ReraGenieLog inGet a buyer report

Home / Browse projects / Sangli, Maharashtra / ANANDVAN

Registered No litigation declared Residential / Group Housing project

ANANDVAN

By MILESTONE BUILDERS

RG-MH-91247 · RERA P53100053274 · Last updated on MahaRERA portal: 16 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Feb 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Basement (if any), 75%
36 of 58Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

ANANDVAN is a Residential / Group Housing project by MILESTONE BUILDERS in Sangli, Maharashtra, registered with MahaRERA as P53100053274 on 23 Oct 2023. Possession is promised by 28 Feb 2027. 22 of the 58 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameANANDVAN
  • TypeResidential / Group Housing
  • Location
    • shriramnagar galli no 13
    • near arya hotel wanlesswadi
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • Sangli
    • 416414
  • Pincode416414
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53100053274
  • ReraGenie IDRG-MH-91247

Builder

  • NameMILESTONE BUILDERS
  • Entity typePartnership
  • Partnersanagha salil limaye, NARSU MAHADEV KHOKADE, pramod vasant shete

Key dates

this monthRegisteredOct 2023PromisedFeb 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Oct 2023
  • Promised completion28 Feb 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed73 files

Current status

38%22 of 58 units booked
83.3%Work done, per cost certificate

Figures as on 16 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RESIDENTIAL BUILDING AND ROW HOUSES A AND BNA10858058

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 75%.

RESIDENTIAL BUILDING AND ROW HOUSES A AND B: 68% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)75%
Podiums (if any)75%
Plinth100%
Stilt Floor75%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed144

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots144
Closed/Covered48
Open Space96

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,324 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Dec 2025

Approvals and building plan

Sanctioning authoritySANGLI MIRAJ KUPWAD CORPORATION
Permissible FSI4405.73
Proposed, not sanctioned4,406 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchcivil hospital road sangli
Estimated costRs 7.71 cr
Cost incurredRs 6.42 cr
Work done83.29%
BuildingWingEstimatedIncurred
RESIDENTIAL BUILDING AND ROW HOUSES A AND BNARs 7.71 crRs 6.42 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectmahesh r patil
Engineervarad rajendra dadge
Chartered AccountantSALIL ARVIND LIMAYE
PartnerRole in project
MILESTONE BUILDERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 28 Feb 2027

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 31-12-25.pdf16 May 2026
Withdrawal Update Form 2File: FORM 2 31-12-25.pdf16 May 2026
Withdrawal Update Form 3File: FORM 3 31-12-25.pdf16 May 2026
Withdrawal Update Form 1File: FORM-1 (anandvan) 30-09-25.pdf30 Jan 2026
Withdrawal Update Form 2File: FORM-2 (anandvan) 30-09-25.pdf30 Jan 2026
Withdrawal Update Form 3File: FORM-3 (anandvan) 30-09-25.pdf30 Jan 2026
Withdrawal Update Form 1File: Form 1 30-6-2025.pdf23 Jan 2026
Withdrawal Update Form 1File: Form 1 30-6-2025.pdf23 Jan 2026
Withdrawal Update Form 2File: Form 2 30-6-2025.pdf23 Jan 2026
Withdrawal Update Form 2File: Form 2 30-6-2025.pdf23 Jan 2026
Withdrawal Update Form 3File: Form 3 30-6-2025.pdf23 Jan 2026
Withdrawal Update Form 3File: Form 3 30-6-2025.pdf23 Jan 2026
Form 1File: FORM-1 (Anandvan) 31-03-25 .pdf19 Dec 2025
Form 2File: FORM-2 (Anandvan) 31-03-25 .pdf19 Dec 2025
Form 3File: FORM-3 (Anandvan) 31-03-25 .pdf19 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD (Anandvan) 31-03-25 .pdf19 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 AR CERTIFICATE.pdf12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 05-04-25.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 12-03-25.pdf12 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: SOLD - UNSOLD 31-12-24.pdf12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (1).pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE.pdf8 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (1).pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf8 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf4 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2.pdf4 May 2024
Disclosure of sold/ booked inventoryFile: DISCLOSE SOLD UNSOLD INVENTARY.pdf4 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3.pdf4 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1.pdf16 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2.pdf16 Mar 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf16 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MONEY FORM DESIGNATED ACCOUNT.pdf16 Mar 2024
Building plan approvalFile: dwg colour 2-2_compressed.pdf2 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: dwg colour 2-2_compressed.pdf2 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSE PRAMOD SHETE_compressed.pdf4 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSE JAYRAJ_compressed.pdf4 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSE LIMYE_compressed.pdf4 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSE SWAPNIL_compressed.pdf4 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DOSCLOSE KHOKADE_compressed.pdf4 May 2023
Other - TechnicalFile: SELF DECLARATION.pdf4 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 certificate.pdf13 Apr 2023
Layout approvalFile: plot nakasha.pdf28 Mar 2023
Building plan approvalFile: dwg colour 1-2_compressed.pdf28 Mar 2023
Building plan approvalFile: dwg2_compressed.pdf28 Mar 2023
PAN CardFile: companies pan card.pdf28 Mar 2023
Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf28 Mar 2023
Details of encumbrances concerned to FinanceFile: non encumbrance certificate - to whomsover it may concern.pdf28 Mar 2023
Details of encumbrances concerned to FinanceFile: no encumbrance certificate - legal.pdf28 Mar 2023
Details of encumbrances concerned to LegalFile: non encumbrance certificate - to whomsover it may concern.pdf28 Mar 2023
Details of encumbrances concerned to LegalFile: no encumbrance certificate - legal.pdf28 Mar 2023
Copy of Layout Approval (in case of layout)File: plot nakasha.pdf28 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: dwg colour 1-2_compressed.pdf28 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: dwg2_compressed.pdf28 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: BANDHKAM PERMISSION.pdf28 Mar 2023
Declaration about Commencement CertificateFile: format d revised mile stone -1_compressed.pdf28 Mar 2023
Declaration in FORM BFile: form b-1_compressed.pdf28 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf28 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate.pdf28 Mar 2023
CERSAI detailsFile: undertaking.pdf28 Mar 2023
Proforma of Agreement for saleFile: AGREEMENT TO SALE REVISED 5042023.pdf28 Mar 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL.pdf28 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format a_compressed.pdf28 Mar 2023
Deviation Report with respect to Allotment letterFile: no deviation certificate - 25032023.pdf28 Mar 2023
Deviation Report with respect to model copy of AgreementFile: DEVATION REPORT AGREEMENT TO SALE 05042023.pdf28 Mar 2023

How this compares with Sangli

38%of this project is bookeddistrict median 16%
11%of Sangli projects moved their completion datethis one has not
29%of Sangli registrations have lapsed or been cancelledthis one is on the register

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep ANANDVAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near near arya hotel wanlesswadi790+ in Sangli

2 kmANANDVANCompleted 20Lapsed / revoked 19Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 52 registered projects within 2 km.

Builder: MILESTONE BUILDERS

MILESTONE BUILDERS has 1 registration on MahaRERA, including ANANDVAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if ANANDVAN is delayed beyond 28 Feb 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANANDVAN?

The registered promoter entity is MILESTONE BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANANDVAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ANANDVAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANANDVAN?

The professionals named in the filing: Architect: mahesh r patil; Engineer: varad rajendra dadge; Chartered Accountant: SALIL ARVIND LIMAYE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANANDVAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANANDVAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANANDVAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.