Home / Browse projects / Raigarh, Maharashtra / Munot Vastu Exotica Phase -II

Registered Litigation declared Residential / Group Housing project

Munot Vastu Exotica Phase -II

By Vastu Infrastructure

RG-MH-83415 · RERA P52000034528 · Last updated on MahaRERA portal: 11 Aug 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 1 complaint at MahaRERA

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
4 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 85%
29 of 46Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 117 documents Report an error

Munot Vastu Exotica Phase -II is a Residential / Group Housing project by Vastu Infrastructure in Raigarh, Maharashtra, registered with MahaRERA as P52000034528 on 11 Apr 2022. Possession is promised by 31 Mar 2027. 17 of the 46 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMunot Vastu Exotica Phase -II
  • TypeResidential / Group Housing
  • Location
    • Thana Naka Road
    • Old Panvel
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000034528
  • ReraGenie IDRG-MH-83415

Builder

  • NameVastu Infrastructure
  • Entity typePartnership
  • PartnersVaibhav Atmaram Mhatre, Tejashree Rajesh Mhatre, Sandesh Atmaram Mhatre, Bhavin Ajit Dedhia
  • Other registrations3 more →

Key dates

this monthRegisteredApr 2022PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Apr 2022
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed117 files

Current status

37%17 of 46 units booked
76.8%Work done, per cost certificate

Figures as on 11 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B Wing - Upto 7th FloorNA8622022
B Wing - 8th to 13th FloorNA6624024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 11 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 85%.

B Wing - Upto 7th Floor72%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)85%
Plinth85%
Stilt Floor65%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises55%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
B Wing - 8th to 13th Floor72%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)85%
Plinth85%
Stilt Floor65%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises55%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%

Progress on shared amenities15

As on 11 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes65%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes55%
Storm Water DrainsYes65%
Landscaping & Tree PlantingYes60%
Street LightingYes40%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes45%
Solid Waste Management And DisposalYes35%
Water conservation /Rain water harvestingYes60%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes55%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed66

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots66
Closed/Covered66
BuildingClosed/CoveredTotal
B Wing - Upto 7th Floor3333
B Wing - 8th to 13th Floor3333

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,837 sq m
Land owned byNot the promoter
Named landowners2
LandownerVillageDistrict
Manoj Manakchand Munot-Raigarh
Manish Manakchand Munot-Raigarh

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI7447.62
Proposed, not sanctioned7,448 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot No 142 A Middle-Class Hsg Soc Post Box No 122 Panvel Dist Raigad Pin 410206
Estimated costRs 15.38 cr
Cost incurredRs 11.81 cr
Work done76.77%
BuildingWingEstimatedIncurred
B Wing - Upto 7th FloorNARs 7.31 crRs 5.70 cr
B Wing - 8th to 13th FloorNARs 7.31 crRs 5.70 cr
-NARs 76.92 lakhRs 41.95 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAAM Designs
EngineerSK Consultants & Engineers
EngineerKoushik V Thakur
Chartered AccountantNB Sayed & Associates
Chartered AccountantGaurav S Rajpal & Co
Chartered AccountantVikas Abhang & Associates
Chartered AccountantE A Patil & Associates LLP
PartnerRole in project
Vastu Infrastructure-

Litigation declared1

CaseCourtStatus
1372/2025Seinor Division Panvel CourtClosed

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12501265Mr Manakchand Chunilal MunotMallikarjun Narsingrao Gajre16/04/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Feb 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed117

