MORYA HEIGHTS
RG-MH-06296 · RERA P51700053294 · Last updated on MahaRERA portal: 8 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MORYA HEIGHTS is a Residential / Group Housing project by MORYA DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700053294 on 23 Oct 2023. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 31 of the 76 units on this registration are recorded sold or booked, and 13 of 31 construction stages are filed complete.
At a glance
Project
- NameMORYA HEIGHTS
- TypeResidential / Group Housing
- Location
- Maharashtra
- Vashind
- Washind (CT)
- Shahapur
- Thane
- 421601
- Pincode421601
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700053294
- ReraGenie IDRG-MH-06296
Builder
- NameMORYA DEVELOPERS
- Entity typePartnership
- PartnersMohammed Saif Sarfaraz Shaikh, Lavesh Raju Asarani, Rajashree Vikram Jadhav, Girish Mohan Lulla, Hitesh Hareshlal Kukreja
- Other registrations5 more →
- No longer live5 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on23 Oct 2023
- Promised completion30 Jun 2026
- Revised completionNone
- Buildings3 building records
- Documents filed86 files
Current status
Figures as on 8 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building No 01 | NA | 8 | 8 | 63 | 4 | 67 |
| MORYA HEIGHT | NA | 7 | 3 | 0 | 0 | 0 |
| Building No 02 | NA | 4 | 3 | 9 | 0 | 9 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 8 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
13 of 31 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 90%.
Building No 0185%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
MORYA HEIGHT67%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Building No 0282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 8 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 10% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed176
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| Building No 01 | 155 | 155 |
| Building No 02 | 21 | 21 |
Land and ownership4
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| RIYA MAHESH KABADAI | Shahapur (CT) | Thane |
| SARITA MAHENDRA NAVDHARE | Shahapur (CT) | Thane |
| NAZIYA S SHAIKH | Kalyan | Thane |
| RAJESH K VANJARANI | Kalyan | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building No 01 | NA | Rs 5.28 cr | Rs 5.29 cr |
| MORYA HEIGHT | NA | Rs 2.16 cr | Rs 1.92 cr |
| - | NA | Rs 4.00 lakh | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MAK DESIGN AND CO |
| Engineer | BHANUVILAS P BHAVSAR |
| Engineer | JHAMANDAS MANGTANI |
| Chartered Accountant | DEEPAK GAGE AND ASSOCIATES |
| Chartered Accountant | MANOJ SOLHAVAN PAL |
| Partner | Role in project |
|---|---|
| MORYA DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Jul 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 May 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed86
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Building plan approvalFile: New Plan copy2.pdf | 8 May 2026 |
| Building plan approvalFile: New Plan copy1.pdf | 8 May 2026 |
| Building plan approval or NA orderFile: NA Order1.pdf | 8 May 2026 |
| Withdrawal Update Form 1File: Form1 Morya DevN.pdf | 7 May 2026 |
| Withdrawal Update Form 1File: Form1.pdf | 7 May 2026 |
| Withdrawal Update Form 1File: Form1 fnl March 26.pdf | 7 May 2026 |
| Withdrawal Update Form 2File: Form 2 Sept 25.pdf | 7 May 2026 |
| Withdrawal Update Form 2File: Form 2 Dec 25.pdf | 7 May 2026 |
| Withdrawal Update Form 2File: Form 2 fnl Morya March 26.pdf | 7 May 2026 |
| Withdrawal Update Form 3File: Form 3 q2 Morya Dev.pdf | 7 May 2026 |
| Withdrawal Update Form 3File: Form 3 Dec 25.pdf | 7 May 2026 |
| Withdrawal Update Form 3File: Form 3 Fnl March 26.pdf | 7 May 2026 |
| Form 1File: Form 1.pdf | 24 Apr 2026 |
| Form 2File: Form 2.pdf | 24 Apr 2026 |
| Form 3File: Form 3.pdf | 24 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure Morya Developers.pdf | 24 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure Morya Developers.pdf | 24 Apr 2026 |
| Form 1File: Form 1 June 2024 Morya.pdf | 24 Apr 2026 |
| Form 2File: Form 2 June 24.pdf | 24 Apr 2026 |
| Form 3File: Form 3_ June 24 fnl.pdf | 24 Apr 2026 |
| Form 1File: Form 1 Dec 2023 Morya.pdf | 24 Apr 2026 |
| Form 2File: Form 2 Dec 23.pdf | 24 Apr 2026 |
| Form 3File: Form 3_ Dec 23 fnl.pdf | 24 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure Morya Developers.pdf | 24 Apr 2026 |
| Form 1File: Form 1 March 2024 Morya.pdf | 24 Apr 2026 |
| Form 2File: Form 2 March 24.pdf | 24 Apr 2026 |
| Form 3File: Form 3_ March 24 fnl.pdf | 24 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure Morya Developers.pdf | 24 Apr 2026 |
| Form 1File: Form 1 Dec24.pdf | 24 Apr 2026 |
| Form 2File: Form 2 Dec 24.pdf | 24 Apr 2026 |
| Form 3File: Form 3 Dec 24 Fnl.pdf | 24 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory.pdf | 24 Apr 2026 |
| Form 1File: Form 1 March 25 Morya.pdf | 24 Apr 2026 |
| Form 2File: Form 2 MARCH 25 Final.pdf | 24 Apr 2026 |
