Home / Browse projects / Sangli, Maharashtra / PLATINUM PLAZA

Registered No litigation declared Others project

PLATINUM PLAZA

By ASHOK BABGONDA PATIL

RG-MH-46572 · RERA P53100054213 · Last updated on MahaRERA portal: 31 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken
  • Rs 2.00 crore secured on the land, in favour of Viracharya Nagri Sahakari Patsantha Maryadit sangli
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Feb 2029Possession promisedmoved 4 months from the original
2 of 11Construction stages donefurthest along: Staircases, 95%
28 of 41Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

PLATINUM PLAZA is a Others project by ASHOK BABGONDA PATIL in Sangli, Maharashtra, registered with MahaRERA as P53100054213 on 3 Jan 2024. Possession is promised by 24 Feb 2029. The completion date has moved by 4 months from the original filing. 13 of the 41 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NamePLATINUM PLAZA
  • TypeOthers
  • Location
    • S NO 30/2/C
    • PLOT NO 3
    • VIJAYNAGAR
    • SANGLI
    • NEAR PRIME LPG PUMP
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • Sangli
    • 416414
  • Pincode416414
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53100054213
  • ReraGenie IDRG-MH-46572

Builder

  • NameASHOK BABGONDA PATIL
  • Entity typeIndividual

Key dates

this monthRegisteredJan 2024First promiseOct 2028Revised toFeb 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Jan 2024
  • Promised completion24 Feb 2029
  • Revised completionRevised to 24 Feb 2029 (originally 24 Oct 2028)
  • Buildings1 building record
  • Documents filed72 files

Current status

32%13 of 41 units booked
67.8%Work done, per cost certificate

Figures as on 31 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PLATINUM PLAZANA7714041

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

PLATINUM PLAZA: 47% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 31 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed45

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots45
Closed/Covered15
Open Space30

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area632 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofViracharya Nagri Sahakari Patsantha Maryadit sangli
Secured amountRs 2.00 crore
CERSAI search filedYes
Declared on28 Aug 2025

Approvals and building plan

Sanctioning authoritysangli miraj kupwad municipal corporation
Permissible FSI2951.86
Proposed, not sanctioned2,952 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVENKATESH SENATE 640 KARMAVEER BHAURAO CHOWK SANGLI MIRAJ ROAD SANGLI 416416
Estimated costRs 6.50 cr
Cost incurredRs 4.40 cr
Work done67.75%
BuildingWingEstimatedIncurred
PLATINUM PLAZANARs 6.50 crRs 4.40 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR MAHESH R PATIL
EngineerER HEMANT D MORE
EngineerER SHRIRAM JOSHI
Chartered AccountantPRANIL N PATIL
Chartered AccountantNEELESH KAPASE
PartnerRole in project
ASHOK BABGONDA PATIL-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P53100054213/WarOct 2028 → Feb 2029

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 24 Feb 2029

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1 30-6-2026.pdf31 Jul 2026
Withdrawal Update Form 2File: FORM-2 30-6-2026.pdf31 Jul 2026
Withdrawal Update Form 3File: FORM-3 30-6-2026.pdf31 Jul 2026
Withdrawal Update Form 1File: FORM 1 31-3-2026.pdf23 May 2026
Withdrawal Update Form 2File: FORM 2 31-3-2026.pdf23 May 2026
Withdrawal Update Form 3File: FORM 3 31-3-2026.pdf23 May 2026
Form 2A (FY 2025-2026)File: FORM 2A 2025-2026.pdf23 May 2026
Form 5 (FY 2025-2026)File: Form 5 2025-2026.pdf23 May 2026
Withdrawal Update Form 1File: FORM-1 31-12-2025.pdf2 Feb 2026
Withdrawal Update Form 2File: FORM-2 31-12-2025.pdf2 Feb 2026
Withdrawal Update Form 3File: FORM-3 31-12-2025.pdf2 Feb 2026
Form 2A (FY 2023-2024)File: form 2A 23-24.pdf1 Dec 2025
Form 2A (FY 2024-2025)File: FORM 2A 24-25.pdf1 Dec 2025
Withdrawal Update Form 1File: form 1 30-9-25.pdf24 Nov 2025
Withdrawal Update Form 2File: form 2 30-9-25.pdf24 Nov 2025
Withdrawal Update Form 3File: Form 3 30-09-2025_11zon.pdf24 Nov 2025
Form 5 (FY 2023-2024)File: form 5 24-24.pdf24 Nov 2025
Form 5 (FY 2024-2025)File: form 5 24-25.pdf24 Nov 2025
Withdrawal Update Form 1File: FORM 1.pdf3 Sep 2025
Withdrawal Update Form 2File: FORM 2.pdf3 Sep 2025
Withdrawal Update Form 3File: FORM-3 29-08-25.pdf3 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 .pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 .pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 .pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 14-01-25 .pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 13-01-25.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 10-01-25.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD 01-01-25.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf16 Jul 2024
Details of encumbrances concerned to FinanceFile: encumbrance certificate financial.pdf11 Apr 2024
Details of encumbrances concerned to LegalFile: encumbrance certificate financial.pdf11 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 1-1-24 TO 31-3-24.pdf11 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 1 - 1 24 TO 31 - 3 -24.pdf11 Apr 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf11 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE - 1-1-24 TO 31-3-24.pdf11 Apr 2024
Other - FinanceFile: GAHAN KHAT - VEDIKA PATIL.pdf11 Apr 2024
Other - FinanceFile: GAHANKHAT.pdf11 Apr 2024
Building plan approvalFile: email to rera platinum.pdf18 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: email to rera platinum.pdf18 Nov 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE - LEGAL.pdf26 Oct 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE - LEGAL.pdf26 Oct 2023
Proforma of Allotment letterFile: allotment_compressed.pdf23 Oct 2023
Copy of the legal title reportFile: LEGAL TITLE REPORT 25102023.pdf21 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf21 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate.pdf21 Oct 2023
CERSAI detailsFile: UNDERTAKING.pdf21 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTREST IN OTHER REAL ESTATE ORG.pdf21 Oct 2023
Proforma of Agreement for saleFile: Agreement to Sale - RERA 25102023.pdf21 Oct 2023
Layout approvalFile: NAKASHA.pdf7 Oct 2023
Building plan approvalFile: DWG.pdf7 Oct 2023
Building plan approvalFile: DRAWING.pdf7 Oct 2023
PAN CardFile: PAN.pdf7 Oct 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE - FINANCIAL.pdf7 Oct 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE - FINANCIAL.pdf7 Oct 2023
Copy of Layout Approval (in case of layout)File: NAKASHA.pdf7 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: DWG.pdf7 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: DRAWING.pdf7 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: building permission certificate.pdf7 Oct 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE 05102023.pdf7 Oct 2023
Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION REVISED.pdf7 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE WITH LETTER HEAD.pdf7 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A REVISED_compressed.pdf7 Oct 2023
Deviation Report with respect to Allotment letterFile: ALLOTMENT LETTER THEIR IS NO ANY DEVIATION.pdf7 Oct 2023
Deviation Report with respect to model copy of AgreementFile: IN THE MODEL AGREEMENT FOR SALE IS NO ANY DEVIATION.pdf7 Oct 2023

How this compares with Sangli

32%of this project is bookeddistrict median 16%
11%of Sangli projects moved their completion datethis one moved by 4 months
29%of Sangli registrations have lapsed or been cancelledthis one is on the register

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep PLATINUM PLAZA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR PRIME LPG PUMP790+ in Sangli

2 kmPLATINUM PLAZACompleted 54Lapsed / revoked 16Other 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 93 registered projects within 2 km.

Builder: ASHOK BABGONDA PATIL

ASHOK BABGONDA PATIL has 1 registration on MahaRERA, including PLATINUM PLAZA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if PLATINUM PLAZA is delayed beyond 24 Feb 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PLATINUM PLAZA?

The registered promoter entity is ASHOK BABGONDA PATIL, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PLATINUM PLAZA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PLATINUM PLAZA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PLATINUM PLAZA?

The professionals named in the filing: Architect: AR MAHESH R PATIL; Engineer: ER HEMANT D MORE; Engineer: ER SHRIRAM JOSHI; Chartered Accountant: PRANIL N PATIL; Chartered Accountant: NEELESH KAPASE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PLATINUM PLAZA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PLATINUM PLAZA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PLATINUM PLAZA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.