Home / Browse projects / Pune, Maharashtra / MIAMI A6-A7-B1

Registered No litigation declared Residential / Group Housing project

MIAMI A6-A7-B1

By PRIDE BUILDERS LLP

RG-MH-18853 · RERA P52100077670 · Last updated on MahaRERA portal: 21 Apr 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
14 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 85%
84 of 408Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 125 documents Report an error

MIAMI A6-A7-B1 is a Residential / Group Housing project by PRIDE BUILDERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100077670 on 21 Oct 2024. Possession is promised by 31 Dec 2028. 324 of the 408 units on this registration are recorded sold or booked, and 14 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMIAMI A6-A7-B1
  • TypeResidential / Group Housing
  • Location
    • DY PATIL ROAD
    • CHARHOLI
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • RERA no.P52100077670
  • ReraGenie IDRG-MH-18853

Builder

  • NamePRIDE BUILDERS LLP
  • Entity typeOthers
  • GSTIN27AAPFP0869F1ZV
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Authorised SignatorySURYKANTH DHANAWADE DHANAWADE
  • PartnerArvind Jain
  • Other registrations12 more →
  • Completed3 of 13
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date2
  • Declared earlier projects2 →

Key dates

this monthRegisteredOct 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Oct 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed125 files

Current status

79%324 of 408 units booked
58.6%Work done, per cost certificate

Figures as on 21 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A6NA27231350135
A7NA27231350135
B1NA24231380138

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 21 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 85%.

A657%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A761%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.45%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B147%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises22%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed408

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots408
Closed/Covered408
BuildingClosed/CoveredTotal
A6135135
A7135135
B1138138

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,709 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 May 2025

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI67455.0
Proposed, not sanctioned58,656 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchM-4, VIRWANI PLAZA,11, EAST STREET,PUNE
Estimated costRs 204.24 cr
Cost incurredRs 119.73 cr
Work done58.62%
BuildingWingEstimatedIncurred
B1NARs 93.21 crRs 48.70 cr
A6NARs 55.52 crRs 34.38 cr
A7NARs 55.52 crRs 36.65 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPATIL & BUGADE ASSOCIATES
ArchitectAVINASH PATIL & ASSOCIATES
EngineerDNYANESHWAR RAJENDRA MANE
EngineerSHANTANU GANJAVE
Chartered AccountantSAC & CO LLP
Chartered AccountantShah Khandelwal Jain & Associates
PartnerRole in project
PRIDE BUILDERS LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12500101Ram GawaliPRIDE BUILDERS LLP02/09/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed125

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 125 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: QTY ASSURANCE CERT FORM 2A MIAMI A6A7B1.pdf21 Apr 2026
Withdrawal Update Form 1File: Form 1 Miami A6-A7-B1.pdf16 Apr 2026
Withdrawal Update Form 2File: Form 2 Miami A6-A7-B1.pdf16 Apr 2026
Withdrawal Update Form 3File: Form 3 Miami A6-A7-B1.pdf16 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf30 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf30 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf30 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 upload.pdf2 Dec 2025
Withdrawal Update Form 1File: Form 1.pdf1 Dec 2025
Withdrawal Update Form 2File: Form 2.pdf1 Dec 2025
Withdrawal Update Form 3File: Form 3.pdf1 Dec 2025
Form 1File: Form 1.pdf16 Oct 2025
Form 2File: Form 2.pdf16 Oct 2025
Form 3File: Form 3.pdf16 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sld circular.pdf16 Oct 2025
Form 1File: ARCHITECT CERT MIAMI A6 A7 30062025.pdf16 Oct 2025
Form 2File: ENGINEER CERT MIAMI A6 A7 B1 30062025.pdf16 Oct 2025
Form 3File: Form 3.pdf16 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold circular.pdf16 Oct 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Miami.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT MIAMI 31032025.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT MIAMI 31032025.pdf11 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QTY ASSURANCE CERT MIAMI 31032025.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERT MIAMI A6 A7 B1 16012025.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arcihtect MIAMI.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT MIAMI 31122024.pdf10 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY CERT MIAMI A6 A7 B1.pdf10 Jan 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER LEGAL 10092024.pdf8 Oct 2024
Other - LegalFile: 7-12 Miami.pdf8 Oct 2024
Other - LegalFile: Sale deed 131 1 and 131 2_11zon.pdf8 Oct 2024
Other - LegalFile: Sale deed 135 2 and 135 6_11zon.pdf8 Oct 2024
Other - LegalFile: Sale deed rest all-1-66_11zon.pdf8 Oct 2024
Other - LegalFile: Sale deed rest all-67-132_11zon.pdf8 Oct 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER LEGAL 10092024.pdf8 Oct 2024
Other - TechnicalFile: 1 Other - Technical (4) (1).pdf8 Oct 2024
Other - TechnicalFile: 1 Other - Technical (4) (1).pdf8 Oct 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER LEGAL 10092024.pdf8 Oct 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER LEGAL 10092024.pdf8 Oct 2024
Other - LegalFile: 7-12 Miami.pdf8 Oct 2024
Other - LegalFile: Sale deed 131 1 and 131 2_11zon.pdf8 Oct 2024
Other - LegalFile: Sale deed 135 2 and 135 6_11zon.pdf8 Oct 2024
Other - LegalFile: Sale deed rest all-1-66_11zon.pdf8 Oct 2024
Other - LegalFile: Sale deed rest all-67-132_11zon.pdf8 Oct 2024
Declaration about Commencement CertificateFile: CC FORM D DECLARATION.pdf7 Oct 2024
CERSAI detailsFile: CERSAI CERTIFICATE MIAMI 10092024.pdf7 Oct 2024
CERSAI detailsFile: CERSAI CERTIFICATE MIAMI 10092024.pdf7 Oct 2024
Declaration about Commencement CertificateFile: CC FORM D DECLARATION.pdf7 Oct 2024
Building plan approvalFile: Plan b1 (3).pdf6 Oct 2024
Building plan approvalFile: Plan b1 (2).pdf6 Oct 2024
Building plan approvalFile: Plan B1 (1).pdf6 Oct 2024
Building plan approvalFile: Plan B1.pdf6 Oct 2024
Building plan approvalFile: Plan b1 (4).pdf6 Oct 2024
Building plan approvalFile: Plan 4.pdf6 Oct 2024
Building plan approvalFile: Plan 2.pdf6 Oct 2024
Building plan approvalFile: Plan 3.pdf6 Oct 2024
Building plan approvalFile: Plan rest pgs.pdf6 Oct 2024
Building plan approvalFile: Plan 1.pdf6 Oct 2024
Layout approvalFile: Plan.pdf6 Oct 2024
Layout approvalFile: Plan.pdf6 Oct 2024
Building plan approvalFile: Plan 1.pdf6 Oct 2024
Building plan approvalFile: Plan rest pgs.pdf6 Oct 2024
Building plan approvalFile: Plan 3.pdf6 Oct 2024
Building plan approvalFile: Plan 2.pdf6 Oct 2024
Building plan approvalFile: Plan 4.pdf6 Oct 2024
Building plan approvalFile: Plan b1 (4).pdf6 Oct 2024
Building plan approvalFile: Plan B1.pdf6 Oct 2024
Building plan approvalFile: Plan B1 (1).pdf6 Oct 2024
Building plan approvalFile: Plan b1 (2).pdf6 Oct 2024
Building plan approvalFile: Plan b1 (3).pdf6 Oct 2024
PAN CardFile: PAN.pdf6 Oct 2024
Copy of the legal title reportFile: Title Merged.pdf6 Oct 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Finance.pdf6 Oct 2024
Copy of Layout Approval (in case of layout)File: Plan.pdf6 Oct 2024
Proforma of Allotment letterFile: AL.pdf6 Oct 2024
Declaration in FORM BFile: FORM B DECLARATION 10092024.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf6 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf6 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan B1 (1).pdf6 Oct 2024

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise4 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
MANHATTANP52100026529CHARHOLI BK, Pune-Sep 2020OngoingOct 2024Not delivered
MANHATTANP52100026529CHARHOLI BK, Pune-Sep 2020OngoingOct 2024Not delivered
MANHATTANP52100026529CHARHOLI BK, Pune-Sep 2020OngoingOct 2024Not delivered
MANHATTANP52100026529CHARHOLI BK, Pune-Sep 2020OngoingOct 2024Not delivered
BROOKLYNS NO 129 CHARHOLI NEAR DY PATIL COLLEGE PUNE550-CompletedDec 2016Oct 2016

How this compares with Pune

79%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MIAMI A6-A7-B1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHARHOLI13,700+ in Pune

Builder: PRIDE BUILDERS LLP

PRIDE BUILDERS LLP has 13 registrations on MahaRERA, including MANHATTAN and ATLANTIC. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MIAMI A6-A7-B1 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MIAMI A6-A7-B1?

The registered promoter entity is PRIDE BUILDERS LLP, an others as per the filing. Its GSTIN 27AAPFP0869F1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MIAMI A6-A7-B1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MIAMI A6-A7-B1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MIAMI A6-A7-B1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MIAMI A6-A7-B1?

The professionals named in the filing: Architect: PATIL & BUGADE ASSOCIATES; Architect: AVINASH PATIL & ASSOCIATES; Engineer: DNYANESHWAR RAJENDRA MANE; Engineer: SHANTANU GANJAVE; Chartered Accountant: SAC & CO LLP; Chartered Accountant: Shah Khandelwal Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MIAMI A6-A7-B1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MIAMI A6-A7-B1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MIAMI A6-A7-B1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.