Home / Browse projects / MITTAL ELEGANT
MITTAL ELEGANT
RG-MH-71246 · RERA P51900012877 · Last updated on MahaRERA portal: 12 Aug 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 96 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MITTAL ELEGANT is a Residential / Group Housing project by M M IDEAL INFRA in Mumbai, 400009, registered with MahaRERA as P51900012877 on 7 Sep 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 96 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameMITTAL ELEGANT
- TypeResidential / Group Housing
- Location
- Mumbai
- 400009
- Pincode400009
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900012877
- ReraGenie IDRG-MH-71246
Builder
- NameM M IDEAL INFRA
- Entity typePartnership
- PartnersAINUL HAQUE ISLAM SHAIKH, OMPRAKASH MALIRAM MITTAL
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on7 Sep 2017
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2019)
- Buildings1 building record
- Documents filed79 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MITTAL ELEGANT | NA | 27 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Aug 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.
MITTAL ELEGANT: 75% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
Progress on shared amenities15
As on 12 Aug 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 30% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed5
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PRASHANT SUKHATANKAR |
| Architect | TANGENTS DESIGN CELL |
| Engineer | Hiten R. Mahimtura |
| Engineer | Mahimtura Consultants Pvt Ltd |
| Chartered Accountant | M.H. BADERPURA & CO. |
| Chartered Accountant | NENAWATI & ASSOCIATES |
| Partner | Role in project |
|---|---|
| M M IDEAL INFRA | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to COVID the construction got delayed and also due to delay in getting the CC.
Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, financial constraints, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. Given the circumstances, we kindly request an extension until 31/12/2027 to complete the project and fulfil all regulatory requirements. Sir, there are a few internal issues which we are resolving. Apart from that, after the completion of the project, the application
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000375083 | TASNEEM YACOOB KAPASI | M.M.IDEAL INFRA | 03/04/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Sep 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Sep 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Oct 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed79
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Jun 24.pdf | 12 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 12 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf | 12 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf | 12 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf | 12 Aug 2024 |
| Declaration about Commencement CertificateFile: Format D.pdf | 3 Aug 2024 |
| Declaration in FORM BFile: Form B.pdf | 3 Aug 2024 |
| CERSAI detailsFile: Declaration of CERSAI.pdf | 3 Aug 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (2).pdf | 3 Aug 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf | 3 Aug 2024 |
| Certificates of CA (Form 3)File: Form 3 as on March 2018.pdf | 30 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3 as on March 2019.pdf | 30 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3 as on March 2020.pdf | 30 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3 as on March 2021.pdf | 30 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3 as on December 2021.pdf | 30 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3 as on March 2022.pdf | 30 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3 as on June 2022.pdf | 30 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3 as on September 2022.pdf | 30 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3 as on December 2022.pdf | 30 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 01_04_2018.pdf | 18 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 01_04_2019.pdf | 18 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 01_04_2019.pdf | 18 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 01_04_2020.pdf | 18 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 01_04_2021.pdf | 18 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 01_04_2022.pdf | 18 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 01_04_2022.pdf | 18 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 01_07_2022.pdf | 18 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 01_10_2022.pdf | 18 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31-3-2018_compressed.pdf | 18 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31-3-2019_compressed.pdf | 18 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31-3-2020_compressed.pdf | 18 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31-3-2021_compressed.pdf | 18 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31-12-2021_compressed.pdf | 18 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31-3-2022_compressed.pdf | 18 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30-6-2022_compressed.pdf | 18 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30-9-2022_compressed.pdf | 18 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31-12-2022_compressed.pdf | 18 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018-19.pdf | 18 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019-20.pdf | 18 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-21.pdf | 18 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf | 18 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20 (1).pdf | 17 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21 (1).pdf | 17 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf | 17 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold or booked - RERA.pdf | 12 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Application for Extention of Project - Format -B.pdf | 12 Jan 2023 |
| Declaration about Commencement CertificateFile: Declaraion about Commencement Certificate.pdf | 5 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate -Kaudinya - 31-03-20.pdf | 5 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate -Kaudinya - 31-03-21.pdf | 5 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer Certificate -Kaudinya - 31-03-22.pdf | 5 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Balancesheet - 2019-20.pdf | 5 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer Certificate -Mahimtura pdf.pdf | 3 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Balancesheet - 2019-20.pdf | 3 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Balancesheet - 2020-21.pdf | 3 Jan 2023 |
| Proforma of Agreement for saleFile: Agreement for Sale - RERA Final -Draft pdf.pdf | 3 Jan 2023 |
| Certificates of CA (Form 5)File: Form5 CA Certificate.pdf | 11 Jan 2019 |
| Building plan approvalFile: 17TH TO 21.pdf | 24 Oct 2018 |
| Building Plan Approval (IOD)File: 17TH TO 21.pdf | 24 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Amended letter .pdf | 24 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Amended letter .pdf | 24 Oct 2018 |
| Layout approvalFile: NOT APPLICABLE.pdf | 5 Sep 2017 |
| Copy of the legal title reportFile: TITEL REPORT.pdf | 5 Sep 2017 |
| Copy of Layout Approval (in case of layout)File: NOT APPLICABLE.pdf | 5 Sep 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5659 - Certificate.pdf | 1 Sep 2017 |
| Declaration in FORM BFile: PERFORMA B.pdf | 31 Aug 2017 |
| Details of encumbrancesFile: DOC280817-28082017171112.pdf | 28 Aug 2017 |
| Certificates of CA (Form 3)File: mmidealinfr.pdf | 28 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T 1.pdf | 21 Aug 2017 |
| Building plan approvalFile: MYSCAN_20170218_0002.pdf | 11 Aug 2017 |
| Building plan approvalFile: MYSCAN_20170218_0001.pdf | 11 Aug 2017 |
| Building plan approvalFile: MYSCAN_20170218_0003.pdf | 11 Aug 2017 |
| Building plan approvalFile: MYSCAN_20170218_0004.pdf | 11 Aug 2017 |
| PAN CardFile: Pan Card MMIDEAL INFRA (1).pdf | 11 Aug 2017 |
| Building Plan Approval (IOD)File: MYSCAN_20170218_0002.pdf | 11 Aug 2017 |
| Building Plan Approval (IOD)File: MYSCAN_20170218_0001.pdf | 11 Aug 2017 |
| Building Plan Approval (IOD)File: MYSCAN_20170218_0003.pdf | 11 Aug 2017 |
| Building Plan Approval (IOD)File: MYSCAN_20170218_0004.pdf | 11 Aug 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: m m ideal C C- New.pdf | 11 Aug 2017 |
| Proforma of Allotment letterFile: DRAFT AGREEMENT FOR SALE.pdf | 11 Aug 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 79 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep MITTAL ELEGANT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mumbai
Filed coordinates, straight-line distance. 12 registered projects within 2 km.
AL AMIR APARTMENT
JANZEB AMIRKAMAL KHAN
AL MEHDI HEIGHTS
AL HAADI DEVELOPERS
Sauda Heights - Phase II
MK India Enterprises
21, Baugh-E-Hasnain
Amex Developers Private Limited
Aqdas Residency
M/s. Alamdar Kapde Developer
HASAN ALI
Citymaker Builders Private Limited
Builder: M M IDEAL INFRA
M M IDEAL INFRA has 1 registration on MahaRERA, including MITTAL ELEGANT. Its filings disclose no earlier MahaRERA projects. Read the full track record.
Frequently asked questions
What are my rights if MITTAL ELEGANT is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MITTAL ELEGANT?
The registered promoter entity is M M IDEAL INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MITTAL ELEGANT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MITTAL ELEGANT?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MITTAL ELEGANT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MITTAL ELEGANT?
The professionals named in the filing: Architect: PRASHANT SUKHATANKAR; Architect: TANGENTS DESIGN CELL; Engineer: Hiten R. Mahimtura; Engineer: Mahimtura Consultants Pvt Ltd; Chartered Accountant: M.H. BADERPURA & CO.; Chartered Accountant: NENAWATI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MITTAL ELEGANT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback