Layout Approval (in case of layout)File: Plan 1.pdf18 Dec 2018
Building Plan Approval (IOD)File: Plan 2.pdf18 Dec 2018
Building Plan Approval (IOD)File: Plan 3.pdf18 Dec 2018
Building Plan Approval (IOD)File: Plan 4.pdf18 Dec 2018
Building Plan Approval (IOD)File: Plan 5.pdf18 Dec 2018
Building Plan Approval (IOD)File: Plan 6.pdf18 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf18 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Vastukalp Certificate.pdf18 Dec 2018
Form 2AFile: ENGINEER CERTIFICATE FOR QUALITY ASSURANCE.pdf18 Dec 2018
Certificates of CA (Form 3)File: CA CERTIFICATE FORM 3.pdf18 Dec 2018

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NAMAN RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHANSAR5,900+ in Raigarh

2 kmNAMAN RESIDENCYCompleted 1Lapsed / revoked 2Other 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 19 registered projects within 2 km.

Builder: Shreemangal Infra

Shreemangal Infra has 1 registration on MahaRERA, including NAMAN RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if NAMAN RESIDENCY is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NAMAN RESIDENCY?

The registered promoter entity is Shreemangal Infra, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NAMAN RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NAMAN RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NAMAN RESIDENCY?

The professionals named in the filing: Architect: NEHA JAIN; Engineer: YATEESH TARE; Chartered Accountant: SANTOSH BORKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NAMAN RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NAMAN RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NAMAN RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.