Home / Browse projects / Pune, Maharashtra / MONARCH REGAL AND MAJESTIC

Registered No litigation declared Others project

MONARCH REGAL AND MAJESTIC

By MONARCH BUILDERS AND DEVELOPERS

RG-MH-21195 · RERA P52100003332 · Last updated on MahaRERA portal: 25 Oct 2024

Source: official MahaRERA filing

Red flags

  • 11 complaints at MahaRERA
  • Completion date moved by 80 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 80 months from the original
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 95%
30 of 81Units unsoldnot recorded sold or booked
11Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

MONARCH REGAL AND MAJESTIC is a Others project by MONARCH BUILDERS AND DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100003332 on 5 Aug 2017. Possession is promised by 31 Dec 2028. The completion date has moved by 80 months from the original filing. 51 of the 81 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete. 11 complaints are on record with the regulator.

At a glance

Project

  • NameMONARCH REGAL AND MAJESTIC
  • TypeOthers
  • Location
    • TAMBE NIWAS RD
    • RAHATANI
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411017
  • Pincode411017
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100003332
  • ReraGenie IDRG-MH-21195

Builder

  • NameMONARCH BUILDERS AND DEVELOPERS
  • Entity typeCompany

Key dates

this monthRegisteredAug 2017First promiseApr 2022Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Aug 2017
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Apr 2022)
  • Buildings2 building records
  • Documents filed81 files

Current status

63%51 of 81 units booked
65.2%Work done, per cost certificate

Figures as on 25 Oct 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DERON RISENA50271542
DERON PROSPERNA7032739

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 95%.

DERON RISE9%
ActivityProgress
Excavation95%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
DERON PROSPER9%
ActivityProgress
Excavation95%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed59

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots59
Closed/Covered59
BuildingClosed/CoveredTotal
DERON RISE3030
DERON PROSPER2929

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,352 sq m
Land owned byThe promoter
Named landownersNone
Declared on4 Oct 2024

Approvals and building plan

Sanctioning authoritypcmc
Permissible FSI9323.56
Proposed, not sanctioned2,853 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch274 2 DONGRE PATIL BUNGALOW BANER PUNE 411045
Estimated costRs 21.48 cr
Cost incurredRs 14.01 cr
Work done65.22%
BuildingWingEstimatedIncurred
DERON PROSPERNARs 9.90 crRs 7.60 cr
DERON RISENARs 8.36 crRs 6.41 cr
-NARs 3.22 cr-

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerAMIT MOHITE
PartnerRole in project
MONARCH BUILDERS AND DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100011788Apr 2022 → Apr 2023

Reason as filed by the promoterThe Project involves construction of two towers of 11 stories each, as per potential sanctioned, presently received by the developer. The current sanction from PCMC is upto 5th Floor for Deron Rise building & upto 7th Floor for Deron Prosper building. The plan for sanction for upper floors has been submitted to PCMC for final approval, which is awaited. The prolong lockdowns caused by 1st & 2nd has delayed the construction considerably despite our vigorous efforts. Further the insolvency proceedings were started against DHFL, who had sanctioned the project loan & although they sanctioned us a

EXT52100019528Apr 2022 → Dec 2028

Reason as filed by the promoterorder given by the authority for change of promoter, hence Proposed Extended Date of Completion 31/12/2028

Complaints filed with MahaRERA11

Case no.ComplainantRespondentFiled
CC005000000095735SDA DEVELOPERS LLPDERON PROPERTIES PVT LTD01/07/2021
CC005000000106711Deron Future Owners Group Association (AOP)through its Authorized Signatory Mr. Deepak Gopal GoswamiDeron Properties Pvt. Ltd., having its Directors, Mr. Umang B. Madan and 1 another04/03/2022
CC005000000228330SUJIT TULSHIRAM RANMALEDeron Properties Pvt Ltd28/03/2023
CC005000000279914Ankur Dilip PatniDeron Properties Pvt Ltd21/12/2023
CC005000000269436M/S MERIT MERCHANTS PVT LTDM/S DERON PROPERTIES PVT LTD28/09/2023
CC005000000269437M/S MERIT MERCHANTS PVT LTDM/S DERON PROPERTIES PVT LTD28/09/2023
CC005000000269425M/S MERIT MERCHANTS PVT LTDM/S DERON PROPERTIES PVT LTD28/09/2023
CC005000000269453M/S RESURRGENT CONSTRUCTION PVT LTDM/S DERON PROPERTIES PVT LTD28/09/2023
CC005000000269454M/S RESURRGENT CONSTRUCTION PVT LTDM/S DERON PROPERTIES PVT LTD28/09/2023
CC005000000269455M/S RESURRGENT CONSTRUCTION PVT LTDM/S DERON PROPERTIES PVT LTD28/09/2023
CC005000000269430M/S MERIT MERCHANTS PVT LTDM/S DERON PROPERTIES PVT LTD28/09/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Jul 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jul 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
PAN CardFile: monarch PAN Card .pdf25 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 Final Architect certificate.pdf25 Oct 2024
Certificates of CA (Form 3)File: CA Certificate form 3 final COMPRESSED.pdf25 Oct 2024
Disclosure of sold/ booked inventoryFile: sold unsold inventory final.pdf25 Oct 2024
Declaration in FORM BFile: affidaviit.pdf23 Oct 2024
CERSAI detailsFile: cersai declaration.pdf23 Oct 2024
Declaration in FORM BFile: Form B.pdf22 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1.pdf22 Oct 2024
Certificates of CA (Form 3)File: form 3 CA certificate.pdf22 Oct 2024
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf22 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate .pdf22 Oct 2024
OtherFile: Declaration for scrutiny of extension .pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: sold unsold inventory.pdf22 Oct 2024
CERSAI detailsFile: CERSAI declaration.pdf22 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organizations.pdf22 Oct 2024
Self-declaration of Quarterly ProgressFile: annexure-c_0001.pdf4 Oct 2024
Other - TechnicalFile: DocScanner 26 Sept 2023 4-40 pm.pdf26 Sep 2023
OtherFile: Tambe Resgination.pdf4 Feb 2019
Certificates of CA (Form 5)File: Form 5 Deron Rise and Prosper.pdf29 Sep 2018
Layout approvalFile: Deron Rise Prosper Plot A Sanction 1 of 3.pdf11 Jul 2018
Layout approvalFile: Deron Rise Prosper Plot A Sanction 2 of 3.pdf11 Jul 2018
Layout approvalFile: Deron Rise Prosper Plot A Sanction 3 of 3.pdf11 Jul 2018
Layout approvalFile: Deron Rise Prosper Plot B Sanction 1 of 4.pdf11 Jul 2018
Layout approvalFile: Deron Rise Prosper Plot B Sanction 2 of 4.pdf11 Jul 2018
Layout approvalFile: Deron Rise Prosper Plot B Sanction 3 of 4.pdf11 Jul 2018
Layout approvalFile: Deron Rise Prosper Plot B Sanction 4 of 4.pdf11 Jul 2018
Copy of Layout Approval (in case of layout)File: Deron Rise Prosper Plot A Sanction 1 of 3.pdf11 Jul 2018
Copy of Layout Approval (in case of layout)File: Deron Rise Prosper Plot A Sanction 2 of 3.pdf11 Jul 2018
Copy of Layout Approval (in case of layout)File: Deron Rise Prosper Plot A Sanction 3 of 3.pdf11 Jul 2018
Copy of Layout Approval (in case of layout)File: Deron Rise Prosper Plot B Sanction 1 of 4.pdf11 Jul 2018
Copy of Layout Approval (in case of layout)File: Deron Rise Prosper Plot B Sanction 2 of 4.pdf11 Jul 2018
Copy of Layout Approval (in case of layout)File: Deron Rise Prosper Plot B Sanction 3 of 4.pdf11 Jul 2018
Copy of Layout Approval (in case of layout)File: Deron Rise Prosper Plot B Sanction 4 of 4.pdf11 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: Plot A CC.pdf11 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: Plot B CC.pdf11 Jul 2018
Layout approvalFile: MYSCAN_20171108_0007.pdf11 Nov 2017
Layout approvalFile: MYSCAN_20171108_0006.pdf11 Nov 2017
Layout approvalFile: MYSCAN_20171108_0008.pdf11 Nov 2017
Layout approvalFile: MYSCAN_20171108_0009.pdf11 Nov 2017
Layout approvalFile: MYSCAN_20171108_0010.pdf11 Nov 2017
Layout approvalFile: MYSCAN_20171108_0011.pdf11 Nov 2017
Layout approvalFile: MYSCAN_20171108_0012.pdf11 Nov 2017
Layout approvalFile: MYSCAN_20171108_0013.pdf11 Nov 2017
Layout approvalFile: MYSCAN_20171108_0014.pdf11 Nov 2017
Layout approvalFile: MYSCAN_20171108_0015.pdf11 Nov 2017
Copy of Layout Approval (in case of layout)File: MYSCAN_20171108_0007.pdf11 Nov 2017
Copy of Layout Approval (in case of layout)File: MYSCAN_20171108_0006.pdf11 Nov 2017
Copy of Layout Approval (in case of layout)File: MYSCAN_20171108_0008.pdf11 Nov 2017
Copy of Layout Approval (in case of layout)File: MYSCAN_20171108_0009.pdf11 Nov 2017
Copy of Layout Approval (in case of layout)File: MYSCAN_20171108_0010.pdf11 Nov 2017
Copy of Layout Approval (in case of layout)File: MYSCAN_20171108_0011.pdf11 Nov 2017
Copy of Layout Approval (in case of layout)File: MYSCAN_20171108_0012.pdf11 Nov 2017
Copy of Layout Approval (in case of layout)File: MYSCAN_20171108_0013.pdf11 Nov 2017
Copy of Layout Approval (in case of layout)File: MYSCAN_20171108_0014.pdf11 Nov 2017
Copy of Layout Approval (in case of layout)File: MYSCAN_20171108_0015.pdf11 Nov 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Rise.pdf11 Nov 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Prosper.pdf11 Nov 2017
Building plan approvalFile: Deron Prosper Sanction Plan Plot B Part 2.pdf31 Jul 2017
PAN CardFile: Deron__PAN_New.pdf31 Jul 2017
Building Plan Approval (IOD)File: Deron Prosper Sanction Plan Plot B Part 2.pdf31 Jul 2017
Certificates of CA (Form 3)File: Rise_n_Prosper_Form_3.pdf31 Jul 2017
Proforma of Allotment letterFile: Deron Rise Prosper Draft Agr.pdf31 Jul 2017
Proforma of Allotment letterFile: Allotment Letter.pdf31 Jul 2017
OtherFile: Notes_for_Form_A_-RERA.PDF31 Jul 2017
Layout approvalFile: Deron Rise Sanction Plan Plot A Part 1.pdf30 Jul 2017
Layout approvalFile: Deron Rise Sanction Plan Plot A Part 2.pdf30 Jul 2017
Layout approvalFile: Deron Prosper Sanction Plan Plot B Part 1.pdf30 Jul 2017
Layout approvalFile: Deron Prosper Sanction Plan Plot B Part 2.pdf30 Jul 2017
Copy of the legal title reportFile: RISE TITLE SEARCH.pdf30 Jul 2017
Copy of the legal title reportFile: Deron Rise Prosper Plot B Title Search.pdf30 Jul 2017
Details of encumbrancesFile: DHFL__Rise__Prosper_29-07-2017_Sanction.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: Deron Rise Sanction Plan Plot A Part 1.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: Deron Rise Sanction Plan Plot A Part 2.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: Deron Prosper Sanction Plan Plot B Part 1.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: Deron Prosper Sanction Plan Plot B Part 2.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Deron Rise Prosper C C Plot A.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Deron Rise Prosper C C Plot B.pdf30 Jul 2017
Declaration in FORM BFile: Deron Rise Prosper Form B.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Deron Rise Architect Certificate Form 4.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Deron Prosper Architect Certificate Form 4.pdf30 Jul 2017

How this compares with Pune

63%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 80 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MONARCH REGAL AND MAJESTIC on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAHATANI13,700+ in Pune

2 kmMONARCH REGAL AND MAJESTCompleted 82Lapsed / revoked 48Other 149Dot size: filed unitsN

Filed coordinates, straight-line distance. 279 registered projects within 2 km.

Builder: MONARCH BUILDERS AND DEVELOPERS

MONARCH BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including MONARCH REGAL AND MAJESTIC. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MONARCH REGAL AND MAJESTIC is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MONARCH REGAL AND MAJESTIC?

The registered promoter entity is MONARCH BUILDERS AND DEVELOPERS, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MONARCH REGAL AND MAJESTIC?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MONARCH REGAL AND MAJESTIC?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MONARCH REGAL AND MAJESTIC?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MONARCH REGAL AND MAJESTIC?

The professionals named in the filing: Engineer: AMIT MOHITE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MONARCH REGAL AND MAJESTIC?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MONARCH REGAL AND MAJESTIC. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MONARCH REGAL AND MAJESTIC to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.