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A - Phase - II.pdf11 Aug 2026
Withdrawal Update Form 1File: Form 1 - Munot_Vastu_Exotica_Phase_-Ii June 2026.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2 - Munot_Vastu_Exotica_Phase_-Ii June 2026.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 - Munot_Vastu_Exotica_Phase_-Ii June 2026.pdf20 Jul 2026
Withdrawal Update Form 1File: Form 1 - Munot Vastu Exotica Phase II as on March 2026.pdf16 Jun 2026
Withdrawal Update Form 2File: Form 2 - Munot Vastu Exotica Phase II as on March 2026.pdf16 Jun 2026
Withdrawal Update Form 3File: Form 3 - Munot Vastu Exotica Phase II as on March 2026.pdf16 Jun 2026
Building plan approvalFile: Munot Plans A B C Com.pdf20 Feb 2026
Form 5 (FY 2022-2023)File: Form 5 - Munot Phase 2 as on 2022-23.pdf16 Feb 2026
Form 5 (FY 2023-2024)File: Form 5 Munot Vastu Exotica Phase -II FY 23-24.pdf16 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 - Munot Phase II FY 2024-25.pdf16 Feb 2026
Form 2A (FY 2022-2023)File: Form 2A - Munot Vastu Exotica Phase II FY 2022-23.pdf14 Feb 2026
Form 2A (FY 2023-2024)File: Form 2A - Munot Vastu Exotica Phase II FY 2023-24.pdf14 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A - Munot Vastu Exotica Phase II FY 2024-25.pdf14 Feb 2026
Withdrawal Update Form 1File: Form 1 - Munot Vastu Exotica Phase 2 as on Dec 2025.pdf12 Feb 2026
Withdrawal Update Form 2File: Form 2 - Munot Vastu Exotica Phase 2 as on Dec 2025.pdf12 Feb 2026
Withdrawal Update Form 3File: Form 3 - Munot Vastu Exotica Phase 2 as on Dec 2025.pdf12 Feb 2026
Building plan approvalFile: Wing B -Highlighted.pdf10 Feb 2026
Withdrawal Update Form 1File: Form 1 - Munot Vastu Exotica Phase 2 as on Sept 2025.pdf21 Nov 2025
Withdrawal Update Form 2File: Form 2 - Munot Vastu Exotica Phase 2 as on Sept 2025.pdf21 Nov 2025
Withdrawal Update Form 3File: Form 3 - Munot Vastu Exotica Phase 2 as on Sept 2025.pdf21 Nov 2025
Form 1File: Form 1 - Munot Vastu Exotica Phase 2 as on June 2025.pdf20 Jul 2025
Form 2File: Form 2 - Munot Vastu Exotica Phase 2 as on June 2025.pdf20 Jul 2025
Form 3File: Form 3 - Munot Vastu Exotica Phase 2 as on June 2025.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Munot Vastu Exotica Phase 2 as on June 2025.pdf20 Jul 2025
Form 1File: Form 1 - Munot Vastu Exotica Phase 2 as on June 2025.pdf19 Jul 2025
Form 2File: Form 2 - Munot Vastu Exotica Phase 2 as on June 2025.pdf19 Jul 2025
Form 3File: Form 3 - Munot Vastu Exotica Phase 2 as on June 2025.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Munot Vastu Exotica Phase 2 as on June 2025.pdf19 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Munot Vastu Exotica Phase 2 as on March 2025.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Munot Vastu Exotica Phase 2 as on March 2025.pdf19 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Munot Vastu Exotica Phase -II FY 23-24.pdf1 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Munot Vastu Exotica Phase 2 as on March 2024 (REVISED).pdf27 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Munot Vastu Exotica Phase 2 as on June 2024 (REVISED).pdf27 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Munot Vastu Exotica Phase 2 as on Sep 2024 (REVISED).pdf27 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Munot Vastu Exotica Phase 2 as on Dec 2024 (REVISED).pdf27 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Munot Vastu Exotica Phase 2 as on June 2024.pdf27 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Munot Vastu Exotica Phase 2 as on Sept 2024.pdf27 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Munot Vastu Exotica Phase 2 as on 31-12-2024.pdf27 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration - Phase - II.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Munot Vastu Exotica Phase 2 - 31-12-2024.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Munot Vastu Exotica Phase 2 as on 31-12-2024.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Munot Vastu Exotica Phase 2 as on December 2024.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Munot Vastu Exotica Phase 2 as on 30-09-2024.pdf28 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Munot Vastu Exotica Phase 2 - 30-09-2024.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Munot Vastu Exotica Phase 2 as on Sept 2024.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Munot Vastu Exotica Phase 2 as on June 2024.pdf25 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Munot Vastu Exotica Phase 2 as on June 2024.pdf25 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 13 CA Certificate on Project Cost.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Munot Vastu Exotica Phase 2 March 24.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Munot Vastu Exotica Phase 2 - 31-03-2024.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Report - Phase -II.pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Munot Vastu Exotica Phase 2 - 13-05-2023.pdf20 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Munot Vastu Exotica Phase 2 Dec 23.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Munot Vastu Exotica Phase 2 - 31-12-2023.pdf12 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Munot Vastu Phase II as on Dec 2023.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 -ConfirmationPhase-II.pdf22 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MVE Phase-II_Form 1_Certificate.pdf17 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Munot Vastu Exotica Phase 2 Sept 23 - Form 2.pdf23 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Munot Vastu Exotica Phase 2 - 30-09-2023.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Munot Phase 2 as on 2022-23.pdf29 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form- 1 Phase- II.pdf11 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Munot Vastu Exotica Phase II as on 30-06-2023.pdf11 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Munot Vastu Exotica Phase II as on 30-06-2023.pdf11 Jul 2023
Declaration about Commencement CertificateFile: Munot Vastu Exotica Phase 2.pdf24 May 2023
Commencement Certificates / NA Order for plotted developmentFile: CC - Munot Vastu.pdf20 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Munot Vastu Exotica Phase II - Landowner.pdf9 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Munot Vastu Exotica Phase II - Landowner 31-03-2023.pdf9 May 2023
Building plan approvalFile: 02_compressed.pdf25 Apr 2023
Building plan approvalFile: 04_compressed.pdf25 Apr 2023
Building plan approvalFile: 05_compressed.pdf25 Apr 2023
Building plan approvalFile: 06_compressed.pdf25 Apr 2023
Building plan approvalFile: 07_compressed.pdf25 Apr 2023
Building plan approvalFile: 08_compressed.pdf25 Apr 2023
Building plan approvalFile: 09_compressed.pdf25 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 01_compressed.pdf25 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 02_compressed.pdf25 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 03_compressed.pdf25 Apr 2023

How this compares with Raigarh

37%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Munot Vastu Exotica Phase -II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Old Panvel5,900+ in Raigarh

2 kmMunot Vastu Exotica PhasCompleted 173Lapsed / revoked 58Other 151Dot size: filed unitsN

Filed coordinates, straight-line distance. 382 registered projects within 2 km.

Builder: Vastu Infrastructure

Vastu Infrastructure has 4 registrations on MahaRERA, including Munot Vastu Exotica Phase -I and Munot Vastu Exotica Phase -II. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Munot Vastu Exotica Phase -II is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Munot Vastu Exotica Phase -II?

The registered promoter entity is Vastu Infrastructure, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Munot Vastu Exotica Phase -II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Munot Vastu Exotica Phase -II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Munot Vastu Exotica Phase -II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Munot Vastu Exotica Phase -II?

The professionals named in the filing: Architect: AAM Designs; Engineer: SK Consultants & Engineers; Engineer: Koushik V Thakur; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Gaurav S Rajpal & Co; Chartered Accountant: Vikas Abhang & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Munot Vastu Exotica Phase -II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Munot Vastu Exotica Phase -II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Munot Vastu Exotica Phase -II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.