Home / Browse projects / Sangli, Maharashtra / MIRJE DERAM CITY

Registered No litigation declared Residential / Group Housing project

MIRJE DERAM CITY

By MIRJE AND ASSOCIATES

RG-MH-85574 · RERA P53100049354 · Last updated on MahaRERA portal: 7 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 36 months from the original
24 of 66Construction stages doneacross 6 buildings; furthest along: Internal walls, 90%
2 of 6Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

MIRJE DERAM CITY is a Residential / Group Housing project by MIRJE AND ASSOCIATES in Sangli, Maharashtra, registered with MahaRERA as P53100049354 on 7 Feb 2023. Possession is promised by 30 Jun 2027. The completion date has moved by 36 months from the original filing. 4 of the 6 units on this registration are recorded sold or booked, and 24 of 66 construction stages are filed complete.

At a glance

Project

  • NameMIRJE DERAM CITY
  • TypeResidential / Group Housing
  • Location
    • WANLESSWADI
    • -
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • Sangli
    • 416414
  • Pincode416414
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53100049354
  • ReraGenie IDRG-MH-85574

Builder

  • NameMIRJE AND ASSOCIATES
  • Entity typePartnership
  • PartnerMANGAL PRAKASH MIRJE

Key dates

this monthRegisteredFeb 2023First promiseJun 2024Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Feb 2023
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Jun 2024)
  • Buildings6 building records
  • Documents filed90 files

Current status

67%4 of 6 units booked
97.7%Work done, per cost certificate

Figures as on 7 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MIRJE DREAM CITY UNIT 1NA22101
MIRJE DERAM CITY UNIT 2NA22101
MIRJE DERAM CITY UNIT 3NA22101
MIRJE DERAM CITY UNIT 4NA22101
MIRJE DERAM CITY UNIT 5NA22101
MIRJE DERAM CITY UNIT 6NA22101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 7 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Internal walls, at 90%.

MIRJE DREAM CITY UNIT 173%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
MIRJE DERAM CITY UNIT 274%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
MIRJE DERAM CITY UNIT 372%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
MIRJE DERAM CITY UNIT 473%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
MIRJE DERAM CITY UNIT 573%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
MIRJE DERAM CITY UNIT 673%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 7 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Open Space6
BuildingOpen SpaceTotal
MIRJE DREAM CITY UNIT 111
MIRJE DERAM CITY UNIT 211
MIRJE DERAM CITY UNIT 311
MIRJE DERAM CITY UNIT 411
MIRJE DERAM CITY UNIT 511
MIRJE DERAM CITY UNIT 611

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,420 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Aug 2025

Approvals and building plan

Sanctioning authoritySANGLI MIRAJ AND KUPWAD MUNICIPAL CORPORATION
Permissible FSI6194.14
Proposed, not sanctioned615 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchR S NO 356 A PLOT NO 40 VISHRAMBAG JAYHIND COLONY SANGLI 416415
Estimated costRs 1.31 cr
Cost incurredRs 1.28 cr
Work done97.74%
BuildingWingEstimatedIncurred
MIRJE DERAM CITY UNIT 2NARs 29.18 lakhRs 28.59 lakh
MIRJE DREAM CITY UNIT 1NARs 22.71 lakhRs 22.18 lakh
MIRJE DERAM CITY UNIT 5NARs 22.47 lakhRs 22.18 lakh
MIRJE DERAM CITY UNIT 6NARs 22.45 lakhRs 20.92 lakh
MIRJE DERAM CITY UNIT 3NARs 17.14 lakhRs 17.14 lakh
MIRJE DERAM CITY UNIT 4NARs 17.14 lakhRs 17.14 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSACHIN G KANOJE
EngineerSANDEEP MAHADIK
EngineerSUBHAM S HAJARE
Chartered AccountantRAJESH C BHATE
Chartered AccountantPRACHI JAIN
Chartered AccountantKEDAR APPAASO SABANE
PartnerRole in project
MIRJE AND ASSOCIATES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT53100027549Jun 2024 → Jun 2027

Reason as filed by the promoterWe applied for building completion for Sangli Miraj and Kupwad Municipal Council Sangli, But still we can not received Completion Certificate still date, also as on now there is no booking and due to increase in material rates the work has become slow so we apply for extension of date for this project

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1 30-09-2025.pdf7 Jul 2026
Withdrawal Update Form 1File: FORM-1 30-09-2025.pdf7 Jul 2026
Withdrawal Update Form 1File: FORM-1 31-12-2025.pdf7 Jul 2026
Withdrawal Update Form 1File: FORM-1 31-03-2026.pdf7 Jul 2026
Withdrawal Update Form 2File: FORM-2 30-09-2025.pdf7 Jul 2026
Withdrawal Update Form 2File: FORM-2 30-09-2025.pdf7 Jul 2026
Withdrawal Update Form 2File: FORM-2 31-12-2025.pdf7 Jul 2026
Withdrawal Update Form 2File: FORM-2 31-03-2026.pdf7 Jul 2026
Withdrawal Update Form 3File: FORM-3 30-09-2025.pdf7 Jul 2026
Withdrawal Update Form 3File: FORM-3 30-09-2025.pdf7 Jul 2026
Withdrawal Update Form 3File: FORM-3 31-12-2025.pdf7 Jul 2026
Withdrawal Update Form 3File: FORM-3 31-03-2026.pdf7 Jul 2026
Form 1File: FROM 1.pdf21 Aug 2025
Form 2File: FROM 2.pdf21 Aug 2025
Form 3File: FORM-3 (2).pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold.pdf21 Aug 2025
Withdrawal Update Form 1File: FROM 1.pdf21 Aug 2025
Withdrawal Update Form 1File: from 1 NEW.pdf21 Aug 2025
Withdrawal Update Form 1File: from 1 NEW.pdf21 Aug 2025
Withdrawal Update Form 2File: FROM 2.pdf21 Aug 2025
Withdrawal Update Form 2File: FROM 2.pdf21 Aug 2025
Withdrawal Update Form 2File: FROM 2.pdf21 Aug 2025
Withdrawal Update Form 3File: FORM-3 (2).pdf21 Aug 2025
Withdrawal Update Form 3File: FORM-3.pdf21 Aug 2025
Withdrawal Update Form 3File: FORM-3.pdf21 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: from 1_compressed (1).pdf6 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf6 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2_compressed.pdf6 Mar 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format a bank.pdf6 Mar 2025
Other - TechnicalFile: bar chart pdf.pdf6 Mar 2025
Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION.pdf15 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 QTR 1.pdf15 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: from 1 qtr2.pdf15 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: from 1 qtr3.pdf15 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: from 1 qtr4.pdf15 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 qtr 2.pdf15 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 qtr 3.pdf15 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 qtr 4.pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 QTR 1.pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 qtr 4.pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 qtr3.pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 qtr 2.pdf15 Feb 2025
Disclosure of sold/ booked inventoryFile: qtr 1 sold.pdf15 Feb 2025
Disclosure of sold/ booked inventoryFile: qtr 2 slod.pdf15 Feb 2025
Disclosure of sold/ booked inventoryFile: qte 3 sold.pdf15 Feb 2025
Disclosure of sold/ booked inventoryFile: qtr 4 sold.pdf15 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2a.pdf15 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf13 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: C A CERTIFICATE.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1.pdf29 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1.pdf29 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1.pdf29 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1.pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2.pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2.pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2.pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2.pdf29 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: from 2a.pdf29 Apr 2024
Disclosure of sold/ booked inventoryFile: SOLD.pdf29 Apr 2024
Disclosure of sold/ booked inventoryFile: SOLD.pdf29 Apr 2024
Disclosure of sold/ booked inventoryFile: SOLD.pdf29 Apr 2024
Disclosure of sold/ booked inventoryFile: SOLD.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3 Q3.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3 Q4.pdf29 Apr 2024
Details of encumbrances concerned to FinanceFile: ENC - FIN.pdf4 Jan 2023
Details of encumbrances concerned to LegalFile: ENC - FIN.pdf4 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: order no 39.pdf4 Jan 2023
Other - FinanceFile: ENC - FIN.pdf4 Jan 2023
Building plan approvalFile: dwg.pdf23 Nov 2022
Layout approvalFile: LAYOUT.pdf23 Nov 2022
PAN CardFile: PAN CARD1.pdf23 Nov 2022
Copy of the legal title reportFile: search report.pdf23 Nov 2022
Details of encumbrances concerned to FinanceFile: encumbrance certificate - financial.pdf23 Nov 2022
Details of encumbrances concerned to LegalFile: encumbrance certificate - financial.pdf23 Nov 2022
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf23 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: dwg.pdf23 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: Certificate of Commencement.pdf23 Nov 2022
Declaration about Commencement CertificateFile: dcc.pdf23 Nov 2022

How this compares with Sangli

67%of this project is bookeddistrict median 16%
11%of Sangli projects moved their completion datethis one moved by 36 months
29%of Sangli registrations have lapsed or been cancelledthis one is on the register

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep MIRJE DERAM CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near -790+ in Sangli

2 kmMIRJE DERAM CITYCompleted 49Lapsed / revoked 15Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 84 registered projects within 2 km.

Builder: MIRJE AND ASSOCIATES

MIRJE AND ASSOCIATES has 1 registration on MahaRERA, including MIRJE DERAM CITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if MIRJE DERAM CITY is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MIRJE DERAM CITY?

The registered promoter entity is MIRJE AND ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MIRJE DERAM CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MIRJE DERAM CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MIRJE DERAM CITY?

The professionals named in the filing: Architect: SACHIN G KANOJE; Engineer: SANDEEP MAHADIK; Engineer: SUBHAM S HAJARE; Chartered Accountant: RAJESH C BHATE; Chartered Accountant: PRACHI JAIN; Chartered Accountant: KEDAR APPAASO SABANE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MIRJE DERAM CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MIRJE DERAM CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MIRJE DERAM CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.