ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / N G GRAND EMPIRE PHASE II

Registered No litigation declared Residential / Group Housing project

N G GRAND EMPIRE PHASE II

By RNA Builders (NG)

RG-MH-66131 · RERA P51700031379 · Last updated on MahaRERA portal: 23 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 24 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 30%
158 of 173Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 151 documents Report an error

N G GRAND EMPIRE PHASE II is a Residential / Group Housing project by RNA Builders (NG) in Thane, Maharashtra, registered with MahaRERA as P51700031379 on 23 Oct 2021. Possession is promised by 31 Dec 2028. The completion date has moved by 24 months from the original filing. 15 of the 173 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameN G GRAND EMPIRE PHASE II
  • TypeResidential / Group Housing
  • Location
    • INDRALOK
    • NAVGHAR
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401105
  • Pincode401105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700031379
  • ReraGenie IDRG-MH-66131

Builder

  • NameRNA Builders (NG)
  • Entity typePartnership
  • PartnersNarinderpal Gupta, TINA AGARWAL, PUJA AGRAWAL
  • Other registrations23 more →
  • Completed8 of 24
  • No longer live9 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredOct 2021First promiseDec 2026Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Oct 2021
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 31 Dec 2026)
  • Buildings1 building record
  • Documents filed151 files

Current status

9%15 of 173 units booked
83.4%Work done, per cost certificate

Figures as on 23 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1 - BNA30291667173

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 30%.

BUILDING NO 1 - B: 43% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises24%
Sanitary Fittings within the flats / premises7%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks7%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.3%

Progress on shared amenities15

As on 23 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed13

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots13
Closed/Covered6
Open Space7

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,150 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Oct 2025

Approvals and building plan

Sanctioning authorityMira Bhayandar Municipal Corporation
Permissible FSI7361.17
Proposed, not sanctioned7,361 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBOTAWALA CHAMBERS FORT MUMBAI 400 001
Estimated costRs 35.40 cr
Cost incurredRs 29.52 cr
Work done83.39%
BuildingWingEstimatedIncurred
BUILDING NO 1 - BNARs 23.60 crRs 27.51 cr
-NARs 11.80 crRs 2.01 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANISH & ASSOCIATES
EngineerSARIT GANGADHARAN
EngineerDivin Sivarajan
EngineerVINOD KUMAR PALSETIA
Chartered AccountantDHRUVAPRAKASH & CO
Chartered AccountantAnil B. Ghaisas &Co.
Chartered AccountantG. S.JHA & CO.
Chartered AccountantANIL B GHAISAS & CO.
Chartered AccountantG. S. JHA & CO.
PartnerRole in project
RNA Builders (NG)-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA28122519070Dec 2026 → Dec 2028

Reason as filed by the promoterDate: 26.12.2025 To, The Secretary, Maharashtra Real Estate Regulatory Authority (MahaRERA), Mumbai. Subject: Application for Extension of Project Completion Date under Section 7(3) of the RERA Act, 2016. Project Name: N G Grand Empire Phase II Project Registration No.: P51700031379 Promoter Name: RNA BUILDERS (NG) Project Address: N G Grand Empire phase II, Plot Bearing N G Grand Empire Phase II, Plot Bearing / CTS / Survey / Final Plot No.: 219/2 PT / 3B PT 230 /1,2,3 PT at Mira Bhayandar (M Corp.), Thane, 401105 Dear Sir/Madam, We, the undersigned promoter of the aforementioned project, her

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Nov 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed151

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 151 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM1 MARCH 2026.pdf23 Apr 2026
Withdrawal Update Form 2File: FORM2 MARCH 2026.pdf23 Apr 2026
Withdrawal Update Form 3File: FORM3MARCH2026.pdf23 Apr 2026
Withdrawal Update Form 1File: form 1 31122025.pdf9 Feb 2026
Withdrawal Update Form 1File: form 1 31122025.pdf9 Feb 2026
Withdrawal Update Form 1File: form 1 31122025.pdf9 Feb 2026
Withdrawal Update Form 2File: FORM2 31122025.pdf9 Feb 2026
Withdrawal Update Form 2File: FORM2 31122025.pdf9 Feb 2026
Withdrawal Update Form 2File: FORM2 31122025.pdf9 Feb 2026
Withdrawal Update Form 3File: form 331dec2025.pdf9 Feb 2026
Withdrawal Update Form 3File: form 331dec2025.pdf9 Feb 2026
Withdrawal Update Form 3File: form 331dec2025.pdf9 Feb 2026
Building plan approvalFile: GRAND EMPIRE LAYOUT PLAN APPROVAL - Copy.pdf5 Nov 2025
Layout approvalFile: GRNAD EMPIRE COMPRESSED LAYOUT PLAN.pdf5 Nov 2025
Building plan approvalFile: Elecrticity bill.pdf5 Nov 2025
Building plan approvalFile: PROJECT CORRECTION DECLARATION DOCUMENT.pdf5 Nov 2025
Form 1File: Form 1 311221.pdf13 Oct 2025
Form 2File: 31122021.pdf13 Oct 2025
Form 3File: N G GRAND EMPIRE II 2122 Q3.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD 31122021.pdf13 Oct 2025
Form 1File: FORM 1 310322.pdf13 Oct 2025
Form 2File: 31032022.pdf13 Oct 2025
Form 3File: N G GRAND EMPIRE II 2122 Q4.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD 31032022.pdf13 Oct 2025
Form 1File: FORM 1 300622.pdf13 Oct 2025
Form 2File: 30062022.pdf13 Oct 2025
Form 3File: N G GRAND EMPIRE II 2223 Q1.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD 30062022.pdf13 Oct 2025
Form 1File: FORM 1 300922.pdf13 Oct 2025
Form 2File: 30092022.pdf13 Oct 2025
Form 3File: N G GRAND EMPIRE II 2223 Q2.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD 30092022.pdf13 Oct 2025
Form 1File: FORM 1 311222.pdf13 Oct 2025
Form 2File: 31122022.pdf13 Oct 2025
Form 3File: N G GRAND EMPIRE II 2223 Q3.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD 31122022.pdf13 Oct 2025
Form 1File: form 1 310323.pdf13 Oct 2025
Form 2File: 31032023.pdf13 Oct 2025
Form 3File: N G GRAND EMPIRE II 2223 Q4.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD 31032023.pdf13 Oct 2025
Form 1File: FORM 1 300623.pdf13 Oct 2025
Form 2File: FORM 1 300623.pdf13 Oct 2025
Form 3File: N G GRAND EMPIRE II 2324 Q1.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD 30062023.pdf13 Oct 2025
Form 1File: FORM 1 300923.pdf13 Oct 2025
Form 2File: 30092023.pdf13 Oct 2025
Form 3File: N G GRAND EMPIRE II 2324 Q2.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD 30092024.pdf13 Oct 2025
Form 1File: FORM 1 311223.pdf13 Oct 2025
Form 2File: 31122023.pdf13 Oct 2025
Form 3File: 31122023.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD 31122023.pdf13 Oct 2025
Form 1File: Form 1 31032024.pdf13 Oct 2025
Form 2File: 31032024.pdf13 Oct 2025
Form 3File: N G GRAND EMPIRE II 2324 Q4.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD 31032024.pdf13 Oct 2025
Form 1File: form 1 300624.pdf13 Oct 2025
Form 2File: Form 2 010724.pdf13 Oct 2025
Form 3File: Form 3 300624.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD 30062024.pdf13 Oct 2025
Form 1File: FORM 1 300924.pdf13 Oct 2025
Form 2File: 30092024.pdf13 Oct 2025
Form 3File: Form 3 300924com.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD 30092024.pdf13 Oct 2025
Form 1File: form 1 311224.pdf13 Oct 2025
Form 2File: Form 2 010125.pdf13 Oct 2025
Form 3File: Form 3 311224com.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD 311224.pdf13 Oct 2025
Form 1File: form 1 310325.pdf13 Oct 2025
Form 2File: Form 2 010425.pdf13 Oct 2025
Form 3File: Form 3 310325com.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD 310325.pdf13 Oct 2025
Form 1File: form 1 300625.pdf13 Oct 2025
Form 2File: Form 2 010725.pdf13 Oct 2025
Form 3File: Form 3 300625com.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD 300625.pdf13 Oct 2025
Form 1File: FORM 1 300925.pdf13 Oct 2025
Form 2File: Form 2 011025.pdf13 Oct 2025
Form 3File: FORM 3 300925com.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD 300925.pdf13 Oct 2025

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
N G Regency TDR Extension ProjectMunicipal Pipe Road Adjoining Nicholas Piramal Mills Balkum Thane189CompletedMar 2014Mar 2014
NG Paradise TDR Extension Project Bldg 9Plot No.88 1 2 Ghodbunder Village Taluka Bassein District28CompletedNov 2013Late, Dec 2013
N G SterlingSurvey number 336 hissa number 5 village goddev district thane74CompletedJul 2013Late, Aug 2013

How this compares with Thane

9%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 24 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep N G GRAND EMPIRE PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAVGHAR7,600+ in Thane

2 kmN G GRAND EMPIRE PHASE ICompleted 37Lapsed / revoked 26Other 60Dot size: filed unitsN

Filed coordinates, straight-line distance. 123 registered projects within 2 km.

Builder: RNA Builders (NG)

RNA Builders (NG) has 24 registrations on MahaRERA, including N G Silver Spring and N G CANARY. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if N G GRAND EMPIRE PHASE II is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of N G GRAND EMPIRE PHASE II?

The registered promoter entity is RNA Builders (NG), a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in N G GRAND EMPIRE PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for N G GRAND EMPIRE PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at N G GRAND EMPIRE PHASE II?

The professionals named in the filing: Architect: ANISH & ASSOCIATES; Engineer: SARIT GANGADHARAN; Engineer: Divin Sivarajan; Engineer: VINOD KUMAR PALSETIA; Chartered Accountant: DHRUVAPRAKASH & CO; Chartered Accountant: Anil B. Ghaisas &Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in N G GRAND EMPIRE PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About N G GRAND EMPIRE PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save N G GRAND EMPIRE PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.