Registration approved Commercial project

Milestone-25

By K. Shrinath Hebbar

RG-KA-27704 · RERA PRM/KA/RERA/1257/334/PR/171118/001112

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Jan 2020Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 57 documents Report an error

Milestone-25 is a Commercial project by K. Shrinath Hebbar in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/171118/001112 on 18 Nov 2017. Possession is promised by 10 Jan 2020. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameMilestone-25
  • TypeCommercial
  • Location
    • Mangalore
    • Dakshina Kannada
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1257/334/PR/171118/001112
  • ReraGenie IDRG-KA-27704

Builder

  • NameK. Shrinath Hebbar
  • Other registrations3 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2017First promiseJan 2019Revised toJan 2020

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on18 Nov 2017
  • Promised completion10 Jan 2020
  • Revised completionRevised to 10 Jan 2020 (originally 10 Jan 2019)
  • Buildings1 building record
  • Documents filed57 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Milestone-25---0138138

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionYes-
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,306 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 36.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPeter Mascharenhas
EngineerShanthilal Jayanthi

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1257/334/PR/191014/001112Jan 2019 → Jan 2020

Reason as filed by the promoterothers

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed57

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/171118/001112 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect Certificate for Work Completion Schedule till DateFile: architect certificate work completion.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engg cert for work completed.pdf-
CA Certificate for Funds UtilizationFile: CA certificate for fund utilization.pdf-
Architect Certificate for Pending Work Completion Schedule.File: architect certificate pending work.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engg certi for work pending.pdf-
CA Certificate for Funds required for Project CompletionFile: CA certificate for funds required.pdf-
AffidavitFile: form b final.pdf-
Latest Encumbrance Certificate-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails (1).xlsx-
Document 1File: final upload for rera 1.pdf-
Document 2File: Affidavit.pdf-
Document 3File: section( 18 )1 act.pdf-
Document 4File: CONCENT LETTERS.pdf-
Document 5File: Bank statement and letter.pdf-
Document 6File: Notarized affidavit of Milestone- 25.pdf-
Document 7File: SEC18(1) ACT.pdf-
MS25 LIcense-
scan_20171104_0011-
site-
MS-25_deed-
ms agreement alotee-
MS25 Land document with form b new-
ms area and section-
site-
allotment-
ms brochure-
ms noc-
final ms specification-
EC-
MS 25 Khata-
MS JD-
Milstone Advocate-
MS 25 Conversion-
ms noc-
Milstone Advocate-
Balance Sheet 2015 - 2016File: Balance sheet.pdf-
Balance Sheet 2014 - 2015File: Balance sheet 14-15.pdf-
Balance Sheet 2013 - 2014File: Balance sheet 13-14.pdf-
Audited Profit and Loss Statement 2015 - 2016File: P&L Account 15-16.pdf-
Audited Profit and Loss Statement 2014 - 2015File: P&L Account 14-15.pdf-
Audited Profit and Loss Statement 2013 - 2014File: P & L Account 13-14.pdf-
Cash Flow Statement 2015 - 2016File: CF 15-16.pdf-
Cash Flow Statement 2014 - 2015File: CF 14-15.pdf-
Auditor's Report 2015 - 2016File: Auditors report.pdf-
Auditor's Report 2014 - 2015File: 3CB 14-15.pdf-
Auditor's Report 2013 - 2014File: 3CB 13-14.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: IT Return AY 16-17.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: IT Return AY 15-16.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: IT Return AY 14-15.pdf-
Form B Final (2)-
Prospectus/BrochureFile: Milestone 25 E-Brochure.pdf-
Advertisement Copy 1File: MS25-REVISED.jpg-
Tower Excel SheetFile: MS25 UPLOAD RERA.xlsx-
Occupancy CertificateFile: MILESTONE 25 completion certificate.pdf-
Completion certificate issued by the competent authorityFile: MILESTONE 25 completion certificate.pdf-
Registered Agreement of SaleFile: Registerd agreement for sale ms25.pdf-
Registered conveyance deed for an individual unitFile: sale deed ms25.pdf-

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one moved by 12 months
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep Milestone-25 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

Builder: K. Shrinath Hebbar

K Shrinath Hebbar has 4 registrations on RERA Karnataka, including Solitaire and Milestone-25. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if Milestone-25 is delayed beyond 10 Jan 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Milestone-25?

The registered promoter entity is K. Shrinath Hebbar. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Milestone-25?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Milestone-25?

The professionals named in the filing: Architect: Peter Mascharenhas; Engineer: Shanthilal Jayanthi. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Milestone-25?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Milestone-25. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Milestone-25 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.