ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / MILAN AURA

Registered No litigation declared Residential / Group Housing project

MILAN AURA

By MILAN INTERBUILT PRIVATE LIMITED

RG-MH-32600 · RERA PR1180002500314 · Last updated on MahaRERA portal: 15 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 17.00 crore secured on the land, in favour of Truhome Finance LTD
  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 18Construction stages doneacross 2 buildings; furthest along: Stilt Floor, 90%
35 of 38Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 15 documents Report an error

MILAN AURA is a Residential / Group Housing project by MILAN INTERBUILT PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as PR1180002500314 on 21 Jul 2025. Possession is promised by 31 Dec 2027. 3 of the 38 units on this registration are recorded sold or booked, and 4 of 18 construction stages are filed complete.

At a glance

Project

  • NameMILAN AURA
  • TypeResidential / Group Housing
  • Location
    • Juhu Cross Road
    • abutting Upasara Lane
    • ANDHERI
    • Mumbai Suburban
    • 400058
  • Pincode400058
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1180002500314
  • ReraGenie IDRG-MH-32600

Builder

  • NameMILAN INTERBUILT PRIVATE LIMITED
  • Entity typeCompany
  • CINU45200MH2005PTC157993
  • GSTIN27AAECM5247L1Z4
  • DirectorNIKHIL DHIRAJLAL SAMANI
  • DirectorsGARIMA NIKHIL SAMANI, BHARAT TULSIDAS AMLANI
  • Other registrations5 more →
  • Completed3 of 6
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredJul 2025PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Jul 2025
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed15 files

Current status

8%3 of 38 units booked
15.9%Work done, per cost certificate

Figures as on 15 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
milan auraWING-A10924024
milan auraWING-B9814014

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 15 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 18 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 90%.

milan aura · wing WING-A38%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor90%
Slabs of Super Structure27%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks21%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
milan aura · wing WING-B38%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor90%
Slabs of Super Structure27%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks21%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed45

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots45
Stilt / Ground19
Stack Parking26
BuildingStilt / GroundStack ParkingTotal
milan aura WING-A91322
milan aura WING-B101323

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,358 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofTruhome Finance LTD
Secured amountRs 17.00 crore
CERSAI search filedYes
Declared on24 Jan 2026
LandownerVillageDistrict
friends home cooperative housing society limitedAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI3242.69
Proposed, not sanctioned3,243 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVISHAL SHOPPING CENTRESIR M.V. ROAD OPP. GYMKHANAANDHERI E MUMBAI MAHARASHTRA 400069
Estimated costRs 20.40 cr
Cost incurredRs 3.24 cr
Work done15.87%
BuildingWingEstimatedIncurred
milan auraWING-ARs 10.20 crRs 1.62 cr
milan auraWING-BRs 10.20 crRs 1.62 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHARISH GANDHI BUILDING CONSULTANTS LLP
EngineerJACOB BASTYAW DSOUZA
Chartered AccountantNEHALI AND CO
PartnerRole in project
MILAN INTERBUILT PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Apr 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed15

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf15 Jun 2026
Withdrawal Update Form 2File: ENGINEER FORM 2 MILAN AURA - MARCH 26 latest.pdf15 Jun 2026
Withdrawal Update Form 3File: Resigned 05-06-2026 CA Certificate Milan aura_m26 signed from 3.pdf15 Jun 2026
Layout approvalFile: Plans_1-1 highlighted.pdf9 Apr 2026
Layout approvalFile: Plans_2-end.pdf9 Apr 2026
Building plan approvalFile: IOD.pdf9 Apr 2026
Withdrawal Update Form 1File: MILAN AURA Form 1 2026 01 10 signed.pdf10 Feb 2026
Withdrawal Update Form 2File: ENGINEER FORM 2 MILAN AURA DEC 25 SIGNED.pdf10 Feb 2026
Withdrawal Update Form 3File: Form 3 CA Certificate Milan aura dec 25 promoter signed.pdf10 Feb 2026
Withdrawal Update Form 1File: MILAN AURA Form 1 Arch Certicifate July to Sep.pdf5 Feb 2026
Withdrawal Update Form 2File: ENGINEER FORM 2 MILAN AURA - july to sep 25 - Signed.pdf5 Feb 2026
Withdrawal Update Form 3File: Revised Form 3 Resigned CA Certificate Milan aura_Sept 25 signed.pdf5 Feb 2026
Declaration and undertaking (Annexure A)File: Declaration Undertaking Annexure A - Milan Aura - June 25.pdf26 Jun 2025
Layout approvalFile: IOD approved plans 24-06-2024 (1)_1-1.pdf18 Jun 2025
Building plan approvalFile: IOD approved plans 24-06-2024 (1).pdf30 May 2025

How this compares with Mumbai Suburban

8%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MILAN AURA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ANDHERI6,700+ in Mumbai Suburban

2 kmMILAN AURACompleted 169Lapsed / revoked 99Other 159Dot size: filed unitsN

Filed coordinates, straight-line distance. 427 registered projects within 2 km.

Builder: MILAN INTERBUILT PRIVATE LIMITED

MILAN INTERBUILT PRIVATE LIMITED has 6 registrations on MahaRERA, including MEGHDOOT RESIDENCY and NAZARETH NIKETAN. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if MILAN AURA is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MILAN AURA?

The registered promoter entity is MILAN INTERBUILT PRIVATE LIMITED, a company as per the filing. Its CIN U45200MH2005PTC157993 and GSTIN 27AAECM5247L1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MILAN AURA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MILAN AURA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MILAN AURA?

The professionals named in the filing: Architect: HARISH GANDHI BUILDING CONSULTANTS LLP; Engineer: JACOB BASTYAW DSOUZA; Chartered Accountant: NEHALI AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MILAN AURA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MILAN AURA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MILAN AURA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.