Registered No litigation declared Residential / Group Housing project

Murlidhar Homes Phase 1

By Devbhumi Construction

RG-MH-32408 · RERA PR1271012500209 · Last updated on MahaRERA portal: 13 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
3 of 9Construction stages donefurthest along: Slabs of Super Structure, 12%
97 of 98Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 14 documents Report an error

Murlidhar Homes Phase 1 is a Residential / Group Housing project by Devbhumi Construction in Raigarh, Maharashtra, registered with MahaRERA as PR1271012500209 on 4 Jul 2025. Possession is promised by 31 Dec 2030. 1 of the 98 units on this registration are recorded sold or booked, and 3 of 9 construction stages are filed complete.

At a glance

Project

  • NameMurlidhar Homes Phase 1
  • TypeResidential / Group Housing
  • Location
    • CTS No 4302
    • Khopoli
    • Khalapur
    • Raigarh
    • 410203
  • Pincode410203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1271012500209
  • ReraGenie IDRG-MH-32408

Builder

  • NameDevbhumi Construction
  • Entity typePartnership
  • PartnersHiren Sureshbhai Thesia, Mayur Suresh Thesia

Key dates

this monthRegisteredJul 2025PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Jul 2025
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed14 files

Current status

1%1 of 98 units booked
11.9%Work done, per cost certificate

Figures as on 13 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building BNA151498098

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 9 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 12%.

Building B: 35% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure12%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed52

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots52
Stilt / Ground52

Land and ownership7

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,670 sq m
Land owned byNot the promoter
Named landowners7
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Jun 2025
LandownerVillageDistrict
Anita Vijay BhivadeNew PanvelRaigarh
Manesh Malhari YadavNew PanvelRaigarh
Sandesh Malhari YadavNew PanvelRaigarh
Omkar Sambhaji YadavNew PanvelRaigarh
Vimal Maruti YadavNew PanvelRaigarh
Ganesh Maruti YadavNew PanvelRaigarh
Rakesh Maruti YadavNew PanvelRaigarh

Approvals and building plan

Sanctioning authorityKhopoli Municipal Council
Permissible FSI6564.57
Proposed, not sanctioned6,565 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBALAJI APTS, PLOT NO3 , SECTOR 19,PANVEL MATHERAN ROAD, NEW PANVEL
Estimated costRs 16.25 cr
Cost incurredRs 1.93 cr
Work done11.91%
BuildingWingEstimatedIncurred
Building BNARs 15.92 crRs 1.93 cr
-NARs 32.50 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARK Architectural and Structural Consultant
EngineerKunal Ranjane
EngineerSK Consultants & Engineers
Chartered AccountantNB Sayed and Associates
PartnerRole in project
Devbhumi Construction-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jun 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jun 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed14

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 Murlidhar Homes Phase 1 As on Mar 2026.pdf13 May 2026
Withdrawal Update Form 2File: Form-2 Murlidhar Homes Phase 1 As on Mar 2026.pdf13 May 2026
Withdrawal Update Form 3File: Form-3 Murlidhar Homes Phase 1 As on Mar 2026.pdf13 May 2026
Withdrawal Update Form 1File: form 1- Murlidhar Homes Phase 1 as on Dec 2025.pdf18 Jan 2026
Withdrawal Update Form 2File: Form 2 - Murlidhar Homes Phase 1 as on Dec 2025.pdf18 Jan 2026
Withdrawal Update Form 3File: Form 3 - Murlidhar Homes Phase 1 - Dec 2025.pdf18 Jan 2026
Withdrawal Update Form 1File: Form 1 - Murlidhar Homes Phase 1 as on Sep 2025.pdf19 Oct 2025
Withdrawal Update Form 2File: Form 2 - Murlidhar Homes Phase 1 as on Sep 2025.pdf19 Oct 2025
Withdrawal Update Form 3File: Form 3 - Murlidhar Homes Phase 1 as on Sept 2025.pdf19 Oct 2025
Layout approvalFile: Layout Murlidhar Homes.pdf10 Jun 2025
Building plan approvalFile: Approved Plan_ Murlidhar Homes Phase 1.pdf10 Jun 2025
Declaration and undertaking (Annexure A)File: Order 50 _Murlidhar Homes Phase 1.pdf10 Jun 2025
Building plan approvalFile: Approved Plan- Murlidhar Homes-2.pdf29 May 2025
Building plan approvalFile: Approved Plan- Murlidhar Homes-3.pdf29 May 2025

How this compares with Raigarh

1%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Murlidhar Homes Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Khopoli5,900+ in Raigarh

2 kmMurlidhar Homes Phase 1Completed 2Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: Devbhumi Construction

Devbhumi Construction has 1 registration on MahaRERA, including Murlidhar Homes Phase 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Murlidhar Homes Phase 1 is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Murlidhar Homes Phase 1?

The registered promoter entity is Devbhumi Construction, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Murlidhar Homes Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Murlidhar Homes Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Murlidhar Homes Phase 1?

The professionals named in the filing: Architect: ARK Architectural and Structural Consultant; Engineer: Kunal Ranjane; Engineer: SK Consultants & Engineers; Chartered Accountant: NB Sayed and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Murlidhar Homes Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Murlidhar Homes Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Murlidhar Homes Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.