Home / Browse projects / Nagpur, Maharashtra / MORAJ WATERFALL GATEWAY RIVER BLOCK
MORAJ WATERFALL GATEWAY RIVER BLOCK
By MORAJ INFRATECH PRIVATE LIMITED
RG-MH-66375 · RERA P50500017334 · Last updated on MahaRERA portal: 2 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 56 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MORAJ WATERFALL GATEWAY RIVER BLOCK is a Others project by MORAJ INFRATECH PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500017334 on 7 Aug 2018. Possession is promised by 30 Nov 2026. The completion date has moved by 56 months from the original filing. 34 of the 113 units on this registration are recorded sold or booked, and 13 of 22 construction stages are filed complete.
At a glance
Project
- NameMORAJ WATERFALL GATEWAY RIVER BLOCK
- TypeOthers
- Location
- SECTOR 21
- MIHAN
- Khapari
- Nagpur (Rural)
- Nagpur
- 441108
- Pincode441108
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500017334
- ReraGenie IDRG-MH-66375
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on7 Aug 2018
- Promised completion30 Nov 2026
- Revised completionRevised to 30 Nov 2026 (originally 30 Mar 2022)
- Buildings2 building records
- Documents filed96 files
Current status
Figures as on 2 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GANGA - A | NA | 14 | 14 | 73 | 0 | 73 |
| COMMERCIAL WING | NA | 3 | 3 | 0 | 40 | 40 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 2 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
13 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 35%.
GANGA - A52%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 35% |
| Sanitary Fittings within the flats / premises | 35% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 35% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 35% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 35% |
COMMERCIAL WING82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 2 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 90% |
| Community Buildings | Yes | 90% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 10% |
| Open Parking | Yes | 50% |
Parking filed57
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| GANGA - A | 1 | 16 | 17 |
| COMMERCIAL WING | 0 | 40 | 40 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| GANGA - A | NA | Rs 5.63 cr | Rs 1.97 cr |
| COMMERCIAL WING | NA | Rs 5.63 cr | Rs 1.97 cr |
| - | NA | Rs 2.91 cr | Rs 2.62 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PARAG KOTWAL |
| Architect | EKVEERA ARCHITECTS |
| Engineer | EPICONS CONSULTANTS PVT LTD |
| Engineer | Kaushik C Thacker |
| Chartered Accountant | SKHD |
| Chartered Accountant | HR KHAN & ASSOCIATES |
| Partner | Role in project |
|---|---|
| MORAJ INFRATECH PRIVATE LIMITED | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAWAITING FOR OC
Reason as filed by the promoterWAITING FOR OCCUPANCY CERTIFICATE
Reason as filed by the promoterWe, MORAJ INFRATECH PRMTE LIMITED, the promoter of the proposed project "MORAJ WATERFALL GATEWAY RIVER BLOCK," hereby submit this declaration in compliance with the directions issued by the Hon'ble MahaRERAAuthority in Regulatory Case No. 338 of 2025. A copy of the said order dated 19/0912025 is attached herewith for reference. The original project completion date was 30103/2023. However, pursuant to the final order in the above-mentioned case, the project has been classified as lapsed, and we are required to file the necessary corrections in our application. Accordingly, for the purpose of fi
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Jul 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Jul 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Jul 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 12 Feb 2024
Documents filed96
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Order 338 of 2025.pdf | 2 Jan 2026 |
| Withdrawal Update Form 1File: Order 338 of 2025.pdf | 2 Jan 2026 |
| Withdrawal Update Form 1File: Order 338 of 2025.pdf | 2 Jan 2026 |
| Withdrawal Update Form 2File: Order 338 of 2025.pdf | 2 Jan 2026 |
| Withdrawal Update Form 2File: Order 338 of 2025.pdf | 2 Jan 2026 |
| Withdrawal Update Form 2File: Order 338 of 2025.pdf | 2 Jan 2026 |
| Withdrawal Update Form 3File: Order 338 of 2025.pdf | 2 Jan 2026 |
| Withdrawal Update Form 3File: Order 338 of 2025.pdf | 2 Jan 2026 |
| Withdrawal Update Form 3File: Order 338 of 2025.pdf | 2 Jan 2026 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 RERA Nagpur ph II Mar 23.pdf | 13 Jun 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 RERA Nagpur ph II Mar 24.pdf | 13 Jun 2025 |
| Certificates of CA (Form 3)File: FORM3.pdf | 15 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1 SEPT 24.pdf | 8 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1 DEC24.pdf | 8 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1 MAR 25.pdf | 8 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM1 SEPT 24.pdf | 8 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM1 DEC24.pdf | 8 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM1 MAR 25.pdf | 8 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2 Sep 24.pdf | 8 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2 DEC 24.pdf | 8 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2 MAR25.pdf | 8 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FOARM 2A 2022.pdf | 8 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FOARM 2A 2023.pdf | 8 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FOARM 2A 2024.pdf | 8 May 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC Ground Floor- Phase 2 (1).pdf | 12 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Moraj RERA SA Certificates 2019.pdf | 25 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RERA Form 5 Nagpur PH II.pdf | 25 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer commercial dec 22.pdf | 23 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer residencial dec 22 .pdf | 23 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2a.pdf | 23 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA Form 5 Nagpur PH II.pdf | 23 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3 dec 22 phase ii_compressed.pdf | 21 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certficate Moraj commercial.pdf | 12 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Moraj Residential.pdf | 12 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer commercial sept22.pdf | 12 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer residencial sept 22.pdf | 12 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 commercial Mar22.pdf | 17 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 Residencial Mar22.pdf | 17 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2 commercial Mar 22 .pdf | 17 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2 RESIDENTIAL Mar 22 .pdf | 17 May 2022 |
