Home / Browse projects / Mumbai Suburban, Maharashtra / Modispaces Volga

Completed No litigation declared Residential / Group Housing project

Modispaces Volga

By Modispaces Real Estate Pvt Ltd

RG-MH-29166 · RERA P51800028532 · Last updated on MahaRERA portal: 7 Dec 2024

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • 1 extension taken

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2024Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
1Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

Modispaces Volga is a Residential / Group Housing project by Modispaces Real Estate Pvt Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800028532 on 10 Mar 2021. The registration is recorded completed; possession was promised by 30 Jun 2024. 1 complaint is on record with the regulator.

At a glance

Project

  • NameModispaces Volga
  • TypeResidential / Group Housing
  • Location
    • TPS Borivali III
    • Shimpoli Boriwali W
    • Rayani Gram Layout
    • Borivali
    • Mumbai Suburban
    • 400092
  • Pincode400092
  • RERA no.P51800028532
  • ReraGenie IDRG-MH-29166

Builder

  • NameModispaces Real Estate Pvt Ltd
  • Entity typeCompany
  • CINU45200MH2006PTC159318
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • ChairpersonGhanshyam Sagarmal Modi
  • DirectorsKeshav Sunilkumar Modi, Anand Premkumar Modi, Vinit Shyamsunder Modi
  • Other registrations8 more →
  • Completed7 of 9
  • Declared earlier projects8 →

Key dates

this monthRegisteredMar 2021PromisedJun 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 Mar 2021
  • Promised completion30 Jun 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed81 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Modispaces VolgaNA250000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Modispaces Volga: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes10%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered22
Open Space8

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,379 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
OM SUNDAR VICHAR CHSLBorivaliMumbai Suburban

Approvals and building plan

Permissible FSI10032.28
Proposed, not sanctioned10,032 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAMAR MAHAL GROUND FLOOR JUHU ROAD NO 1 ANANDRAO DEVELE MARG NEAR CHANDAN TALKIES JUHU VILLAGE MUMBAI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectChogle & Associates
EngineerSura & Associates
Chartered AccountantSwaroop Jain & Co
PartnerRole in project
Modispaces Real Estate Pvt Ltd-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800019798Jun 2024 → Dec 2024

Reason as filed by the promoterDue to shortage of material and labor not able to complete the project please grant us extension till 31/12/2024

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12600552siddhesh desaiModispaces Real Estate Pvt Ltd01/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jan 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Nov 2024

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form - 2A - Site Supervisor - 2023-24-1 (1).pdf7 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 (1).pdf11 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2432537_OC_signed (3).pdf11 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A DOI.pdf25 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Old Bank details.pdf25 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MODISPACES VOLGA RERA CERTIFICATE JAN 2024 TO MARCH 2024 (2).pdf22 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 Volga march 2024 - 13-05-2024.pdf22 May 2024
Disclosure of sold/ booked inventoryFile: New Disclousure of Inventory_31-03-24 (15-05-24).pdf22 May 2024
Declaration in FORM BFile: New Form B (Extension)_Volga.pdf18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Form 3_Volga_Mar 2024_signed.pdf17 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 JUNE 23.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 SEP 23.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 DEC 23.pdf25 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 21-22.pdf23 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23.pdf23 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: March 2023 Volga Form1.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: June 2023 Volga Form1.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sept 2023Volga Form1.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 2023 Volga Form1.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 Volga format dt 30-06-2023 - Signed.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 Volga format dt 30-09-2023 - Signed.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 Volga format dt 31-12-2023.pdf29 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf29 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf29 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory_31-03-23.pdf13 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory_30-06-23.pdf13 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory_30-09-23.pdf13 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory_31-12-23.pdf13 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: March 2023 Volga Form1.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: June 2023 Volga Form1.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sept 2023Volga Form1.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 2023 Volga Form1.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 _Volga.pdf3 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Volga.pdf3 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: Final CC 17-05-22 Volga.pdf16 Sep 2022
Building plan approvalFile: IOD.pdf17 May 2022
Layout approvalFile: plans 1.pdf17 May 2022
Layout approvalFile: plans 2.pdf17 May 2022
Layout approvalFile: plans 3 and 4.pdf17 May 2022
Layout approvalFile: plans 5 and 6.pdf17 May 2022
Layout approvalFile: plans 7.pdf17 May 2022
Layout approvalFile: plans 8 and 9.pdf17 May 2022
Copy of Layout Approval (in case of layout)File: plans 1.pdf17 May 2022
Copy of Layout Approval (in case of layout)File: plans 2.pdf17 May 2022
Copy of Layout Approval (in case of layout)File: plans 3 and 4.pdf17 May 2022
Copy of Layout Approval (in case of layout)File: plans 5 and 6.pdf17 May 2022
Copy of Layout Approval (in case of layout)File: plans 7.pdf17 May 2022
Copy of Layout Approval (in case of layout)File: plans 8 and 9.pdf17 May 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf17 May 2022
Declaration about Commencement CertificateFile: CC Declaration (04-05-22)_Volga.pdf4 May 2022
CERSAI detailsFile: CERSAI__Report.pdf4 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_Volga.pdf14 Apr 2022
CERSAI detailsFile: CERSAI DECLARATION_Volga.pdf14 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 fy 20-21 Volga.pdf14 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: FurtherCC_Modispaces Volga.pdf17 Aug 2021
Disclosure of sold/ booked inventoryFile: Booked Inventory (06-08-21).pdf10 Aug 2021
Building plan approvalFile: Full IOD _Modispaces Volga (22-07-21).pdf27 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: Full IOD _Modispaces Volga (22-07-21).pdf27 Jul 2021
Disclosure of sold/ booked inventoryFile: Booked Inventory.pdf8 Jun 2021
Building plan approvalFile: Amendent Iod Plan.pdf31 May 2021
Building Plan Approval / NA Order for plotted developmentFile: Amendent Iod Plan.pdf31 May 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf24 May 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM NO 03 VOLGA CERTIFIED_compressed.pdf27 Feb 2021
Proforma of Allotment letterFile: Allotment Letter.pdf27 Feb 2021
Proforma of Allotment letterFile: RERA Sale Agr.pdf27 Feb 2021
Building plan approvalFile: Iod Plan.pdf26 Feb 2021
Building Plan Approval / NA Order for plotted developmentFile: Iod Plan.pdf26 Feb 2021
Commencement Certificates / NA Order for plotted developmentFile: 1st CC.pdf26 Feb 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: amalgamation Intimation ltr fm Registrar to Om Sadvichar(b)(7-3-19)_Om sunadarvichar.pdf25 Feb 2021
Building plan approvalFile: IOD.pdf4 Feb 2021
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf4 Feb 2021
Layout approvalFile: Rayani Gram Layout.pdf1 Feb 2021
Details of encumbrancesFile: Encumbarance certificate for RERA uploading.pdf1 Feb 2021
Copy of Layout Approval (in case of layout)File: Rayani Gram Layout.pdf1 Feb 2021
Declaration in FORM BFile: RE SCAN OF FORM B _Om Sundar Vichar.pdf1 Feb 2021
Copy of the legal title reportFile: Title Certificate Bmc (22-2-20)_Om Sundar Vichar .pdf30 Jan 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT RERA FORM (1).pdf30 Jan 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society registration certificate.pdf30 Jan 2021
Status of ConveyanceFile: Index2 conveyance-Sadvichar.pdf30 Jan 2021
Status of ConveyanceFile: Index2 conveyance-Sundaram.pdf30 Jan 2021

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

7 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Modispaces AmazonShimpoli Road Borivali W Mumbai32CompletedDec 2019Nov 2018
Modispaces TashkentSVP Road Borivali W Mumbai79CompletedDec 2018Late, Jan 2019
Modispaces DoyleLourdes Colony Orlem Malad W Mumbai 40006420CompletedDec 2018Apr 2018
Modispaces OysterSai Baba Park Evershine Nagar Off Link Road Malad W Mumbai 40006416CompletedDec 2017Oct 2017
Modispaces IndusKastur Park Off Shimpoli Road Borivali W Mumbai27CompletedOct 2017Feb 2017
Modispaces MontrealSai Baba Park Evershine Nagar Off Link Road Malad W Mumbai 40006444CompletedJul 2016Sep 2015
Modispaces Pearly ShellJunction of Shankar Lane Kandivali W and Tank Lane Orlem Malad W Mumbai38CompletedJun 2016Apr 2016
Modispaces AnkurSai Baba Park Evershine Nagar Off Link Road Malad W Mumbai 40006436CompletedJul 2015Dec 2014

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Modispaces Volga on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Rayani Gram Layout6,700+ in Mumbai Suburban

Builder: Modispaces Real Estate Pvt Ltd

Modispaces Real Estate Pvt Ltd has 9 registrations on MahaRERA, including Modispaces Oyster and Modispaces Doyle. Its filings disclose 8 earlier MahaRERA projects: declares 7 of 8 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Modispaces Volga is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Modispaces Volga?

The registered promoter entity is Modispaces Real Estate Pvt Ltd, a company as per the filing. Its CIN U45200MH2006PTC159318 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Modispaces Volga?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Modispaces Volga?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Modispaces Volga?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Modispaces Volga?

The professionals named in the filing: Architect: Chogle & Associates; Engineer: Sura & Associates; Chartered Accountant: Swaroop Jain & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Modispaces Volga?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Modispaces Volga. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Modispaces Volga to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.