ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / N SQUARE

Completed No litigation declared Commercial project

N SQUARE

By parthesh developers private limited

RG-MH-25830 · RERA P51800009863 · Last updated on MahaRERA portal: 18 Apr 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 36 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
1Complaints at MahaRERAon this registration
Jump to the 27 documents Report an error

N SQUARE is a Commercial project by parthesh developers private limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800009863 on 22 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2022. The completion date has moved by 36 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameN SQUARE
  • TypeCommercial
  • Location
    • Andheri
    • Mumbai Suburban
    • 400052
  • Pincode400052
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800009863
  • ReraGenie IDRG-MH-25830

Builder

  • Nameparthesh developers private limited
  • Entity typeCompany

Key dates

this monthRegisteredAug 2017First promiseDec 2019Revised toDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Aug 2017
  • Promised completion30 Dec 2022
  • Revised completionRevised to 30 Dec 2022 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed27 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
N SQUARENA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

N SQUARE: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area636 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1265.28
Proposed, not sanctioned1,265 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSANTACRUZ WEST

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectESSPEE ARCH N INFRA
PartnerRole in project
parthesh developers private limited-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800003752Dec 2019 → Dec 2020

Reason as filed by the promoterInadvertent Delay is caused due to Stop Work Notice which came to be issued by MCGM for Mistake/Fraud committed by the erstwhile Architect/L.S.. The Construction of Building Project is fully completed in 2010 only. However O.C. is not issued due to faulty AAI NOC. Now AAI NOC is duly secured and further development of 13th Floor is under progress. Only 20% work is remaining to be done. Hence Renewal or Extension of Project Registration is required. Promoter humbly prays that Renewal / Extension of Registration for FIRST TIME be granted to the Real Estate Project registered with this Hon. Autho

EXT51800010208Dec 2019 → Jun 2022

Reason as filed by the promoterThe construction of the project is completed. we are / were in the process of making applications for obtaining the Building Completion and Full Occupation Certificate for the said Project from the Municipal Corporation of Greater Mumbai (“MCGM”) i.e. the Planning Authority, however the “SECOND WAVE” crested in the state of Maharashtra forcing the state government to once again impose fresh restrictions. As a result of restrictions our applications for NOC’s to obtain the Building Completion and Full Occupation Certificate for the said Project remained under consideration with MCGM. we, theref

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000079220Inderji BhatiaParthesh Developers pvt ltd17/05/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Dec 2022

Documents filed27

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 MAHA RERA.pdf18 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: N Square OC 25 Nov 22.pdf7 Dec 2022
Declaration about Commencement CertificateFile: Declaration for CC.pdf2 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2021.pdf2 Aug 2021
Disclosure of sold/ booked inventoryFile: Disclosure for Sold signed and scanned.pdf2 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FOrm 5 FY 2019-20.pdf2 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: CERTIFICATE OF ENGINEER - FORM 2A.pdf23 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: fORM 5 18-19.pdf23 Dec 2019
Certificates of CA (Form 5)File: FORM5RERAPDPL.PDF8 Nov 2019
Certificates of CA (Form 5)File: pdpl-form 5.PDF13 Oct 2018
Layout approvalFile: MYSCAN_20170728_0003.PDF31 Jul 2017
Building plan approvalFile: IOD.pdf31 Jul 2017
Layout approvalFile: MYSCAN_20170728_0001.PDF31 Jul 2017
Layout approvalFile: MYSCAN_20170728_0002-ilovepdf-compressed (1).pdf31 Jul 2017
PAN CardFile: PAN.pdf31 Jul 2017
Copy of the legal title reportFile: LEGAL CERTIFICATE.pdf31 Jul 2017
Details of encumbrancesFile: Certificate of Encumbrances.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: MYSCAN_20170728_0001.PDF31 Jul 2017
Copy of Layout Approval (in case of layout)File: MYSCAN_20170728_0002-ilovepdf-compressed (1).pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: MYSCAN_20170728_0003.PDF31 Jul 2017
Building Plan Approval (IOD)File: IOD.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Plan01.pdf31 Jul 2017
Declaration in FORM BFile: Affidavit.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form 3 CA Certificate.pdf31 Jul 2017
Proforma of Allotment letterFile: dRAFT pdpl.pdf31 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 36 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep N SQUARE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri6,700+ in Mumbai Suburban

2 kmN SQUARECompleted 133Lapsed / revoked 74Other 158Dot size: filed unitsN

Filed coordinates, straight-line distance. 365 registered projects within 2 km.

Builder: parthesh developers private limited

parthesh developers private limited has 1 registration on MahaRERA, including N SQUARE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if N SQUARE is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of N SQUARE?

The registered promoter entity is parthesh developers private limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in N SQUARE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against N SQUARE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for N SQUARE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at N SQUARE?

The professionals named in the filing: Architect: ESSPEE ARCH N INFRA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in N SQUARE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About N SQUARE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save N SQUARE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.