| Certificates of CA (Form 3)File: Form 3 March22.pdf | 17 May 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: MIPL Form 5 2021.pdf | 25 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer residential Mar 2021.pdf | 20 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Commercial Mar 2021.pdf | 20 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Residential Sept 2021.pdf | 20 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Commercial Sept 2021.pdf | 20 Oct 2021 |
| Certificates of CA (Form 3)File: CA certificate Mar 21.pdf | 18 Oct 2021 |
| Certificates of CA (Form 3)File: CA Certificate Sep 21.pdf | 18 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: March 2021 Commercial Rera Certificate.pdf | 14 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: September 2021 Commercial Rera Certificate.pdf | 14 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: March 2021 Residential Rera Certificate.pdf | 14 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: September 2021 Residential Rera Certificate.pdf | 14 Oct 2021 |
| Details of encumbrancesFile: ENCUM.pdf | 10 Mar 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5-River Block.pdf | 2 Dec 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1 certificate Resi.pdf | 23 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1 certificate Commercial.pdf | 23 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM1 certificate Commercial.pdf | 23 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form2 commercial_.pdf | 23 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form2 commercial_.pdf | 23 Nov 2020 |
| Certificates of CA (Form 3)File: FORM 3 March 20_.pdf | 23 Nov 2020 |
| Certificates of CA (Form 3)File: Form3 River Block Dec19.pdf | 20 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form1-commercial dec19.pdf | 18 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form1-residential dec19.pdf | 18 Jan 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form2- commercial dec19.pdf | 18 Jan 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form2- residential dec19.pdf | 18 Jan 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Rera Certificate Form No2A.pdf | 11 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate Commercial January 2019.pdf | 17 Oct 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: JULY 2019 ARCHITECT CERTIFICATE RESIDENTIAL.pdf | 17 Oct 2019 |
| Certificates of CA (Form 3)File: CA CERTIFICATE 2019 JULY_compressed.pdf | 17 Oct 2019 |
| Annual Audit Report of Statutory CA (Form 5)File: CA CERTIFICATE FORM 5 OCT 2019.pdf | 17 Oct 2019 |
| Certificates of CA (Form 3)File: CA certificate march 2019_compressed_compressed_compressed-compressed.pdf | 1 Jun 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE MARCH 2019 COMMERCIAL_compressed.pdf | 1 Apr 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE MARCH 2019 RESIDENTIAL_compressed (1).pdf | 1 Apr 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate Commercial January 2019.pdf | 9 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate Residential January 2019.pdf | 9 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER CERTIFICATES RESIDENTIAL A WING JANUARY 2019.pdf | 9 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER CERTIFICATES COMMERCIAL OCTOBER 2018.pdf | 9 Jan 2019 |
| Certificates of CA (Form 3)File: RERA - CA Certificate - Residential Final- Riverblock.pdf | 28 Nov 2018 |
| Certificates of CA (Form 3)File: RERA - CA Certificate -Riverblock Commercial Final.pdf | 28 Nov 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: COMMERCIAL CERTIFICATE NOV 2018.pdf | 21 Nov 2018 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Gayatri Niwas | plot -5 sector-42A nerul | 34 | Completed | Aug 2012 | Late, Sep 2012 |
| MORAJ CASA GRANDE | PLOT NO-57 SECTOR-17 KOPER KHAIRANE | 34 | Completed | Jan 2010 | Late, Jan 2010 |
| moraj casa beauna | Plot no-93 sector-17 koper khairane | 22 | Completed | Jan 2009 | Late, Feb 2009 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 96 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MORAJ WATERFALL GATEWAY RIVER BLOCK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MIHAN2,800+ in Nagpur
Filed coordinates, straight-line distance. 23 registered projects within 2 km.
Kanher Nagri Developers
KANHER NAGRI DEVELOPERS
MAHALAXMI NAGAR 6
MAHALAXMI ESTATE
MAHALAXMI NAGAR 4
PADMALAXMI DEVELOPERS
Moreshwar park 4
PRASANNA PLANNERS
PRIME PLATINUM
UMAKANT VITTHAL MENDHE
MAULI NAGAR 8
MAULI INFRATECH
See every Nagpur project, with the district possession charts
Builder: MORAJ INFRATECH PRIVATE LIMITED
MORAJ INFRATECH PRIVATE LIMITED has 3 registrations on MahaRERA, including MORAJ MAA SHRISHTI and MORAJ PRIDE. Its filings disclose 3 earlier MahaRERA projects: declares 0 of 3 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if MORAJ WATERFALL GATEWAY RIVER BLOCK is delayed beyond 30 Nov 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MORAJ WATERFALL GATEWAY RIVER BLOCK?
The registered promoter entity is MORAJ INFRATECH PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MORAJ WATERFALL GATEWAY RIVER BLOCK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MORAJ WATERFALL GATEWAY RIVER BLOCK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MORAJ WATERFALL GATEWAY RIVER BLOCK?
The professionals named in the filing: Architect: PARAG KOTWAL; Architect: EKVEERA ARCHITECTS; Engineer: EPICONS CONSULTANTS PVT LTD; Engineer: Kaushik C Thacker; Chartered Accountant: SKHD; Chartered Accountant: HR KHAN & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MORAJ WATERFALL GATEWAY RIVER BLOCK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback