MUKUNDAM

By Shree Ramjeevdani Realtors

RG-MH-54435 · RERA P51700017888 · Last updated on MahaRERA portal: 15 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • Completion date moved by 40 months
  • 4 extensions taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 40 months from the original
17 of 22Construction stages doneacross 2 buildings; furthest along: External plumbing and external plaster, 80%
106 of 250Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 193 documents Report an error

MUKUNDAM is a Residential / Group Housing project by Shree Ramjeevdani Realtors in Thane, Maharashtra, registered with MahaRERA as P51700017888 on 24 Sep 2018. Possession is promised by 28 Dec 2027. The completion date has moved by 40 months from the original filing. 144 of the 250 units on this registration are recorded sold or booked, and 17 of 22 construction stages are filed complete.

At a glance

Project

  • NameMUKUNDAM
  • TypeResidential / Group Housing
  • Location
    • 150 FT ROAD UTTAN ROAD
    • BHAYANDER WEST
    • BHAYANDAR
    • Thane
    • 401101
  • Pincode401101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700017888
  • ReraGenie IDRG-MH-54435

Builder

  • NameShree Ramjeevdani Realtors
  • Entity typePartnership
  • PartnersKISHOR MORESHWAR BHOIR HUF, NAROTTAM MORESHWAR BHOIR HUF, KAPIL KIMTILAL GUPTA, MORESHWAR MUKUND BHOIR HUF

Key dates

this monthRegisteredSep 2018First promiseAug 2024Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Sep 2018
  • Promised completion28 Dec 2027
  • Revised completionRevised to 28 Dec 2027 (originally 29 Aug 2024)
  • Buildings2 building records
  • Documents filed193 files

Current status

58%144 of 250 units booked
89.0%Work done, per cost certificate

Figures as on 15 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA27271500150
B WINGNA27271000100

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 80%.

A WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B WING70%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises66%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed186

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots186
Closed/Covered186
BuildingClosed/CoveredTotal
A WING9393
B WING9393

Land and ownership14

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,076 sq m
Land owned byThe promoter, with other names on the file
Named landowners14
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Aug 2025
LandownerVillageDistrict
BHASKAR MORESHWAR BHOIRBHAYANDARThane
BHUPESH BHASKAR BHOIRBHAYANDARThane
BHAGASHRI BHASKAR BHOIRBHAYANDARThane
HANSA BHASKAR BHOIRBHAYANDARThane
NEETA NANDAN PATILBHAYANDARThane
KISHOR MORESHWAR BHOIRBHAYANDARThane
SUNANDA KISHOR BHOIRBHAYANDARThane
PRAJAKTA KISHOR BHOIRBHAYANDARThane
VASUNDHARA PRAVIN MHATREBHAYANDARThane
NAROTTAM MORESHWAR BHOIRBHAYANDARThane
HITESH NAROTTAM BHOIRBHAYANDARThane
NAMRATA NAROTTAM BHOIRBHAYANDARThane
REKHA NAROTTAM BHOIRBHAYANDARThane
LATE MORESHWAR MUKUND BHOIRBHAYANDARThane

Approvals and building plan

Sanctioning authorityMIRA BHAYANDAR MUNICIPAL CORPORATION
Permissible FSI26694.72
Proposed, not sanctioned26,585 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch60 FEET ROAD BHAYANDER WEST DISTRICT THANE 401 101
Estimated costRs 100.00 cr
Cost incurredRs 89.00 cr
Work done89.0%
BuildingWingEstimatedIncurred
A WINGNARs 100.00 crRs 89.00 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUDHIN PATIL
EngineerRAJESH B DUBEY
EngineerSAHIL SIDDIQUE
EngineerJIGNESH HEMJI MACHHI
Chartered AccountantNITESH MAHENDRA KOTHARI
Chartered AccountantNIKUNJ G BHANGARIA
PartnerRole in project
Shree Ramjeevdani Realtors-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700024353Aug 2024 → Aug 2025

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B.

EA11082502351Aug 2024 → Aug 2026

Reason as filed by the promoter1. We have completed 75% work of the Project. 2. We are in the process of completing the remaining project work and procuring the Occupancy Certificate & Form 4 - Architect’s Certificate on Completion of Project. 3. We have already received part occupancy certificate for our project. 4. We have also taken consent for extension from more than 51% of allottees. 5. The remaining project work & process of procuring the Occupancy Certificate will be completed by 29/08/2026.

EA18072621786Aug 2024 → Aug 2027

Reason as filed by the promoter1. We have completed 85% work of the Project. 2. We are in the process of completing the remaining project work and procuring the Occupancy Certificate & Form 4 - Architect’s Certificate on Completion of Project. 3. We have already obtained Part Occupancy Certificate for Wing A, pursuant to which possession of units in Wing A has been handed over to the respective allottees. 4. The balance work pertaining to Wing B and allied infrastructure is presently under execution. However, the progress of the remaining construction activities has been adversely affected due to disruptions in the supply c

P51700017888/WarAug 2024 → Dec 2027

Reason as filed by the promoterNA

Litigation declared2

CaseCourtStatus
755/2019THANE, DISTRICT AND SESSIONS COURTOngoing
277/2020THANE COURTOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Sep 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Aug 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 28 Dec 2027

Documents filed193

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 193 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form 2A_ FY 24-25.pdf15 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A_ FY 25-26.pdf15 Jul 2026
Withdrawal Update Form 1File: Form 1_Architect certificate_Jun 26.pdf14 Jul 2026
Withdrawal Update Form 2File: Form 2_Engineers Certifiacte_Jun 26.pdf14 Jul 2026
Withdrawal Update Form 3File: Form 3_CA Certificate_Jun 26.pdf14 Jul 2026
Withdrawal Update Form 1File: Form 1_Architect Certificate_Mar 2026.pdf8 May 2026
Withdrawal Update Form 2File: Form 2_Engineers Certificate_Mar 2026.pdf8 May 2026
Withdrawal Update Form 3File: Form 3_CA Certificate_Mar 2026.pdf8 May 2026
Withdrawal Update Form 1File: Form 1_ Architech Certificate_31-12-2025.pdf20 Feb 2026
Withdrawal Update Form 2File: Form 2_Engineers Certificate.pdf20 Feb 2026
Withdrawal Update Form 3File: Form 3_CA Certificate_31-12-2025.pdf20 Feb 2026
Form 5 (FY 2024-2025)File: Form 5_CA Certificate_01042024-31032025.pdf20 Feb 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate 30 Sep 2025.pdf12 Dec 2025
Withdrawal Update Form 2File: Form 2 Engineers Certificate 30 Sep 2025.pdf12 Dec 2025
Withdrawal Update Form 3File: Form 3 CA Certificate 30 Sep 2025.pdf12 Dec 2025
Commencement certificateFile: Commencement Certificate_B_Dec 2024.pdf7 Aug 2025
Form 1File: Form 1_Architech Certificate_June 2024.pdf7 Aug 2025
Form 2File: Form 2_Engineer Certificate_June 2024.pdf7 Aug 2025
Form 3File: Form 3_CA Certificate_Jun 2024.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold_Booked Inventory_Jun 2024.pdf7 Aug 2025
Form 1File: Form 1_Architect Certificate _Sept 2024.pdf7 Aug 2025
Form 2File: Form 2_Engineers Certificate Sept 2024.pdf7 Aug 2025
Form 3File: Form 3_CA Certificate_Sept 2024 (2).pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold_Booked Inventory_Sep 2024.pdf7 Aug 2025
Form 1File: Form 1_Architect Certificate _Dec 2024.pdf7 Aug 2025
Form 2File: Form 2_Engineers Certificate Dec 2024.pdf7 Aug 2025
Form 3File: Form 3_CA_Dec 2024.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold_Booked Inventory_Dec 2024.pdf7 Aug 2025
OthersFile: Form 5_CA_2023-24.pdf7 Aug 2025
Form 1File: Form 1 Architect Certificate_Mar 2025.pdf7 Aug 2025
Form 2File: Form 2_Engineers Certificate Mar 2025.pdf7 Aug 2025
Form 3File: Form 3_CA Certificate_Mar 2025.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold_Booked Inventory_Mar 2025.pdf7 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate_Mar 2025.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineers Certificate Mar 2025.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory_Mar 2025.pdf23 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_CA_2023-24.pdf26 Feb 2025
Certificates of CA (Form 3)File: Form 3_CA Certificate_Sept 2024.pdf13 Feb 2025
Layout approvalFile: Approved Plan_Layout_Dec 2024.pdf25 Jan 2025
Building plan approvalFile: Approved Plan_Bldg Plan_Dec 2024.pdf25 Jan 2025
Copy of Layout Approval (in case of layout)File: Approved Plan_Layout_Dec 2024.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect Certificate _Dec 2024.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineers Certificate Dec 2024.pdf25 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_Dec 2024.pdf25 Jan 2025
Building Plan Approval (IOD)File: Approved Plan_Bldg Plan_Dec 2024.pdf25 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory_Dec 2024.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect Certificate _Sept 2024.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineers Certificate Sept 2024.pdf9 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory_Sep 2024.pdf9 Nov 2024
Certificates of CA (Form 3)File: Form 3_CA Certificate_Jun 2024.pdf17 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 2024 Signed.pdf30 Jul 2024
Form 2AFile: Form 2A 19-20.pdf29 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf29 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf29 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf29 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf29 Jul 2024
Disclosure of sold/ booked inventoryFile: 13 Disclosure of sold_ booked inventory.pdf29 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory_Jun 2024.pdf26 Jul 2024
Layout approvalFile: Sheet 1_2024.pdf24 Jul 2024
Building plan approvalFile: Sheet 2_2024.pdf24 Jul 2024
Copy of Layout Approval (in case of layout)File: Sheet 1_2024.pdf24 Jul 2024
Building Plan Approval (IOD)File: Sheet 2_2024.pdf24 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_2024.pdf24 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architech Certificate_June 2024.pdf24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer Certificate_June 2024.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory_Jun 2024.pdf24 Jul 2024
Declaration in FORM BFile: Form-B-Affidavit.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: Information of Sold_Booked Inventory March 2024.pdf16 Jul 2024
Certificates of CA (Form 3)File: Form 3_CA_Mar 2024.pdf7 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect's Certificate_Mar 2024.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer's Certificate_Mar 2024.pdf8 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Quality Certificate_Mar 2024.pdf8 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory_Mar 2024.pdf8 Apr 2024
Certificates of CA (Form 3)File: Form 3_CA_Dec 2023.pdf15 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect Certificate_Dec 2023.pdf9 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineers Certificate_Dec 2023.pdf9 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Quality Certificate_Dec 2023.pdf9 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory_Dec 2023.pdf9 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_CA_2022-23.pdf1 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_2021-22 (2).pdf1 Jan 2024

How this compares with Thane

58%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 40 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MUKUNDAM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHAYANDER WEST7,600+ in Thane

2 kmMUKUNDAMCompleted 20Lapsed / revoked 14Other 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 76 registered projects within 2 km.

Builder: Shree Ramjeevdani Realtors

Shree Ramjeevdani Realtors has 1 registration on MahaRERA, including MUKUNDAM. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if MUKUNDAM is delayed beyond 28 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MUKUNDAM?

The registered promoter entity is Shree Ramjeevdani Realtors, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MUKUNDAM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MUKUNDAM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MUKUNDAM?

The professionals named in the filing: Architect: SUDHIN PATIL; Engineer: RAJESH B DUBEY; Engineer: SAHIL SIDDIQUE; Engineer: JIGNESH HEMJI MACHHI; Chartered Accountant: NITESH MAHENDRA KOTHARI; Chartered Accountant: NIKUNJ G BHANGARIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MUKUNDAM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MUKUNDAM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MUKUNDAM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.