| Form 3File: Form 3 March 25 Morya.pdf | 24 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold March 25.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Dec 2023 Morya.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: June 2025 Form 2.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 June 25.pdf | 24 Apr 2026 |
| Form 2A (FY 2024-2025)File: Form 2A Morya Heights March 2025.pdf | 31 Mar 2026 |
| Form 2A (FY 2023-2024)File: Form 2A supervisor certificate.pdf | 23 Mar 2026 |
| Form 5 (FY 2023-2024)File: Form 5 morya 31 March 24.pdf | 18 Mar 2026 |
| Form 5 (FY 2024-2025)File: Form 5 Morya Heights2025.pdf | 18 Mar 2026 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Disclosure Morya Developers.pdf | 25 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 2023 Morya.pdf | 4 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2024 Morya.pdf | 4 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 2024 Morya.pdf | 4 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 2024 Morya.pdf | 4 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2023 Morya.pdf | 4 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ Sept 24 fnl.pdf | 4 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ June 24 fnl.pdf | 4 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ March 24 fnl.pdf | 4 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ Dec 23 fnl.pdf | 4 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ Sept 23 fnl.pdf | 4 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 23.pdf | 4 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 23.pdf | 4 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 24.pdf | 4 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 24.pdf | 4 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 24.pdf | 4 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A supervisor certificate.pdf | 4 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 morya 31 March 24.pdf | 4 Dec 2024 |
| Other - LegalFile: NA Order Page 1.pdf | 11 Oct 2023 |
| Other - LegalFile: NA Order Page 2.pdf | 11 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: Encumberance Finance_final.pdf | 7 Aug 2023 |
| Details of encumbrances concerned to LegalFile: Encumberance Finance_final.pdf | 7 Aug 2023 |
| Layout approvalFile: HPSCANNER3634_compressed.pdf | 19 Jul 2023 |
| Building plan approvalFile: HPSCANNER3634_compressed.pdf | 19 Jul 2023 |
| PAN CardFile: PAN PARTNERSHIP.pdf | 19 Jul 2023 |
| Copy of the legal title reportFile: legal title search certificate_F.pdf | 19 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: Encumberance Legal_final.pdf | 19 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: legal encumbrance.pdf | 19 Jul 2023 |
| Details of encumbrances concerned to LegalFile: Encumberance Legal_final.pdf | 19 Jul 2023 |
| Details of encumbrances concerned to LegalFile: legal encumbrance.pdf | 19 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: HPSCANNER3634_compressed.pdf | 19 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER3634_compressed.pdf | 19 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf | 19 Jul 2023 |
| Declaration about Commencement CertificateFile: Comencenent Certificate Disclosure.pdf | 19 Jul 2023 |
| Declaration in FORM BFile: Form B - Promoter.pdf | 19 Jul 2023 |
| CERSAI detailsFile: CERSAI_Final.pdf | 19 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf | 19 Jul 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 86 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MORYA HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Vashind7,600+ in Thane
Filed coordinates, straight-line distance. 32 registered projects within 2 km.
BELLA VISTA PHASE 8
INDO ASIAN BUILDCON PVT LTD
RUSTOMJEE BELLE VUE
KEYSTONE REALTORS LIMITED
THE VENISCAPE
MIVAAN BUILDCON PRIVATE LIMITED
VISION SKY WORLD
M/S VISION SKY WORLD
Sunteck FORESTWorld 1
SUNTECK REALTY HOLDINGS PVT LTD
Sunteck FORESTWorld 2
SUNTECK REALTY HOLDINGS PVT LTD
See every Thane project, with the district possession charts
Builder: MORYA DEVELOPERS
MORYA DEVELOPERS has 6 registrations on MahaRERA, including AAYUSH PARADISE and MORYA ALPHANSO. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that MORYA HEIGHTS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if MORYA HEIGHTS is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MORYA HEIGHTS?
The registered promoter entity is MORYA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MORYA HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MORYA HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MORYA HEIGHTS?
The professionals named in the filing: Architect: MAK DESIGN AND CO; Engineer: BHANUVILAS P BHAVSAR; Engineer: JHAMANDAS MANGTANI; Chartered Accountant: DEEPAK GAGE AND ASSOCIATES; Chartered Accountant: MANOJ SOLHAVAN PAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MORYA HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback