Home / Browse projects / Nagpur, Maharashtra / METROCITY VI
METROCITY VI
RG-MH-86202 · RERA P50500050247 · Last updated on MahaRERA portal: 14 Nov 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 3 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
METROCITY VI is a Plotted project by Metrocity Projects in Nagpur, Maharashtra, registered with MahaRERA as P50500050247 on 27 Mar 2023. The registration is recorded completed; possession was promised by 31 Dec 2028. 100 of the 100 units on this registration are recorded sold or booked.
At a glance
Project
- NameMETROCITY VI
- TypePlotted
- Location
- WARDHA ROAD
- GAWASI MANAPUR
- Nagpur (Rural)
- Nagpur
- 441108
- Pincode441108
- RERA no.P50500050247
- ReraGenie IDRG-MH-86202
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on27 Mar 2023
- Promised completion31 Dec 2028
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed60 files
Current status
Figures as on 14 Nov 2024, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 14 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | UMESH LAMGE |
| Engineer | SUYOG DANGE |
| Chartered Accountant | PAYAL TAORI |
| Chartered Accountant | MJM ASSOCIATES |
| Chartered Accountant | SALONI BANG & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Metrocity Projects | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Mar 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Mar 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Mar 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 14 Nov 2024
Documents filed60
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: NMRDA Completion Letter.pdf | 14 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Revised form 4 M 6_compressed.pdf | 14 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Metrocity 6_compressed.pdf | 2 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_1_11zon.pdf | 23 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_2_11zon.pdf | 23 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: M 6 DSBI_3_11zon.pdf | 23 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM-3 M-6_compressed.pdf | 10 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 M6_compressed.pdf | 1 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 M-6_compressed.pdf | 1 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A M-6_compressed.pdf | 1 May 2024 |
| Disclosure of sold/ booked inventoryFile: DSBi -Jan-Mar 24.pdf | 18 Apr 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 29 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Decl_n Form 3.pdf | 24 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 11 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 11 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 11 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: M-6 DSBI.pdf | 11 Jan 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ilovepdf_merged (1).pdf | 19 Dec 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ilovepdf_merged (2)_compressed-1-3.pdf | 19 Dec 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ilovepdf_merged (2)_compressed-4-5.pdf | 19 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 q-Jan-Mar dt 23-11-23.PDF | 4 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 q-apr-jun dt 23-11-23.PDF | 4 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form -5 Metrocity -6_compressed.pdf | 1 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_uplaoded dt 20-4-2023_compressed.pdf | 23 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_uploaded dt 10-10-2023_compressed.pdf | 23 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mc 6.pdf | 16 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: DSBI 10_10_23.pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 18-10-23_compressed.pdf | 19 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFCATE.pdf | 17 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 20_7_23.pdf | 17 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 10_10_23.pdf | 17 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 17 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: DSBI 11_10_23_compressed.pdf | 17 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: DSBI 11_10_23__new.pdf | 17 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: DSBI_20_4_23_new_compressed.pdf | 3 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: DSBI_20_7_23_new_compressed.pdf | 3 Oct 2023 |
| CERSAI detailsFile: CERSAI_Search_Report.pdf | 15 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 14 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 14 Mar 2023 |
| Proforma of Agreement for saleFile: AFS.pdf | 14 Mar 2023 |
| Declaration in FORM BFile: Form B_Affidavit.pdf | 4 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexxure-A.pdf | 4 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure-A 1_compressed.pdf | 4 Mar 2023 |
| Layout approvalFile: Map.pdf | 2 Mar 2023 |
| Building plan approval or NA orderFile: Map.pdf | 2 Mar 2023 |
| PAN CardFile: 1 PAN Card_Metrocity projects.pdf | 2 Mar 2023 |
| Copy of the legal title reportFile: TITLE REPORT_.pdf | 2 Mar 2023 |
| Details of encumbrances concerned to FinanceFile: NIL FINANCIAL ENCUMBERANCE CERTIFICATE.pdf | 2 Mar 2023 |
| Details of encumbrances concerned to FinanceFile: NIL LEGAL ENCUMBERANCE CERTIFICATE.pdf | 2 Mar 2023 |
| Details of encumbrances concerned to LegalFile: NIL FINANCIAL ENCUMBERANCE CERTIFICATE.pdf | 2 Mar 2023 |
| Details of encumbrances concerned to LegalFile: NIL LEGAL ENCUMBERANCE CERTIFICATE.pdf | 2 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: Map.pdf | 2 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Map.pdf | 2 Mar 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: NMRDA_compressed.pdf | 2 Mar 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: NA ORDER M 6_compressed.pdf | 2 Mar 2023 |
| Declaration about Commencement CertificateFile: Format D.pdf | 2 Mar 2023 |
| Proforma of Allotment letterFile: LETTER OF ALLOTMENT__compressed.pdf | 2 Mar 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Revised Bank Account Declaration.pdf | 2 Mar 2023 |
| Deviation Report with respect to Allotment letterFile: No deviation AL_.pdf | 2 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: No deviation AFS_.pdf | 2 Mar 2023 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| METROCITY VI | MOUZA GAWASI MANAPUR NAGPUR RURAL | - | Ongoing | Dec 2028 | Dec 2028 |
| METROCITY V | MOUZA GAWASI MANAPUR NAGPUR RURAL | - | Completed | Dec 2023 | Dec 2023 |
| Metyrocity Homes | Kanyakapuram Manish Society Dabha Ring Road Nagpur | 85 | Completed | Dec 2018 | Dec 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 5 other registrations, which the RERA portal never shows together
- All 60 filed documents as one ZIP, foldered, with a manifest
Keep METROCITY VI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near GAWASI MANAPUR2,800+ in Nagpur
Kanher Nagri Developers
KANHER NAGRI DEVELOPERS
MAHALAXMI NAGAR 6
MAHALAXMI ESTATE
MAHALAXMI NAGAR 4
PADMALAXMI DEVELOPERS
Moreshwar park 4
PRASANNA PLANNERS
PRIME PLATINUM
UMAKANT VITTHAL MENDHE
MAULI NAGAR 8
MAULI INFRATECH
See every Nagpur project, with the district possession charts
Builder: Metrocity Projects
Metrocity Projects has 6 registrations on MahaRERA, including Metrocity 1 and Metrocity-3. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if METROCITY VI is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of METROCITY VI?
The registered promoter entity is Metrocity Projects, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in METROCITY VI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for METROCITY VI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at METROCITY VI?
The professionals named in the filing: Architect: UMESH LAMGE; Engineer: SUYOG DANGE; Chartered Accountant: PAYAL TAORI; Chartered Accountant: MJM ASSOCIATES; Chartered Accountant: SALONI BANG & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in METROCITY VI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback