Home / Browse projects / Raigarh, Maharashtra / MICRON RESIDENCY
MICRON RESIDENCY
By MICRON INFRA
RG-MH-94668 · RERA P51700047065 · Last updated on MahaRERA portal: 15 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Possession 3 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MICRON RESIDENCY is a Residential / Group Housing project by MICRON INFRA in Raigarh, Maharashtra, registered with MahaRERA as P51700047065 on 29 Sep 2022. Possession was promised by 31 Jul 2026 and is now 3 months past that date. 31 of the 61 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameMICRON RESIDENCY
- TypeResidential / Group Housing
- Location
- plot no 323 sec 17 ulwe
- ulwe panvel
- Ulawe
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700047065
- ReraGenie IDRG-MH-94668
Builder
- NameMICRON INFRA
- Entity typePartnership
- PartnersSANJAY K INGALE, SAMYAK ROSHANLAL JAIN, sachin tansukhlal jain, sarita vikas gupta, mohnish vikas gupta
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Sep 2022
- Promised completion31 Jul 2026
- Revised completionNone
- Buildings1 building record
- Documents filed75 files
Current status
Figures as on 15 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MICRON RESIDENY | NA | 9 | 9 | 55 | 6 | 61 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
MICRON RESIDENY: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed92
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| MICRON RESIDENY | NA | Rs 5.85 cr | Rs 5.51 cr |
| - | NA | Rs 50.00 lakh | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | identity architect |
| Engineer | optimum consultant |
| Engineer | vijay muttur muttur |
| Chartered Accountant | love kumar maidawat |
| Chartered Accountant | Piyush Ghatliya |
| Partner | Role in project |
|---|---|
| MICRON INFRA | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Aug 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Aug 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Sep 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed75
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: form 1.pdf | 15 May 2026 |
| Withdrawal Update Form 1File: form 1 march 26.pdf | 15 May 2026 |
| Withdrawal Update Form 2File: form 02.pdf | 15 May 2026 |
| Withdrawal Update Form 2File: form 02 march 26.pdf | 15 May 2026 |
| Withdrawal Update Form 3File: form 3 dec 25.pdf | 15 May 2026 |
| Withdrawal Update Form 3File: form 03 march 26.pdf | 15 May 2026 |
| Withdrawal Update Form 1File: Rera progress report 323 ulwe R10-up to June-25.pdf | 24 Dec 2025 |
| Withdrawal Update Form 1File: FORM 02.pdf | 24 Dec 2025 |
| Withdrawal Update Form 2File: form 02_compressed.pdf | 24 Dec 2025 |
| Withdrawal Update Form 2File: form 02 (2)_compressed.pdf | 24 Dec 2025 |
| Withdrawal Update Form 3File: form 3.pdf | 24 Dec 2025 |
| Withdrawal Update Form 3File: FORM 003.pdf | 24 Dec 2025 |
| Withdrawal Update Form 1File: Rera progress report 323 ulwe R10-up to June-25.pdf | 9 Oct 2025 |
| Withdrawal Update Form 2File: ENGINEERu0027S CERTIFICATE.pdf | 9 Oct 2025 |
| Withdrawal Update Form 3File: ilovepdf_merged (1).pdf | 9 Oct 2025 |
| Building plan approvalFile: Micron Infra 3rd CC dwg.pdf | 4 Sep 2025 |
| Withdrawal Update Form 1File: Rera progress report 323 ulwe R10-up to June-25.pdf | 17 Jul 2025 |
| Withdrawal Update Form 2File: ENGINEERu0027S CERTIFICATE.pdf | 17 Jul 2025 |
| Withdrawal Update Form 3File: ilovepdf_merged (1).pdf | 17 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MRU RERA CRT (31-07-26).pdf | 8 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MRU RERA CRT (31-07-26).pdf | 8 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 micron infra.pdf | 8 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE- 31122024.pdf | 8 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Micron Infra Form 5 FY 22-23.pdf | 8 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2a micron infra.pdf | 8 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Micron Infra Form 5 FY 23-24.pdf | 8 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera progress report 323 ulwe R6-May-24.pdf | 23 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera progress report 323 ulwe R7-up to sep-24.pdf | 23 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MICRON RESIDENCY_0001.pdf | 23 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf | 23 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE.pdf | 23 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera progress report 323 ulwe R5-30 April-24_removed (1).pdf | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 03.pdf | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 03_compressed.pdf | 9 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf | 9 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE.pdf | 9 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE_08062024.pdf | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 03.pdf | 30 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 03 (1).pdf | 30 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 31032023.pdf | 7 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 31032024.pdf | 7 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31032024.pdf | 7 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera progress report 323 ulwe R3-SEP-23.pdf | 16 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera progress report 323 ulwe R4-DEC-23.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE- 30092023-1.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE- 31122023-1.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 micron residency 30092023.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 micron infra 31122023.pdf | 16 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MInfra Architects Certificate 30-12-22.pdf | 11 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MInfra Architects Certificate 30-03-23.pdf | 11 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MInfra -Architects Certificate 30-06-23.pdf | 11 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE- 31-12-2022.pdf | 11 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE- 31-03-2023.pdf | 11 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE- 31-03-2023.pdf | 11 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MI-Rera Certificate (31-12-22)_11zon.pdf | 11 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MI-Rera Certificate (31-03-23)_11zon.pdf | 11 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MI-Rera Certificate (30-06-23)_11zon.pdf | 11 Jul 2023 |
| Deviation Report with respect to Allotment letterFile: ALLOMENT LETTER DEVIATION.pdf | 14 Sep 2022 |
| Deviation Report with respect to model copy of AgreementFile: AGREEMENT FOR SALE DEVIALTION.pdf | 14 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 MICRON INRA.pdf | 10 Sep 2022 |
| Other - FinanceFile: scan (2)_11zon.pdf | 10 Sep 2022 |
| Layout approvalFile: HPSC7583.pdf | 29 Aug 2022 |
| PAN CardFile: PAN CARD - MICRON INFRA.pdf | 29 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: HPSC7583.pdf | 29 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC7583.pdf | 29 Aug 2022 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER - MICRON INFRA.pdf | 29 Aug 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: separate bank disclosure.pdf | 29 Aug 2022 |
| Copy of the legal title reportFile: LEGAL TITLE REPORT - MICRON INFRA.pdf | 27 Aug 2022 |
| Details of encumbrances concerned to FinanceFile: no encumbances.pdf | 27 Aug 2022 |
| Details of encumbrances concerned to LegalFile: NO_0001.pdf | 27 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: C C copy plot no 323 ulwe_11zon.pdf | 27 Aug 2022 |
| Declaration about Commencement CertificateFile: format d cc declaration.pdf | 27 Aug 2022 |
| Declaration in FORM BFile: form b.pdf | 27 Aug 2022 |
| CERSAI detailsFile: cersai.pdf | 27 Aug 2022 |
| Proforma of Allotment letterFile: AGREEMENT FOR SALE - MICRON INFRA.pdf | 27 Aug 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 75 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MICRON RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ulwe panvel5,900+ in Raigarh
Filed coordinates, straight-line distance. 286 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: MICRON INFRA
MICRON INFRA has 1 registration on MahaRERA, including MICRON RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if MICRON RESIDENCY is delayed beyond 31 Jul 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MICRON RESIDENCY?
The registered promoter entity is MICRON INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MICRON RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MICRON RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MICRON RESIDENCY?
The professionals named in the filing: Architect: identity architect; Engineer: optimum consultant; Engineer: vijay muttur muttur; Chartered Accountant: love kumar maidawat; Chartered Accountant: Piyush Ghatliya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MICRON RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback