ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / MORAJ MAA SMRITI

Completed No litigation declared Others project

MORAJ MAA SMRITI

By MORAJ BUILDING CONCEPTS PRIVATE LIMITED

RG-MH-11645 · RERA P52000005053 · Last updated on MahaRERA portal: 14 Oct 2021

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
57 of 121Construction stages doneacross 11 buildings; furthest along: Sanitary Fittings within the flats /..., 50%
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

MORAJ MAA SMRITI is a Others project by MORAJ BUILDING CONCEPTS PRIVATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000005053 on 9 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2021.

At a glance

Project

  • NameMORAJ MAA SMRITI
  • TypeOthers
  • Location
    • chinchavli
    • lowjee
    • Khopoli
    • Khalapur
    • Raigarh
    • 410203
  • Pincode410203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000005053
  • ReraGenie IDRG-MH-11645

Builder

  • NameMORAJ BUILDING CONCEPTS PRIVATE LIMITED
  • Entity typeCompany
  • ChairpersonMOHAN THAKURDAS GURNANI
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017PromisedDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Aug 2017
  • Promised completion30 Dec 2021
  • Revised completionNone
  • Buildings11 building records
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA70000
WING BNA70000
WING CNA70000
WING ENA90000
WING FNA90000
WING GNA90000
WING HNA90000
WING ANA20000
WING BNA20000
WING CNA20000
WING D PROPOSEDNA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building11

As on 14 Oct 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

57 of 121 construction stages are filed complete across 11 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 50%.

WING A73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B49%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C49%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING E91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING F91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING G91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING H91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING D PROPOSED0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Oct 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes100%
Street LightingYes50%
Community BuildingsYes50%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes50%

Parking filed113

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots113
Closed/Covered78
Open Space35
BuildingClosed/CoveredOpen SpaceTotal
WING A5510
WING B14519
WING C12517
WING E12517
WING F14519
WING G8513
WING H13518

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,513 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI14875.36
Proposed, not sanctioned8,675 sq m
Buildings approved11
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDEVGIRI BANKING COMPLEX,PHASE 2, SEC-19C, VASHI NAVI MUMBAI 400703

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectChaity engineers and architects
Engineercse consultants
PartnerRole in project
MORAJ BUILDING CONCEPTS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Feb 2021

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE.pdf14 Oct 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc.pdf16 Feb 2021
Certificates of CA (Form 3)File: Form3 Smriti Dec19.pdf20 Jan 2020
Certificates of Architect (Form 4)File: form4 smriti 5th flr.pdf14 Jan 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc smriti abc 5th floor.pdf13 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: REVISED CC SMRITI.pdf9 Jan 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2A - smriti.pdf7 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE JULY 2019.pdf18 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERIFICATE JULY 2019_compressed (1).pdf18 Oct 2019
Certificates of CA (Form 3)File: MBC CERTIFICATE JULY 2019_compressed (1).pdf18 Oct 2019
Certificates of CA (Form 5)File: CA CERTIFICATE FORM 5 OCT 2019.pdf7 Oct 2019
Certificates of CA (Form 3)File: MBC CA CERIFICATE MARCH 2019_compressed.pdf16 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE MARCH 2019.pdf3 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE MARCH 2019.pdf3 Apr 2019
Certificates of CA (Form 3)File: CA CERTIFICATE JANUARY 2019.pdf23 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE JANUARY 2019.pdf17 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MAA SMRITI ENGINEER CERTIFICATE JANUARY 2019.pdf17 Jan 2019
Certificates of CA (Form 3)File: RERA -Certificate- Maa Smriti - Nov 18.pdf28 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MAA SMRITI ENGINEER CERTIFICATE OCTOBER 2018-ilovepdf-compressed.pdf4 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: maa smriti ocober 2018 form 3.pdf31 Oct 2018
Certificates of CA (Form 5)File: MBC CA FORM 5 CERTIFICATE.pdf3 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE AUGUST 2018.pdf31 Aug 2018
Certificates of CA (Form 3)File: CA CERTIFICATE MAA SMRITI JULY 2018-ilovepdf-compressed.pdf23 Aug 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MORAJ BC - A WING AUGUST 2018.pdf7 Aug 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MORAJ BC - B WING AUGUST 2018.pdf7 Aug 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MORAJ BC - C WING AUGUST 2018.pdf7 Aug 2018
Certificates of CA (Form 3)File: CA CERTIFICATE MAA SMRITI.pdf31 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Moraj BC wing A.pdf28 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MORAJ WING B.pdf28 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MORAJ BC - C WING.pdf28 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate smriti.pdf27 Mar 2018
Declaration in FORM BFile: Form B mbc.pdf29 Jul 2017
Certificates of Architect (Form 4)File: MORAJ E WING form 4.pdf29 Jul 2017
Certificates of Architect (Form 4)File: MORAJ F (2).pdf29 Jul 2017
Certificates of Architect (Form 4)File: MORAJ G WING (2).pdf29 Jul 2017
Certificates of Architect (Form 4)File: MORAJ H WING (1).pdf29 Jul 2017
Building plan approvalFile: MBC PLAN LAYOUT.pdf28 Jul 2017
Layout approvalFile: MBC PLAN LAYOUT.pdf28 Jul 2017
Copy of the legal title reportFile: MBC TITLE REPORT.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: MBC PLAN LAYOUT.pdf28 Jul 2017
Building Plan Approval (IOD)File: MBC PLAN LAYOUT.pdf28 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: MBC CC.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MBC ENGINEER CERTIFICATE A.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MBC ENGINEER CERTIFICATE B.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MBC ENGINEER CERTIFICATE C.pdf28 Jul 2017
Certificates of CA (Form 3)File: MBC CA CERTIFICATE Wing A.pdf28 Jul 2017
Certificates of CA (Form 3)File: MBC CA CERTIFICATE Wing B.pdf28 Jul 2017
Certificates of CA (Form 3)File: MBC CA CERTIFICATE Wing C.pdf28 Jul 2017
Proforma of Allotment letterFile: MBC DRAFT AGREEMENT.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MBC ARCHITECT CERTIFICATE A.pdf24 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MBC ARCHITECT CERTIFICATE A.pdf24 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MBC ARCHITECT CERTIFICATE C.pdf24 Jul 2017
PAN CardFile: MBC PAN CARD.pdf19 Jul 2017
Details of encumbrancesFile: MBC ENCUMBRANCES DECLARATION.pdf19 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
moraj river side parkplot no448 449 2 448A takka panvel875CompletedMar 2015Mar 2015

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MORAJ MAA SMRITI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near lowjee5,900+ in Raigarh

2 kmMORAJ MAA SMRITICompleted 16Lapsed / revoked 3Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 45 registered projects within 2 km.

Builder: MORAJ BUILDING CONCEPTS PRIVATE LIMITED

MORAJ BUILDING CONCEPTS PRIVATE LIMITED has 1 registration on MahaRERA, including MORAJ MAA SMRITI. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if MORAJ MAA SMRITI is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MORAJ MAA SMRITI?

The registered promoter entity is MORAJ BUILDING CONCEPTS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MORAJ MAA SMRITI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MORAJ MAA SMRITI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MORAJ MAA SMRITI?

The professionals named in the filing: Architect: Chaity engineers and architects; Engineer: cse consultants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MORAJ MAA SMRITI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MORAJ MAA SMRITI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MORAJ MAA SMRITI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.