Red flags
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MOULI NAGARI is a Plotted project by VIMAL DOMAJI KORDE in Nagpur, Maharashtra, registered with MahaRERA as P50500046889 on 16 Sep 2022. Possession is promised by 31 Dec 2027. The completion date has moved by 24 months from the original filing. 11 of the 16 units on this registration are recorded sold or booked.
At a glance
Project
- NameMOULI NAGARI
- TypePlotted
- Location
- KH NO 509
- PH NO 23
- Gumthala
- Kamptee
- Nagpur
- 441104
- Pincode441104
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500046889
- ReraGenie IDRG-MH-16349
Builder
- NameVIMAL DOMAJI KORDE
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 Sep 2022
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2025)
- BuildingsNot stated in filing
- Documents filed97 files
Current status
Figures as on 4 Jun 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 4 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 4 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 30.60 lakh | Rs 75.50 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NIRAJ S BAINGANE |
| Engineer | NIRAJ S BAINGANE |
| Chartered Accountant | CA SUBHASH RAHANGDALE |
| Chartered Accountant | PRASHANT SHARMA |
| Partner | Role in project |
|---|---|
| VIMAL DOMAJI KORDE | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterdue to delay in obtaining certain statutory approvals from Nagpur Metropolitan Region Development Authority
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Oct 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jul 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 31 Oct 2024
Documents filed97
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form-1 March 26.pdf | 4 Jun 2026 |
| Withdrawal Update Form 2File: Form-2 March 26.pdf | 4 Jun 2026 |
| Withdrawal Update Form 3File: 01 Form 3 March 26_merged_compressed.pdf | 4 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Mouli Dec-25_compressed.pdf | 11 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Sept 2025.pdf | 11 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Mouli Dec-25_compressed.pdf | 11 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Sept 2025.pdf | 18 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Sept 2025.pdf | 18 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate_compressed.pdf | 18 Jan 2026 |
| Form 1File: Form 1 Dec -24.pdf | 7 Sep 2025 |
| Form 2File: Form 2 Dec -24.pdf | 7 Sep 2025 |
| Form 3File: Mouli Form 3 Dec - 24.pdf | 7 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Dec - 24.pdf | 7 Sep 2025 |
| Form 1File: Form 1 Sept 2024.pdf | 7 Sep 2025 |
| Form 2File: Form 2 Sept 2024.pdf | 7 Sep 2025 |
| Form 3File: Form 3 Sept 2024.pdf | 7 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Sept 2024.pdf | 7 Sep 2025 |
| Form 1File: Form 1 June 2024.pdf | 7 Sep 2025 |
| Form 2File: Form 2 June 2024.pdf | 7 Sep 2025 |
| Form 3File: Form 3 June 2024.pdf | 7 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked June 2024.pdf | 7 Sep 2025 |
| Form 3File: Form 3 March - 24.pdf | 7 Sep 2025 |
| Form 1File: Form 1 March 2024.pdf | 7 Sep 2025 |
| Form 2File: Form 2 March 2024.pdf | 7 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked March 2024.pdf | 7 Sep 2025 |
| Withdrawal Update Form 1File: 004 Form 1 Architect Certificate Dec-23 Mouli Nagari.pdf | 7 Sep 2025 |
| Withdrawal Update Form 2File: Form 2 31-12-23.pdf | 7 Sep 2025 |
| Withdrawal Update Form 3File: Form 3 March - 24.pdf | 7 Sep 2025 |
| Form 5 (FY 2024-2025)File: Mouli Form 5 FY 24 25.pdf | 7 Sep 2025 |
| Form 5 (FY 2023-2024)File: Form 5 F Y 2023 - 24.pdf | 7 Sep 2025 |
| Withdrawal Update Form 1File: 004 Form 1 Architect Certificate Dec-23 Mouli Nagari.pdf | 24 Aug 2025 |
| Withdrawal Update Form 1File: 004 Form 1 Architect Certificate Dec-23 Mouli Nagari.pdf | 24 Aug 2025 |
| Withdrawal Update Form 2File: Form 2 31-12-23.pdf | 24 Aug 2025 |
| Withdrawal Update Form 2File: Form 2 31-12-23.pdf | 24 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 March - 24.pdf | 24 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 March - 24.pdf | 24 Aug 2025 |
| Form 2File: Form 2 Engineer Certificate March 25.pdf | 6 Jul 2025 |
| Form 3File: Form 3 March 25.pdf | 6 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold March 25.pdf | 6 Jul 2025 |
| Form 1File: Form 1 Architect Certificate March 25.pdf | 6 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec -24.pdf | 6 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mouli Form 3 Dec - 24.pdf | 6 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec -24.pdf | 6 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Dec - 24.pdf | 6 Mar 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1ST RL.pdf | 31 Oct 2024 |
| Layout approvalFile: Map 16-8-24_compressed.pdf | 30 Oct 2024 |
| Copy of Layout Approval (in case of layout)File: Map 16-8-24_compressed.pdf | 30 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2024.pdf | 30 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 2024.pdf | 30 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 2024.pdf | 30 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2024.pdf | 30 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept 2024.pdf | 30 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2024.pdf | 30 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 2024.pdf | 30 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 2024.pdf | 30 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Development Agreement with NMRDA.pdf | 30 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Booked March 2024.pdf | 30 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Booked June 2024.pdf | 30 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Booked Sept 2024.pdf | 30 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March - 24.pdf | 17 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 F Y 2023 - 24.pdf | 17 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-12-23.pdf | 28 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: 01 Disclosure of sold booked 31-03-23.pdf | 28 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: 02 Disclosure of sold booked 30-06-23.pdf | 28 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: 03 Disclosure of sold booked 30- 09-23.pdf | 28 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: 04 disclosed of sold booked 31-12-23.pdf | 28 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec-23.pdf | 28 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 002 Form 1 Architect Certificate June-23 Mouli Nagari.pdf | 30 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 003 Form 1 Architect Certificate Sept-23 Mouli Nagari.pdf | 30 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 004 Form 1 Architect Certificate Dec-23 Mouli Nagari.pdf | 30 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30-6-23.pdf | 28 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30-9-23.pdf | 28 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 001 Form 2 Engineer Certificate March-23 Mouli Nagari.pdf | 3 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 002 Form 2 Engineer Certificate June-23 Mouli Nagari.pdf | 3 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 003 Form 2 Engineer Certificate Sept-23 Mouli Nagari.pdf | 3 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 CA Certificate FY 22-23 Mouli Nagari .pdf | 3 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31-12-22.pdf | 17 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31-03-23.pdf | 17 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-3-2.pdf | 21 May 2023 |
| Deviation Report with respect to model copy of AgreementFile: AGREEMENT DRAFT.pdf | 9 Sep 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 97 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MOULI NAGARI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PH NO 232,800+ in Nagpur
Mangala Estate
Raju Itkelwar
Snehsagar Nagari
Harshit Pawankumar Agrawal
DHARGAON INDUSTRIAL ESTATE
VINOD BALBHADRA GOENKA
EKATMATA NAGAR PHASE-I
SURAJ DAMODHAR AWALE, RAJESH JAYWANT RAUT,
EKATMATA NAGAR PHASE-II
SURAJ DAMODHAR AWALE and RAJESH JAYWANT RA
SAVITRI ENCLAVE-2
SHREE SHIVANAND REALITIES
See every Nagpur project, with the district possession charts
Builder: VIMAL DOMAJI KORDE
VIMAL DOMAJI KORDE has 1 registration on MahaRERA, including MOULI NAGARI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if MOULI NAGARI is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MOULI NAGARI?
The registered promoter entity is VIMAL DOMAJI KORDE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MOULI NAGARI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MOULI NAGARI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MOULI NAGARI?
The professionals named in the filing: Architect: NIRAJ S BAINGANE; Engineer: NIRAJ S BAINGANE; Chartered Accountant: CA SUBHASH RAHANGDALE; Chartered Accountant: PRASHANT SHARMA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MOULI NAGARI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback